Wooden Decking in Castlewellan

Discover Wooden Decking Prices in Castlewellan

Home > Gardening & Landscaping Projects > Wooden decking > Castlewellan

Wooden Decking in Castlewellan

Wooden decking is an increasingly common choice for providing outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very elegant areas that can be used year round by installing external heating and lighting. Wooden decking is typically fitted in locations in front of patio or French doors where they can create a seamless transition between inside and outside spaces. Wooden decking is available in any size or shape to accommodate any area. Curved designs or large areas connected by pathways can produce a stunning effect. Wooden decking is relatively quick to install and causes little disruption, especially in comparison to alternatives like patio or paving. It can even be installed over the top of a pre-existing patio. It is necessary however to be certain that your wooden decking is structurally sound and able to take the load of any furniture or plants that you would like to use on the decking. There is a choice of species of wood that can be used in wooden decking. Normally decking is constructed from hardwood, but there are softwoods available that fulfil the durability specifications. As hardwood decking will demand maintenance, which typically includes annual cleaning and staining for weather proofing, composite woods are becoming popular for use in wooden decking because they are stronger and require significantly less maintenance.

Average Wooden decking cost in Castlewellan

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2024

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Castlewellan, as reported by local LeadsDoWork members.

Wooden decking installation cost in Castlewellan 2024

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in November 2024

Wooden decking Projects in Castlewellan in October 2024

76

Requests for quotations in Castlewellan in October 2024

0

Requests for Wooden decking quotations in Castlewellan in October 2024. 0% change from September 2024.

0

Requests for Wooden decking quotations in County Down in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Castlewellan October 2024

Northern Ireland is the Irish area of the United Kingdom, with the Republic of Ireland providing the remainder of the island. It comes with a population of just over 1.8 million, plus a population density of 133 people per square kilometre. This population is just 3% of the United Kingdom and 28% of people on the island of Ireland. Northern Ireland’s capital city of Belfast holds the most significant population of around 340,000, while Derry and Lisburn have 100,000 and 45,000 respectively. For all your home improvement projects in Northern Ireland, use reputable specialists to make sure you get a high-quality finish.

Looking for Wooden decking in Castlewellan?

Get free quotes from local carpenters

Get free quotes

How it works

Tell us about your Wooden decking project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Carpenters in Castlewellan

Get free, no-obligation quotes from 4 verified Carpenters working in Castlewellan.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
Placholder Image

Other Top Projects in Castlewellan

Are you a carpenter in Castlewellan?

We can help you get more Wooden decking work and boost your business.

Join today