Internal or partition walls can be moved or knocked through in your home, which can transform the room layout and create a substantial open plan room design for a generous living space or a kitchen diner. When moving or knocking through interior walls, it is vital to understand both the kind of internal wall that it is, and whether it's a load bearing wall. Internal walls might be brick or block partitions, timber stud partitions, or even prefabricated wall panels. There are no shortcuts when it comes to determining whether a wall is load bearing or not, it's always worth engaging the services of a structural engineer if you are unsure or cannot view original plans for your property. Load bearing walls can be relocated, but this is typically more expensive and involves using additional load bearing solution, for example steel lintels. Moving or knocking through internal walls will usually entail demolition of the pre-existing wall, reconstructing or restoring the new walls, replastering and moving electrics. It could additionally demand alterations to the floor, as sometimes the floors between rooms will not be entirely level, and knocking through interior walls can expose this. Generally moving interior walls will not require planning permission, but you'll need to conform to building regulations for insulation and sound proofing. Consulting a structural engineer will ensure that any internal wall changes that you plan on doing will keep your premises structurally sound.

Average Plasterboard dry lining cost in Moffat

The average cost of Plasterboard dry lining is £850. Costs vary based upon the materials and the tradesman hired. The upper price range can be as high as £977.5. The material costs are in most cases around £212.5

Average price per Plasterboard dry lining job in 2024

Avg. price low

Avg. price low
£638

Avg. price

Avg. price
£850

Avg. price high

Avg. price high
£978

£1100

£825

£550

£275

£0

Prices based on actual Plasterboard dry lining costs for Moffat, as reported by local LeadsDoWork members.

Plasterboard dry lining installation cost in Moffat 2024

Labour cost £595
Material cost £213
Waste removal £43
Time frame: 1-2 days

Plasterboard dry lining searches in November 2024

Plasterboard dry lining Projects in Moffat in October 2024

122

Requests for quotations in Moffat in October 2024

0

Requests for Plasterboard dry lining quotations in Moffat in October 2024. 0% change from September 2024.

0

Requests for Plasterboard dry lining quotations in Dumfriesshire in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Plasterboard dry lining searches in cities and towns near Moffat October 2024

Moffat

Moffat is a previous burgh and parish in Dumfriesshire, which is now part of the Dumfries and Galloway neighborhood authority area in Scotland, pushing the River Annan, with a population of around 2,500. It was a centre of the wool trade and a health spa town. Moffat is around 59 mi (95 kilometres) to the southeast of Glasgow, 51 mi (82 kilometres) to the south of Edinburgh, 21 mi (34 kilometres) to the north of Dumfries and also 44 mi (71 km) to the north of Carlisle. The Moffat House Resort, situated at the north end of the High Road, was developed by John Adam. The neighboring Star Hotel, a mere 20 ft (6 m) vast, was provided in the Guinness Book of Records as the narrowest hotel on the planet. Moffat won the Britain in Bloom competition in 1996. Moffat is the residence to Moffat toffee. The community is held to be the ancestral seat of Clan Moffat. The Devil's Beef Tub near Moffat was used by the participants of Clan Moffat and later on the participants of Clan Johnstone to hoard livestock swiped in predatory raids.

Looking for Plasterboard dry lining in Moffat?

Get free quotes from local builders

Get free quotes

How it works

Tell us about your Plasterboard dry lining project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Builders in Moffat

Get free, no-obligation quotes from 4 verified Builders working in Moffat.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.