Bricklaying in Oban

Get Bricklaying Prices in Oban

Home > General Building Projects > Bricklayers > Oban

Bricklaying in Oban

Extensions will require brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For some conversions, the garage door is infilled and a brick wall with one or two windows is added to the front or side of the house.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they'll require extra insulation. Normally, this is achieved with the addition of interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork will have to adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

Unlike numerous beliefs, a bricklayer really does greater than laying of blocks. There's even more to being a bricklayer than you can possibly think of. A solitary bricklaying jobs calls for a vast selection of abilities. Allow's take a look at these abilities!

  • Utilizing moist resistant materials to secure structures.
  • Spreading out mortar in between joints and applying them to act as a thick layer binding the bricks together in rows.
  • Checking out and also working from requirements as well as plans.
  • Collaborating with brick-cutting devices.
  • Taking charge and taking care of cement blocks or blocks, clay blocks and also the sort.
  • Building and construction of scaffolding - based on belongings of some licenses in some states.

This is not merely an visual choice, as matching existing brickwork might be a requirement of planning permission or building regulations in your area. We will supply up to 4 Bricklayers pros in your area, who will certainly offer quotations for the work you desire done. You'll receive a property visit from specialists in Oban that'll aid you to choose the appropriate Bricklayers for your residence prior to carrying out the setup. Enter your postcode to begin browsing now.

Average Bricklayers cost in Oban

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Oban, as reported by local LeadsDoWork members.

Bricklayers installation cost in Oban 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in January 2025

Bricklayers Projects in Oban in December 2024

877

Requests for quotations in Oban in December 2024

0

Requests for Bricklayers quotations in Oban in December 2024. 0% change from November 2024.

0

Requests for Bricklayers quotations in Argyll in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Oban December 2024

Oban

Oban is a resort community within the Argyll and Bute council area of Scotland. Despite its little size, it is the biggest town between Helensburgh and also Fort William. Throughout the vacationer season, the community can play host to up to 25,000 people. Oban inhabits a setup in the Firth of Lorn. The bay is a near best horseshoe, safeguarded by the island of Kerrera; and also beyond Kerrera, the Isle of Mull. To the north is the long low island of Lismore and also the hills of Morvern and Ardgour. Laurinburg, North Carolina (United States) ended up being a sister city to Oban in 1993. The preliminary contract was between Scotland Region, North Carolina, and also Argyll & Bute Area Council. Adhering to reorganisation in 1995, the arrangement was confirmed by Argyll & Bute Council in 1997. In 1997 Oban was also twinned with Gorey, Region Wexford, in Ireland. Also twinned with Sarajevo. The local society is Gaelic. In 2011, 8.2% of the town's population over age 3 could talk Gaelic and 11.3% had some facility in the language. [10] Oban is taken into consideration the house of the Royal National Mòd, since it was first held there in 1892, with ten competitors on a Saturday mid-day. The community held the centenary Mod in 1992 (the year it ended up being Royal) and also in 2003 the 100th Mod, both occasions attracting thousands of rivals as well as site visitors (the 100th Mod was behind the centenary due to the fact that it was not held in the war years). The Mod is held in Oban roughly every 6-- 8 years, and also has last been held in October 2015.

Looking for Bricklayers in Oban?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Oban

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Oban.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Oban

Customer Reviews

Overall rating:


Oban Bricklayers installers are rated 0 out of 5 based on 0 reviews of 11 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Oban Bricklayers contractors

Are you a builder in Oban?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today