Stud Wall/Plasterboarding in Carluke

Find Stud Wall/Plasterboarding Prices in Carluke

Home > Plastering & Ceilings Projects > Plasterboard dry lining > Carluke

Stud Wall/Plasterboarding in Carluke

Internal or partition walls can be moved or knocked through in your house, which can change the area layout and establish a more substantial open plan room design for a generous living space or a kitchen diner. When moving or knocking through interior walls, it is necessary to understand both the sort of interior wall that it is, and whether it's a load bearing wall. Internal walls can be brick or block partitions, timber stud partitions, or even prefabricated wall panels. There are no shortcuts when it comes to ascertaining whether a wall is load bearing or not, it is advisable to engage the services of a structural engineer if you are uncertain or are not able to view original plans for your property. Load bearing walls can be moved, but this may also be more costly and involves installing additional load bearing solution, for example steel lintels. Moving or knocking through internal walls will usually entail demolition of the pre-existing wall, reconstructing or repairing the new walls, replastering and moving electrics. It could also necessitate changes to the floor, as in some cases the floors between rooms aren't totally level, and knocking through interior walls can expose this. Generally moving internal walls will not require planning permission, but you will need to conform to building regulations for insulation and sound proofing. Consulting with a structural engineer will ensure that any internal wall changes that you intend on doing will keep your premises structurally sound.

Average Plasterboard dry lining cost in Carluke

The average cost of Plasterboard dry lining is £850. Costs vary based upon the materials and the tradesman hired. The upper price range can be as high as £977.5. The material costs are in most cases around £212.5

Average price per Plasterboard dry lining job in 2025

Avg. price low

Avg. price low
£638

Avg. price

Avg. price
£850

Avg. price high

Avg. price high
£978

£1100

£825

£550

£275

£0

Prices based on actual Plasterboard dry lining costs for Carluke, as reported by local LeadsDoWork members.

Plasterboard dry lining installation cost in Carluke 2025

Labour cost £595
Material cost £213
Waste removal £43
Time frame: 1-2 days

Plasterboard dry lining searches in February 2025

Plasterboard dry lining Projects in Carluke in January 2025

430

Requests for quotations in Carluke in January 2025

0

Requests for Plasterboard dry lining quotations in Carluke in January 2025. 0% change from December 2024.

0

Requests for Plasterboard dry lining quotations in Lanarkshire in January 2025. 0% change from December 2024.

Source: Numbers calculated based on the search volumes in major search engines

Plasterboard dry lining searches in cities and towns near Carluke January 2025

Carluke

Carluke is a town situated in the centre of the Lanarkshire countryside in South Lanarkshire, Scotland. It's 4.7 miles northwest of Lanark and 4.2 miles southeast of Wishaw, sitting on a high plateau overseeing the River Clyde, directly in the middle of Lanarkshire's fruit growing region. In accordance with a population survey in 2008, it has a permanent population of around 19500, which makes it the Clyde Valley's most populated town. Carluke's expansion started most swiftly during the time of the industrial revolution, with corn milling, cotton weaving, coal mining along with the manufacture of bricks, glass, confectionary and jam becoming the town's most important industries. Now, Carluke is predominantly a commuting town. The town is served by dual carriageways connecting it to the M8 and M74, and it also benefits from frequent trains to Lanark, Motherwell, Hamilton, Glasgow and Edinburgh. In spite of this, there are numerous big employers based within the town. Due to Carluke's proximity to Clyde Valley's main fruit growers, the jam business, Renshaw Scott, is a significant employer, which developed further by recently adding a chocolate refinery to their plant. Main redevelopment works have been completed in the town since the start of the 21st century. There is a sizeable quantity of independent stores and supermarkets in the vibrant and newly regenerated town centre, with residents of neighbouring villages, including Braidwood, Forth, Kilncadzow and Law, making use of the wide selection of shops and services that may be found in Carluke. In 2010, a '1.1 million indoor soft play and cafe', 'The Bubbles Factory', was constructed, which was voted 'The best Play in the UK'. For all of your house upgrades, be sure that you use trustworthy specialists in Carluke to make sure that you get the very best quality.

Looking for Plasterboard dry lining in Carluke?

Get free quotes from local builders

Get free quotes

Local & reliable builders near me

Tell us about your plasterboard dry lining project

Answer a few quick questions, so we can match you with local builders who can help.

Find up to 4 builders in Carluke

Get free, no-obligation local plasterboard dry lining quotes from 4 verified builders working in Carluke.

Hire with confidence

Compare customer reviews, services and prices, and choose the right tradesperson for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Placholder Image

Other Top Projects in Carluke

Customer Reviews

Overall rating:


Carluke Plasterboard dry lining installers are rated 0 out of 5 based on 0 reviews of 19 pros.
The LeadsDoWork rating and review is an overall rating based on verified reviews and feedback from the customers with Plasterboard dry lining projects that have been connected with Plasterboard dry lining pros to help them. All Plasterboard dry lining contractors All Carluke Plasterboard dry lining contractors

Are you a builder in Carluke?

We can help you get more plasterboard dry lining work with our qualified job leads and boost your business.

Join today