Wooden Decking in Fochabers

Compare Wooden Decking Prices in Fochabers

Home > Gardening & Landscaping Projects > Wooden decking > Fochabers

Wooden Decking in Fochabers

Wooden decking is an increasingly common option for providing outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very elegant areas that can be used year round by installing additional heating and illumination. Wooden decking is commonly installed in locations in front of patio or French doors where they can create a seamless transition between interior and exterior spaces. Wooden decking is available in any size or shape to match any area. Curved designs or large areas connected by pathways can produce an attractive effect. Wooden decking is relatively simple to install and causes minimal disruption, especially in comparison to alternatives like patio or paving. It could even be installed over the top of an existing patio. It is essential however to be certain that your wooden decking is structurally sound and capable of taking the weight of any furniture or plants that you want to use on the decking. There is a variety of varieties of wood that can be used in wooden decking. Normally decking is made of hardwood, but there are softwoods available that fulfil the durability requirements. As hardwood decking will demand maintenance, which commonly will involve annual cleaning and staining for weather proofing, composite woods have become more popular for use in wooden decking because they are more robust and require significantly less maintenance.

Average Wooden decking cost in Fochabers

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2024

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Fochabers, as reported by local LeadsDoWork members.

Wooden decking installation cost in Fochabers 2024

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in September 2024

Wooden decking Projects in Fochabers in August 2024

62

Requests for quotations in Fochabers in August 2024

0

Requests for Wooden decking quotations in Fochabers in August 2024. 0% change from July 2024.

0

Requests for Wooden decking quotations in Morayshire in August 2024. 0% change from July 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Fochabers August 2024

Fochabers

Fochabers is a town in the Parish of Bellie, in Moray, Scotland, 10 miles (16 kilometres) east of the cathedral city of Elgin and also located on the eastern financial institution of the River Spey. 1,728 individuals stay in the town, which enjoys a rich music as well as social history. The village is likewise residence to Baxters, the family-run producer of foods items. The town owes its existence to Alexander Gordon, fourth Duke of Gordon (1743-1827). During the late-eighteenth century, during the Scottish Enlightenment, it was classy for landowners to discovered new communities and also villages; these can be acknowledged all over Scotland, due to the fact that unlike their predecessors they all have right, large roads in mostly rectangular layouts, a main square, and your houses developed with their major altitudes alongside the street. The occupants took advantage of more sizable homes, as well as the Battle each other, it has to be said, gained from not having the hoi polloi living in hovels precisely the front door of Gordon Castle. Fochabers was founded in 1776, and also is among the most effective instances of a planned village. It is a sanctuary, with most of the buildings in the High Street noted as being of historical or architectural rate of interest, as is Bellie Kirk, the Roman Catholic church St. Mary's Fochabers, which houses works by significant craftsmen, and the Episcopalian church, Gordon Chapel, which flaunts the biggest collection of Pre-Raphaelite tarnished glass in Scotland. Electricity was brought to the village in 1906 by Charles Gordon-Lennox, 7th Duke of Richmond provided from a tiny hydro-electric generating terminal integrated in 1905 in the Quarters district on the financial institutions of the fast-flowing Spey. For a while in the mid-twentieth century, Fochabers was the house of 3 duchesses - Hilda, Duchess of Richmond as well as Gordon; Ivy, Duchess of Rose City as well as Helen, Duchess of Northumberland. Between 1893 as well as 1966 the village had a railway station, Fochabers Community, although after 1931 this was open only to products. For virtually three years, individuals of Fochabers campaigned for a bypass, as the town is situated on the A96, the only direct route from Aberdeen to Inverness, and consequently deals with significant traffic issues. Construction work on a bypass for Fochabers as well as the adjoining village of Mosstodloch began on 2 February 2010 and was completed in January 2012, at an expense of £31,500,000. The task was substantially postponed because of conflict concerning the suggested path, as well as exploration of a Neolithic settlement on the site of the bypass.

Looking for Wooden decking in Fochabers?

Get free quotes from local carpenters

Get free quotes

How it works

Tell us about your Wooden decking project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Carpenters in Fochabers

Get free, no-obligation quotes from 4 verified Carpenters working in Fochabers.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Placholder Image

Other Top Projects in Fochabers

Are you a carpenter in Fochabers?

We can help you get more Wooden decking work and boost your business.

Join today