Driveway Repair
Longfield - DA3
Enquiry from: Anne B
Start Date: Immediate
Repair/replace block paving driveway with improved drainage after collapsing when sand was washed out by recent storm.
-->
Over 370 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Driveway Installers near you
Longfield - DA3
Enquiry from: Anne B
Start Date: Immediate
Repair/replace block paving driveway with improved drainage after collapsing when sand was washed out by recent storm.
Longfield - DA3
Enquiry from: Kelly W
Start Date: Immediate
customer has a paving & driveways project they are looking to have done, specially they want quotes for slab paving. they are unsure of options so would like to discuss with a driveway installer.confi...
Longfield - DA3
Enquiry from: Valerie S
Start Date: Immediate
customer in longfield area has requested that we arrange quotes for their home improvements project.mrs are considering various options and would like to discuss with a builder directly.please call to...
Longfield - DA3
Enquiry from: Valerie S
Start Date: Immediate
customer visited the mydrivewayprices.co.uk site and submitted an enquiry. property type: detached property owner: owner, work description: fill entrance and opening to my drive with matching aggrega...
Longfield - DA3
Enquiry from: Cheryl D
Start Date: Immediate
extend patio area have paving slabs roughly 38 cleared area
Longfield - DA3
Enquiry from: Paul J
Start Date: Immediate
Block pave or tarmac 100 square foot to mitres
Longfield - DA3
Enquiry from: Diljit B
Start Date: Immediate
Can I get a quote for 1000m2 of Resin Bond and also for the Tarmac to place under. Are you the property owner: Owner of the property Do you require: Resin Patterned What work do you need to have done...
Longfield - DA3
Enquiry from: Digna Q
Start Date: 1 to 3 months
Are you the property owner: Owner of the property Property Type: Detached Other Forms: None Please call to appoint
Longfield - DA3
Enquiry from: Digna Q
Start Date: 1 to 3 months
Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Work description: I am looking for someone to dig up and install a driveway...
Longfield - DA3
Enquiry from: Keith B
Start Date: Immediate
Block paving Are you the property owner: Owner of the property Property Type: Terrace Do you require: Block Paving Location: Rear What work is required: Path, Patio What level of service do you requir...
Longfield - DA3
Enquiry from: Hayley J
Start Date: Immediate
Lay block paving 7 metres by 2.5 metres
Longfield - DA3
Enquiry from: Sally W
Start Date: Immediate
Lift existing slabs and level the ground and replace existing slabs. Area measures approx 25 feet wide x 8 feet deep. Are you the property owner: Owner of the property Property Type: Terrace Locat...
Longfield - DA3
Enquiry from: Alison M
Start Date: 1 to 3 months
Property type: Detached, Property owner: Owner, Work description: 114square metres block paving Are you the property owner: Owner of the property Property Type: Detached Do you require: Block P...
Longfield - DA3
Enquiry from: Gemma W
Start Date: Immediate
Homeowner Supplied and fitted Please contact to appoint
Are you planning to install a driveway on your home or property? If yes, then you’ll most likely be interested to know exactly how much it’s going to cost. Well, to get started you’ll have to decide whether you’ll be doing this yourself or perhaps you’d be hiring a specialist. The project could be much more effective if you decide to tackle it on your own as you’re only going to be worried about the paying for the materials without any labour costs. However, installing a driveway is not the simplest of tasks even for the competent and more experienced DIYers. Therefore, if you choose to carry out the project on your own, you should also get ready for a longer completion time than it would have been if you hired a professional which is usually around 48 hours. If you have all the tools and materials in place before commencement, then it’s possible to complete the project over the weekend. However, there are many risks involved such as the possibility of misjudging the proper quantity of concrete mixture (for a concrete driveway) and more. So, how much does driveway installer charge?
Well, just like other home improvement projects, the amount charged by driveway installers depend on a number of factors like the type of driveway (concrete, asphalt, tarmac etc), size of the area, the experience of the professional, the property’s location and lots more. However, in general, the average cost of a driveway ranges between £35 to £85 per square metre. For labour costs, you can expect to pay between £200 to £450 per day based on the work’s complexity.
The table shows the sorts of task that Driveway Installers typically do as well as the regular cost series of these projects. Some jobs take longer to finish than others so costs do be very different by project.
View our Driveway Installer cost guide View our Driveway Installer adviceDriveway Installer job | Driveway Installer cost in 2025 |
---|---|
Tarmac paving and driveways in Longfield | £1,125-£1,725 |
Block paving in Longfield | £3,000-£4,600 |
Slab Paving and Driveway in Longfield | £1,875-£2,875 |
Driveway cleaning in Longfield | £143-£348 |
Gravel paving and driveways in Longfield | £3,000-£4,600 |
Pattern imprinted driveways in Longfield | £3,750-£5,750 |
Resin bound driveway in Longfield | £2,625-£4,025 |
Driveway repair in Longfield | £1,520-£2,280 |
Indian Stone Paving in Longfield | £2,000-£3,800 |
Pave Driveway in Longfield | £1,800-£3,100 |
Are you having weed problems on your carefully picked out block pavings? After spending huge bucks to install the block pavings, the last thing any homeowner would want to discover is weed taking over the prized asset. Fortunately, this is a problem that can be effectively handled in a few simple steps provided in this article.
Basically, sealing of block paving is all about prevention of weed growth in the area by total weed removal, putting of sand between the block paving joints and sealing with a good quality sealant. This is a task that’s best left for a reliable professional to guarantee the best results especially if you lack proper training and experience. This guide will give a good insight into the process.
Here are the equipment you’ll need to get started: pressure washer, weed killer, bin bag, broom, small brush, protective gear, sealing roller, spueegee, jointing sand and sealer and DIY sprayer.
lRemove The Weed
• Put on a protective clothing and gloves
• Get a weed disposal bag to clean while you go.
• Apply the selected weed killer on both areas where weeds are present and the absent ones to prevent any growing.
lPressure Washing
• Angle your pressure washer between the gaps. This is done to remove all weeds and debris that are still lying around as well as removing all possible chemical residues to create a thorough clean between the paving slab.
• Leave the washed area to dry.
l Sand The Joints
• Check the weather forecast to ensure there’s about 24 to 48 hours of dryness as its important for both sand and sealant to do a perfect job.
• Put sand between the gaps and push it down with your small brush until its levelled.
lSeal The Gaps
• The sealing process should be done immediately and sanding.
• Clean up the patio
• Perform a test using a small area
• Apply the sealant
• Apply the second of sealant
• Leave to dry for about 2 to 3 hours.
If you’re considering giving your home a quick facelift, laying of paving slabs for your outdoor living spaces might be a great way to start. It can be installed in some many parts of your home’s exterior from the pathways to driveways and from the yards to the patios. With proper training and experience, laying paving slabs is a very easy and quick process. However, the issue here is, how do you calculate the number of paving slabs you need? In this step by step guide, you’ll find all the information needed to help you get started. Once you’re able to get the accurate number of paving slabs, do ensure to include extras that’ll cover up for possible errors or damages.
Just like any other measurement task, it’ll be a lot easier when you know how as well as when you have the right tools to use for the job. To get started, you’ll need a tape measure, pen or pencil, pegs, string, hammer, paper and calculator.
• Draw a sketch of the area. This sketch will take note of the area’s length and width.
• Using strings and pegs, mark out the area to be paved
• Using a tape measure, take a measurement of the length and width of the space along the string lines and note them on the sketch.
• If the area is a drive make sure that the paved area is wide enough to accommodate the cars intended
• Multiply the length of the space by the width to get the area of the space.
• Once calculated, divide the total area of the space by the area of the single slab. This will give you an accurate number of the paving slabs you’ll require to complete your project.
While resin bound and resin bonded driveways have similar names, it might surprise you to know that they’re very different. Both paving systems use resin and aggregates (stones) to form a fixed surface, but there are plenty more differences than there are similarities.
Resin bound driveways are made from a resin and aggregate mix that is trowelled onto a bitmac or concrete base. It leaves a smooth, flat finish and you won’t find any loose gravel. It’s also a pourous surface, which means that rainwater can pass through into the ground, avoiding pools and flooding.
However, resin bonded driveways involve spreading resin across a base, then scattering aggregate into it. Most of the stones will stick to the resin, but some will stay loose. That means you’ll get the effect of loose gravel without so much to sweep and take care of. Because the stones are scattered onto a complete layer of resin, water can’t pass through it. That means you could end up with water pooling, and it also means that a resin bonded driveway isn’t frost resistant, meaning it could get slippery.
So which is better – a resin bound or resin bonded driveway? The answer depends on a few things. If you have a period property where a smooth, shiny surface might not complement the look of your home, you might want to go for resin bonded. If you need lots of grip, for example if you’re a wheelchair user, resin bonded may also be the way to go – even though resin bound surfaces still offer enough grip for sloped driveways and ramps. But if you want a low-maintenance, weed-free, permeable surface, resin bound driveways are the way to go.
Driveway work is usually done in the warmer half of the year. This is partly to avoid bad weather. If you want to get ahead and avoid waiting for a contractor to be free, you should try getting in touch with a professional in the early spring so a date can be booked for install as soon as practically possible.
As a homeowner, your home is your haven where you can control things and add more value, however that doesn’t give you the license to go around digging up your driveway as you deem fit. Replacing your old driveway with a new one comes with its own unique set of rules which are put in place to ensure that your personal preferences doesn’t pose long term issues such as flooding or poor visibility on any adjoining road. You should however note that it’s not every time you would need a planing permission for your driveway.
Below are the circumstances whereby you’ll need to submit an application before commencing your driveway paving project.
• In the event whereby you are to pave a driveway of over 5 square metres and/or a permeable surface is not available for its drainage. If the later is not available, there’ll be an increase in the flood risk. As a result, there’s the need to take into account permeable paving for your project.
• In the event whereby you’re changing the visibility on your road. These situations include removal of trees, gates or walls and the like. So far your changes negatively affects drivers’ visibility, you’ll need a planning permission.
• In the situations whereby you need to include a drop kerb. You may plan to add in a drop kerb if you’re thinking about expanding your driveway. Therefore, since residents can’t change the roads or pavements at their first fanciful impulse you’ll need to consult your local council before submitting your application.
• In the situation whereby its a listed building. Planning decisions are also greatly affected by the need to protect historic building. So if your building is a listed one, you’d have to submit an application before making changes.
A patio is an outdoor space which can be used for a variety of stuffs which includes fun time with family and friends, reading time or just relaxing as the fresh breeze blows. With all these benefits and more, it’s becomes more obvious that there’s a need to keep your patio in a tip top condition at all times. If otherwise, you may not be able to enjoy your patio to your satisfaction and probably, for as long as you would want. You simply have to provide it with a regular maintenance which involves inspecting and identifying the damages that needs to be repaired before it gets out of hand. Fortunately, the minor repairs can be done by yourself if you’re confident enough. However, for bigger damages it’s advisable to call in a professional for help. In this article, we’ll take you through the patio reparation process.
✓ Prepare the area. This involves removing the problem piece gently and carefully. If there’s a piece you think can still be useful, store it in the re-use pile or you can start a new one. Once you’re done removing the pieces, the next thing to do would be to start removing anything that’s unwanted from the damaged area like debris, unwanted soil etc, and start sand fitting with some fresh sand. This should be levelled out to ensure there’s no bumps.
✓ With the sand down, you can start by putting the pieces back in together. This should be done gently to avoid any further damage. Do this until your patio
✓
Oil stains on your concrete driveway can look obvious and unsightly. However, there are several different ways to remove them.
If you’ve only just spilled the oil, you can use a mixture of absorbent material, like sawdust, and solvent, like acetone or lacquer. Combine these, place them on the stain, cover and leave for about 24 hours. Then sweep up the mixture and rinse the area with water.
If you’ve got a small, older stain, you can use a detergent like baking soda, vinegar, washing up liquid or laundry detergent. Cover the stain with the detergent and leave for about 30 minutes. Then, add hot water and scrub the area and rinse. You might need to repeat this if necessary.
If it’s a larger, more stubborn stain, you might need to use a special degreaser. You can use this similarly to a detergent but make sure you follow the instruction on the bottle carefully.
Answer a few quick questions to help us match you with the right Driveway Installer
Receive no-obligation quotes from 4 Driveway Installers working in Longfield.
Compare prices, customer reviews and services, and hire the right Driveway Installer.
View our open Driveway Installer jobs near you
Join today