Bricklaying in Nuneaton

Request Bricklaying Prices in Nuneaton

Home > General Building Projects > Bricklayers > Nuneaton

Bricklaying in Nuneaton

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with a couple of windows is added to the front or side of the house.

 

This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the outer brickwork walls, they might require supplemental insulation. This is usually achieved by adding interior wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to create a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the house.

 

In contrast to lots of ideas, a bricklayer in fact does greater than laying of bricks. There's even more to being a bricklayer than you can probably consider. A single bricklaying jobs needs a large range of abilities. Let's look at these skills!

  • Utilizing moist resistant materials to secure foundations.
  • Spreading out mortar in between joints as well as applying them to work as a thick layer binding the bricks with each other in rows.
  • Checking out and functioning from specs as well as plans.
  • Collaborating with brick-cutting devices.
  • Taking charge and also taking care of concrete blocks or bricks, clay blocks and also the sort.
  • Building and construction of scaffolding - subject to property of some licenses in some states.

This is not just an cosmetic choice, as complementing existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will give approximately four Bricklayers pros locally, who will provide quotes for the job you desire done. You'll receive a property visit from specialists in Nuneaton who'll aid you to pick the appropriate Bricklayers for your home prior to accomplishing the installation. Enter your postal code to begin browsing currently.

Average Bricklayers cost in Nuneaton

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2025

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Nuneaton, as reported by local LeadsDoWork members.

Bricklayers installation cost in Nuneaton 2025

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in February 2025

Bricklayers Projects in Nuneaton in January 2025

1,469

Requests for quotations in Nuneaton in January 2025

0

Requests for Bricklayers quotations in Nuneaton in January 2025. 0% change from December 2024.

0

Requests for Bricklayers quotations in Warwickshire in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Nuneaton January 2025

Nuneaton

Nuneaton is the largest sized town in the Borough of Nuneaton and Bedworth, found in the region of Warwickshire towards the west of England close to Wales. Eleven electoral wards make up the large town, bringing an overall total populace to 78,000. The metropolitan area is based upon the Nuneaton town along with other small towns and villages in close proximity. If you'd like to boost your house, make sure to just use reputable experts for a good quality finish.

Looking for Bricklayers in Nuneaton?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Nuneaton

21 Jun

Building work | Bricklaying

Nuneaton - CV10

Enquiry from: Samantha D

Start Date: Immediate

a fire wall needs to be built in the loft above my kitchen between myself and my neighbour. are you the property owner: owner of the property property type: semi detached how much work would you say n...

Post a similar request >

02 Mar

Building work | Bricklaying

Nuneaton - CV11

Enquiry from: Peter R

Start Date: Immediate

Brick/block laying, terrace of 4 new build 2 storey houses, currently at dpc

Post a similar request >

02 May

Building work | Bricklaying

Coventry - CV3

Enquiry from: Tajinder P

Start Date: Immediate

I need a bricklayer who can repair a brick wall

Post a similar request >

22 Jun

Building work | Bricklaying

Rugby - CV22

Enquiry from: Mike S

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead

i have 8 coping stones (4x 350/900. 4x 300/900) at the front of the property and 6 coping stones at the rear (350x900), to flat roofs. both will need replacing, at the rear about 8-10 frost damaged fa...

Post a similar request >

08 Jun

Building work | Bricklaying

Coventry - CV6

Enquiry from: Sudha K

Start Date: Immediate

to rebuild a raised flower bed at the top corner of the driveway are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do...

Post a similar request >

03 Feb

Building work | Bricklaying

Coventry Southern Satellite Villages & Kenilworth - CV8

Enquiry from: Jordi F

Start Date: Immediate

we want to have a chimney stack built so that a log burner can be installed. currently, the house does not have a chimney stack, so foundations would be required. are you the property owner: owner of...

Post a similar request >

23 Jul

Building work | Bricklaying

Coventry - CV2

Enquiry from: Viva C

Start Date: Immediate

3 small retaining walls in garden are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the bricks to be supp...

Post a similar request >

15 Jul

Building work | Bricklaying

Coventry Southern Satellite Villages & Kenilworth - CV8

Enquiry from: Tony F

Start Date: Immediate

low accident damaged wall rebuild using existing bricks. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you requi...

Post a similar request >

14 May

Building work | Bricklaying

Coventry N&W Satellite Villages - CV7

Enquiry from: Kamran K

Start Date: Immediate

3 x 3 bedroom new build houses, brickwork required for substructure and superstructure. are you the property owner: owner of the property property type: semi detached how much work would you say need...

Post a similar request >

25 Mar

Building work | Bricklaying

Coventry - CV6

Enquiry from: Barry J

Start Date: Immediate

single course, non-load bearing wall surrounding pedestrian door has developed a 3 foot vertical crack about 12" from frame. crack opens as door is operated. i assume it needs mortar grinding out to f...

Post a similar request >

27 Nov

Building work | Bricklaying

Rugby - CV21

Enquiry from: Karen S

Start Date: Immediate

11 metres of garden (retainer) wall, double skin, 0.45 height. a further 9 metres of single skin wall, 0.45 high. both walls to mount feather board fence panels. are you the property owner: owner of t...

Post a similar request >

29 Sep

Building work | Bricklaying

Coventry - CV3

Enquiry from: Sabrina S

Start Date: Immediate

taking the brick shell off of the property and replacing with new bricks are you the property owner: owner of the property property type: detached how much work would you say needs to be done: lots of...

Post a similar request >

19 Feb

Building work | Bricklaying

Coventry - CV2

Enquiry from: Simeon C

Start Date: Immediate

A window in a ground floor brick extension needs removing and bricking up, and an insulated stud wall adding on the inside Are you the property owner: Owner of the property Property Type: Semi detache...

Post a similar request >

09 Jul

Building work | Bricklaying

Coventry - CV6

Enquiry from: Hannah B

Start Date: Less than one month

Hello the brickwork under the ground floor bay window seems to have efflorescence on it. This is causing them to crumble and the outer layer of the bricks has come away on a handful of bricks. Are you...

Post a similar request >

20 Apr

Building work | Bricklaying

Rugby - CV22

Enquiry from: David S

Start Date: 1 to 3 months

A back door and a fireplace that that needs removing and bricking up.

Post a similar request >

05 Dec

Building work | Bricklaying

Coventry - CV2

Enquiry from: Amritpal S

Start Date: Less than one month

The work is to complete a block of flats. There is around 7000 block to be put on up to and including wall plate Are you the property owner: Owner of the property Property Type: Detached How much wo...

Post a similar request >

20 May

Building work | Bricklaying

Coventry - CV4

Enquiry from: Dawn P

Start Date: Immediate

Home owner Removal of a small front wall Time scale immediate Contact to Appoint *

Post a similar request >

Local & reliable builders near me

Tell us about your bricklayers project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Nuneaton

Get free, no-obligation local bricklayers quotes from 4 verified builders working in Nuneaton.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

What is the ratio of sand and cement for bricklaying?

When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.

Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.

Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.

Placholder Image

Other Top Projects in Nuneaton

Customer Reviews

Overall rating:


Nuneaton Bricklayers installers are rated 4.9 out of 5 based on 2 reviews of 21 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Bricklayers projects that have been connected with Bricklayers pros to help them. All Bricklayers contractors All Nuneaton Bricklayers contractors

Are you a builder in Nuneaton?

We can help you get more bricklayers work with our qualified job leads and boost your business.

Join today