Wooden Decking in Chorley

Find Wooden Decking Prices in Chorley

Home > Gardening & Landscaping Projects > Wooden decking > Chorley

Wooden Decking in Chorley

Wooden decking is an increasingly fashionable choice for creating outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very fashionable spaces which you can use year round by installing external heating and light. Wooden decking is frequently fitted in locations in front of patio or French doors where they can create a smooth transition between inside and outside spaces. Wooden decking is available in virtually any size or shape to match any area. Curved designs or large areas linked by pathways can produce a stunning effect. Wooden decking is relatively easy to install and causes little disruption, especially in comparison to alternatives like patio or paving. It can even be installed over the top of a pre-existing patio. It is critical however to make certain that your wooden decking is structurally sound and capable of taking the weight of any furniture or plants that you want to use on the decking. There is a variety of types of wood that can be used in wooden decking. Typically decking is constructed from hardwood, but there are softwoods available that fulfil the durability specifications. As hardwood decking will need maintenance, which typically will involve yearly cleaning and staining for weather proofing, composite woods have become popular for use in wooden decking as they are stronger and require much less maintenance.

Average Wooden decking cost in Chorley

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2025

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Chorley, as reported by local LeadsDoWork members.

Wooden decking installation cost in Chorley 2025

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in January 2025

Wooden decking Projects in Chorley in December 2024

835

Requests for quotations in Chorley in December 2024

0

Requests for Wooden decking quotations in Chorley in December 2024. 0% change from November 2024.

0

Requests for Wooden decking quotations in Lancashire in December 2024. 0% change from November 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Chorley December 2024

Chorley

The market town within Lancashire is the largest settlement inside the Borough of Chorley. It's just 8.1 miles north of Wigan and has now a population of 31,556. The town of Chorley is found in the North West of England and contains history stretching back to the Roman age. For all property developments within Chorley, ensure to make use of vetted professionals in the area to guarantee a top-notch finish at an fantastic price.

Looking for Wooden decking in Chorley?

Get free quotes from local carpenters

Get free quotes

Similar Customer Enquiries for Wooden decking in Chorley

15 May

Garden | Decking

Chorley - PR7

Enquiry from: Stephen H

Start Date: Immediate

replace existing wooden decking area with new decking are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call ...

Post a similar request >

01 Mar

Garden | Decking

Chorley - PR7

Enquiry from: Alison C

Start Date: Immediate

customer in chorley area has requested that we arrange quotes for their wooden decking project.mrs are considering various options and would like to discuss with a carpenter directly.please call to di...

Post a similar request >

17 Jul

Garden | Decking

Chorley - PR6

Enquiry from: Barry H

Start Date: Immediate

roughly 4 mtr x 5 mtr deck with with steps down from door. removal of old wooden deck, new deck to be from composite under rails and decking planks. are you the property owner: owner of the property...

Post a similar request >

23 Feb

Garden | Decking

Chorley - PR7

Enquiry from: Brian H

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Raised decking and patio

Post a similar request >

20 Apr

Garden | Decking

Chorley - PR7

Enquiry from: Joe O

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Major revamp front and back gardens

Post a similar request >

23 Nov

Garden | Decking

Chorley - PR6

Enquiry from: Deborah L

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: We are looking to take out the garden and replace with patio court garden and a...

Post a similar request >

05 Feb

Garden | Decking

Chorley - PR6

Enquiry from: Frank M

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Deck board replacement

Post a similar request >

21 Aug

Garden | Decking

Chorley - PR6

Enquiry from: Janene H

Start Date: Less than one month

Timber decking 4m2. It needs to be on a base as we want the decking level with the conservatory door entrance. This will go upto a soiled area. We will need two steps down to access the gate. No b...

Post a similar request >

28 Mar

Garden | Decking

Chorley - PR6

Enquiry from: Colin A

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Semi detached Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

25 Feb

Garden | Decking

Chorley - PR6

Enquiry from: Kev M

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Semi detached Other Forms: 92 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

18 Oct

Garden | Decking

Chorley - PR7

Enquiry from: Lisa G

Start Date: 1 to 3 months

Decking rear garden Are you the property owner: Owner of the property Property Type: Semi detached What level of service do you require: Supply and deck Time scale: 1-3 months

Post a similar request >

13 Apr

Garden | Decking

Chorley - PR7

Enquiry from: Bailey W

Start Date: Immediate

After a 6 x 4 , 24m2 hardwood decking, no rails, gorund is prepped and ready for work to begin.decking will b off the house from patio doors . Looking to get started asap. Are you the property owne...

Post a similar request >

Local & reliable carpenters near me

Tell us about your wooden decking project

Answer a few quick questions, so we can match you with local carpenters who can help.

Find up to 4 carpenters in Chorley

Get free, no-obligation local wooden decking quotes from 4 verified carpenters working in Chorley.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Placholder Image

Other Top Projects in Chorley

Customer Reviews

Overall rating:


Chorley Wooden decking installers are rated 4.3 out of 5 based on 8 reviews of 68 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Wooden decking projects that have been connected with Wooden decking pros to help them. All Wooden decking contractors All Chorley Wooden decking contractors

Are you a carpenter in Chorley?

We can help you get more wooden decking work with our qualified job leads and boost your business.

Join today