Wooden Decking in Llanfairpwllgwyngyll

Compare Wooden Decking Prices in Llanfairpwllgwyngyll

Home > Gardening & Landscaping Projects > Wooden decking > Llanfairpwllgwyngyll

Wooden Decking in Llanfairpwllgwyngyll

Wooden decking is an increasingly common option for creating outdoor seating areas in gardens. Due to the natural beauty of wood, they can be very elegant areas which you can use year round with the addition of additional heating and lighting. Wooden decking is typically fitted in locations in front of patio or French doors where they can create a seamless transition between interior and exterior spaces. Wooden decking is available in any size or shape to accommodate any area. Curved designs or large areas joined by pathways can produce an attractive effect. Wooden decking is relatively simple to install and causes minimal disruption, especially in comparison to alternate options like patio or paving. It can even be installed over the top of an existing patio. It is necessary however to be sure that your wooden decking is structurally sound and able to take the weight of any furniture or plants that you want to use on the decking. There is a selection of varieties of wood that can be used in wooden decking. Generally decking is constructed from hardwood, but there are softwoods available that fulfil the durability specifications. As hardwood decking will demand maintenance, which usually includes annual cleaning and staining for weather proofing, composite woods are becoming popular for use in wooden decking because they are stronger and require significantly less maintenance.

Average Wooden decking cost in Llanfairpwllgwyngyll

The typical cost of Wooden decking is £1500. Costs can change based upon the materials and the firm hired. The upper price range can be as high as £1725. The material costs are commonly approximately £375

Average price per Wooden decking job in 2024

Avg. price low

Avg. price low
£1,125

Avg. price

Avg. price
£1,500

Avg. price high

Avg. price high
£1,725

£1900

£1425

£950

£475

£0

Prices based on actual Wooden decking costs for Llanfairpwllgwyngyll, as reported by local LeadsDoWork members.

Wooden decking installation cost in Llanfairpwllgwyngyll 2024

Labour cost £1,050
Material cost £375
Waste removal £75
Time frame: 1-4 days

Wooden decking searches in November 2024

Wooden decking Projects in Llanfairpwllgwyngyll in October 2024

202

Requests for quotations in Llanfairpwllgwyngyll in October 2024

0

Requests for Wooden decking quotations in Llanfairpwllgwyngyll in October 2024. 0% change from September 2024.

0

Requests for Wooden decking quotations in Gwynedd in October 2024. 0% change from September 2024.

Source: Numbers calculated based on the search volumes in major search engines

Wooden decking searches in cities and towns near Llanfairpwllgwyngyll October 2024

Llanfairpwllgwyngyll

Llanfairpwllgwyngyllgogerychwyrndrobwllllantysiliogogogoch, main short form name Llanfairpwllgwyngyll, also meant Llanfair Pwllgwyngyll, is a huge town and local government area on the island of Anglesey in Wales. It is located on the Menai Strait next to the Britannia Bridge as well as throughout the strait from Bangor. Whilst the main short form name is used in official contexts, both the full name and also reduced(Llanfairpwll or Llanfair PG) kinds of the place name are made use of in various contexts. At the 2001 census, the population of the neighborhood was 3,040. By the time of the 2011 Census the population had increased to 3,107, of whom 71%could speak Welsh. It is the 6th largest settlement on the island by population. The long form of the name, with 58 characters divided right into 19 syllables, is the lengthiest name in Europe as well as the 2nd longest main one-word place name in the world. Although this name is typically specified to have actually been developed in the 1860s for advertising functions, a likewise prolonged version was recorded as early as 1849.

Looking for Wooden decking in Llanfairpwllgwyngyll?

Get free quotes from local carpenters

Get free quotes

How it works

Tell us about your Wooden decking project

Answer a few quick questions, so we can match you with professionals who can help.

Find up to 4 Carpenters in Llanfairpwllgwyngyll

Get free, no-obligation quotes from 4 verified Carpenters working in Llanfairpwllgwyngyll.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

Our reviews

Average

Would highly recommend

Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.

Good easy way to find a selection of…

Good easy way to find a selection of trades you need all in one place.

Love LeadsDoWork it's a big part of my …

Love LeadsDoWork it's a big part of my Business I would recommend to anyone

FAQs

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
Placholder Image

Other Top Projects in Llanfairpwllgwyngyll

Are you a carpenter in Llanfairpwllgwyngyll?

We can help you get more Wooden decking work and boost your business.

Join today