Bricklaying in Bedworth

Request Bricklaying Prices in Bedworth

Home > General Building Projects > Bricklayers > Bedworth

Bricklaying in Bedworth

Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the house.

 

This solid wall will demand foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will require extra insulation. This is usually achieved with the addition of internal wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again reliant on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to take into account the existing brickwork of the house.

 

Contrary to many beliefs, a bricklayer actually does greater than laying of blocks. There's more to being a bricklayer than you can most likely think about. A solitary bricklaying tasks requires a large variety of skills. Allow's look at these abilities!

  • Using damp resistant materials to secure foundations.
  • Spreading out mortar between joints as well as applying them to serve as a thick layer binding the bricks with each other in rows.
  • Checking out as well as functioning from specs along with plans.
  • Dealing with brick-cutting devices.
  • Taking charge as well as caring for concrete blocks or bricks, clay blocks and the sort.
  • Building of scaffolding - based on ownership of some licenses in some states.

This is not only an aesthetic choice, as complementing existing brickwork is possibly a condition of planning permission or building regulations in your area. We will provide as much as 4 Bricklayers pros in your area, who will provide quotations for the work you desire done. You'll get a property visit from experts in Bedworth that'll assist you to select the ideal Bricklayers for your house before accomplishing the installation. Enter your postal code to begin browsing now.

Average Bricklayers cost in Bedworth

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Bedworth, as reported by local LeadsDoWork members.

Bricklayers installation cost in Bedworth 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in November 2024

Bricklayers Projects in Bedworth in October 2024

1,187

Requests for quotations in Bedworth in October 2024

0

Requests for Bricklayers quotations in Bedworth in October 2024. 0% change from September 2024.

0

Requests for Bricklayers quotations in Warwickshire in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Bedworth October 2024

Bedworth

The market town of Bedworth is located in the district of Warwickshire and features a population of 32,268. It's situated between Coventry and Nuneaton, and made from six major districts. If you're ever interested in upgrading your property, be sure to work with just vetted and respected suppliers in the region to ensure a top quality finish and review quotations for the best cost available.

Looking for Bricklayers in Bedworth?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Bedworth

20 Oct

Building work | Bricklaying

Bedworth - CV12

Enquiry from: Nick D

Start Date: Immediate

New conservatory dwarf walls required approx laying 350 bricks and 110 blocks. How much would you charge for doing this job? Are you the property owner: Owner of the property Property Type: Semi de...

Post a similar request >

02 May

Building work | Bricklaying

Coventry - CV3

Enquiry from: Tajinder P

Start Date: Immediate

I need a bricklayer who can repair a brick wall

Post a similar request >

22 Jun

Building work | Bricklaying

Rugby - CV22

Enquiry from: Mike S

Start Date: Immediate

Bricklayers Lead Bricklayers Lead Bricklayers Lead

i have 8 coping stones (4x 350/900. 4x 300/900) at the front of the property and 6 coping stones at the rear (350x900), to flat roofs. both will need replacing, at the rear about 8-10 frost damaged fa...

Post a similar request >

08 Jun

Building work | Bricklaying

Coventry - CV6

Enquiry from: Sudha K

Start Date: Immediate

to rebuild a raised flower bed at the top corner of the driveway are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do...

Post a similar request >

03 Feb

Building work | Bricklaying

Coventry Southern Satellite Villages & Kenilworth - CV8

Enquiry from: Jordi F

Start Date: Immediate

we want to have a chimney stack built so that a log burner can be installed. currently, the house does not have a chimney stack, so foundations would be required. are you the property owner: owner of...

Post a similar request >

23 Jul

Building work | Bricklaying

Coventry - CV2

Enquiry from: Viva C

Start Date: Immediate

3 small retaining walls in garden are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do you require the bricks to be supp...

Post a similar request >

15 Jul

Building work | Bricklaying

Coventry Southern Satellite Villages & Kenilworth - CV8

Enquiry from: Tony F

Start Date: Immediate

low accident damaged wall rebuild using existing bricks. are you the property owner: owner of the property property type: detached how much work would you say needs to be done: small job do you requi...

Post a similar request >

25 Mar

Building work | Bricklaying

Coventry - CV6

Enquiry from: Barry J

Start Date: Immediate

single course, non-load bearing wall surrounding pedestrian door has developed a 3 foot vertical crack about 12" from frame. crack opens as door is operated. i assume it needs mortar grinding out to f...

Post a similar request >

27 Nov

Building work | Bricklaying

Rugby - CV21

Enquiry from: Karen S

Start Date: Immediate

11 metres of garden (retainer) wall, double skin, 0.45 height. a further 9 metres of single skin wall, 0.45 high. both walls to mount feather board fence panels. are you the property owner: owner of t...

Post a similar request >

29 Sep

Building work | Bricklaying

Coventry - CV3

Enquiry from: Sabrina S

Start Date: Immediate

taking the brick shell off of the property and replacing with new bricks are you the property owner: owner of the property property type: detached how much work would you say needs to be done: lots of...

Post a similar request >

19 Feb

Building work | Bricklaying

Coventry - CV2

Enquiry from: Simeon C

Start Date: Immediate

A window in a ground floor brick extension needs removing and bricking up, and an insulated stud wall adding on the inside Are you the property owner: Owner of the property Property Type: Semi detache...

Post a similar request >

09 Jul

Building work | Bricklaying

Coventry - CV6

Enquiry from: Hannah B

Start Date: Less than one month

Hello the brickwork under the ground floor bay window seems to have efflorescence on it. This is causing them to crumble and the outer layer of the bricks has come away on a handful of bricks. Are you...

Post a similar request >

20 Apr

Building work | Bricklaying

Rugby - CV22

Enquiry from: David S

Start Date: 1 to 3 months

A back door and a fireplace that that needs removing and bricking up.

Post a similar request >

05 Dec

Building work | Bricklaying

Coventry - CV2

Enquiry from: Amritpal S

Start Date: Less than one month

The work is to complete a block of flats. There is around 7000 block to be put on up to and including wall plate Are you the property owner: Owner of the property Property Type: Detached How much wo...

Post a similar request >

20 May

Building work | Bricklaying

Coventry - CV4

Enquiry from: Dawn P

Start Date: Immediate

Home owner Removal of a small front wall Time scale immediate Contact to Appoint *

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Bedworth

Get free, no-obligation quotes from 4 verified Builders working in Bedworth.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How much do bricklayers charge?

Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!

Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.

You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

Placholder Image

Other Top Projects in Bedworth

Are you a builder in Bedworth?

We can help you get more Bricklayers work and boost your business.

Join today