Building work | Bricklaying
Ayr - KA8
Enquiry from: John M
Start Date: Immediate
Wall, either breeze block or composite, roughly 15ft long by 6 ft high with topping brick.
Extensions will typically need brickwork of some form, either to infill the existing gaps or to add insulation to existing brick walls. For many conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of the home.
This solid wall will demand foundations or lintel supports which might or might not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the exterior brickwork walls, they'll require additional insulation. This is usually done by adding internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again determined by the existing garage foundations. In addition, if any of the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
Contrary to many ideas, a bricklayer in fact does more than laying of bricks. There's even more to being a bricklayer than you can most likely think about. A single bricklaying tasks needs a large array of skills. Allow's have a look at these abilities!
This is not simply an aesthetic decision, as matching existing brickwork is possibly a condition of planning permission or building regulations in your area. We will supply as much as four Bricklayers pros in your area, who will certainly provide quotes for the work you want done. You'll get a property visit from specialists in Ayr that'll assist you to choose the appropriate Bricklayers for your house prior to performing the setup. Enter your postal code to begin searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Ayr in March 2025
Requests for Bricklayers quotations in Ayr in March 2025. 0% change from February 2025.
Requests for Bricklayers quotations in Ayrshire in March 2025. 0% change from February 2025.
Ayr is both a town and port, found on the Firth of Clyde within Scotland's southwest. Ayr is the greatest town in the Ayrshire County and it's home to 46,000 people, losing out on city standing to Sterling in 2002 as part of the Queen's Golden Jubilee celebrations. Ayr is the twelfth major urban area in Scotland with only 0.36% speaking Scottish Gaelic. For the household upgrades projects you're looking at in the Ayr region, look at quotations from vetted experts to get the best price for the work you need done.
Ayr - KA8
Enquiry from: John M
Start Date: Immediate
Wall, either breeze block or composite, roughly 15ft long by 6 ft high with topping brick.
Ayr - KA6
Enquiry from: Ian V
Start Date: Immediate
repair of hole in wall to next door (semi). the hole is located under the floor in the living room and is big enough for someone to crawl through. it was discovered during recent rennovation work. are...
Ayr - KA7
Enquiry from: Angela W
Start Date: Immediate
roughly 12mtr hedge removed and replace with 12mtr long by 1 metre high cotswold stone also front partial wooden porch replaced with same brick as wall are you the property owner: owner of the propert...
Ayr - KA6
Enquiry from: David G
Start Date: 1 to 3 months
Demolishing old wall and rebuild to include a new front gate. Reposition steps to front door, remove existing pebble dash and finish with a smooth weatherproof render on front of property. Also some f...
Kilmarnock - KA2
Enquiry from: Greta A
Start Date: Less than one month
bricks repointing and slabs made safe are you the property owner: owner of the property what type of work do you need to have done: brick work, garden work do you have the materials you need in order ...
Kilmarnock - KA1
Enquiry from: Alan M
Start Date: Immediate
sloped ramp at garage door are you the property owner: owner of the property property type: other do you require the bricks to be supplied too: no property type: semi detached how much work would you...
Prestwick - KA9
Enquiry from: Manjit K
Start Date: Immediate
needs a monoblock at back garden are you the property owner: owner of the property property type: semi detached how much work would you say needs to be done: medium job do you require the bricks to be...
Prestwick - KA9
Enquiry from: Stephen K
Start Date: Immediate
rebuild front garden wall and two gate posts. are you the property owner: owner of the property property type: detached do you require the bricks to be supplied too: yes how much work would you say n...
Irvine - KA11
Enquiry from: James R
Start Date: Immediate
need two old outside bin cupboard doors bricked up. are you the property owner: owner of the property property type: semi detached do you require the bricks to be supplied too: yes how much work would...
Prestwick - KA9
Enquiry from: Martin M
Start Date: Immediate
Repair internal hole in chimney located in attic
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Ayr.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today