Wooden Decking in Craven Arms

Obtain Wooden Decking Prices in Craven Arms

Home > Gardening & Landscaping Projects > Wooden decking > Craven Arms

Wooden Decking in Craven Arms

Wooden decking is an increasingly prevalent choice for creating outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very beautiful spaces which you can use year round by installing external heating and illumination. Wooden decking is often fitted in locations in front of patio or French doors where they can create a smooth transition between interior and exterior spaces. Wooden decking can come in virtually any size or shape to suit any area. Curved designs or large areas linked by pathways can create a stunning effect. Wooden decking is relatively quick to install and causes little disruption, especially in comparison to alternate options like patio or paving. It could even be installed over the top of an existing patio. It is essential however to make sure that your wooden decking is structurally sound and capable of taking the weight of any furniture or plants that you want to use on the decking. There is a selection of species of wood that can be used in wooden decking. Commonly decking is made of hardwood, but there are softwoods available that fulfil the durability requirements. As hardwood decking will demand maintenance, which generally requires annual cleaning and staining for weather proofing, composite woods are becoming popular for use in wooden decking as they are more robust and require much less maintenance.

Average Wooden decking cost in Craven Arms

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2025

Avg. price low

Avg. price low
£663

Avg. price

Avg. price
£1,300

Avg. price high

Avg. price high
£1,863

£2000

£1500

£1000

£500

£0

Prices based on actual Wooden decking costs for Craven Arms, as reported by local LeadsDoWork members.

Wooden decking installation cost in Craven Arms 2025

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in February 2025

Wooden decking Projects in Craven Arms in January 2025

100

Requests for quotations in Craven Arms in January 2025

0

Requests for Wooden decking quotations in Craven Arms in January 2025. 0% change from December 2024.

0

Requests for Wooden decking quotations in Shropshire in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Craven Arms January 2025

Craven Arms

Craven Arms (population 2,289) is a village as well as civil parish in Shropshire, England, on the A49 road as well as the Welsh Marches railway line, which connect it north and also southern to the bigger towns of Shrewsbury and also Ludlow respectively. The Heart of Wales railway line signs up with the Welsh Marches line at Craven Arms and also the community is offered by Craven Arms railway station. The community is confined to the north by the Shropshire Hills Area of Outstanding Natural Beauty, as well as to the south is the strengthened manor house of Stokesay Castle. Craven Arms is a market community for the bordering backwoods, with a number of stores, financial institutions, estate agents, a grocery store, an abattoir and lots of commercial/light commercial companies. It is additionally a visitor location, being house or close-by to a number of tourist attractions, and being central for site visitors to the location of outstanding natural elegance. It defines itself as the "Gateway to the Marches".

Looking for Wooden decking in Craven Arms?

Get free quotes from local carpenters

Get free quotes

Local & reliable carpenters near me

Tell us about your wooden decking project

Answer a few quick questions, so we can match you with local carpenters who can help.

Find up to 4 carpenters in Craven Arms

Get free, no-obligation local wooden decking quotes from 4 verified carpenters working in Craven Arms.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
Placholder Image

Other Top Projects in Craven Arms

Customer Reviews

Overall rating:


Craven Arms Wooden decking installers are rated 4.1 out of 5 based on 5 reviews of 60 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Wooden decking projects that have been connected with Wooden decking pros to help them. All Wooden decking contractors All Craven Arms Wooden decking contractors

Are you a carpenter in Craven Arms?

We can help you get more wooden decking work with our qualified job leads and boost your business.

Join today