Paving & Driveway | Block
Chatteris - PE16
Enquiry from: Richard P
Start Date: Immediate
18m2 block paving at front of house. 11meter long x 1.5m wide, last 1.5m length is approx 2.5m wide and will only be pedestrian.
-->
Over 313 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Driveway Installers near you
Chatteris - PE16
Enquiry from: Richard P
Start Date: Immediate
18m2 block paving at front of house. 11meter long x 1.5m wide, last 1.5m length is approx 2.5m wide and will only be pedestrian.
Chatteris - PE16
Enquiry from: Connie W
Start Date: Immediate
repair or replacement of rotten window timber and sills. grade 2 listed. 1 bay/ sash window. 2 upstairs windows, 2 dormers, 1 skylight. are you the property owner: owner of the property property type:...
Chatteris - PE16
Enquiry from: Janette M
Start Date: Immediate
I would like to convert my front garden into a extra driveway, there are two large shrubs (trees) which will also need removing, along with the grass - & the bushed will need cutting back. I have ...
Chatteris - PE16
Enquiry from: Ed M
Start Date: Immediate
Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Work description: Block paving 20 square feet
Chatteris - PE16
Enquiry from: Matthew G
Start Date: Immediate
0.4m X 3.5 meter roadside narrow path for tarmacing.
Chatteris - PE16
Enquiry from: Knud C
Start Date: Immediate
Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Work description: Cover existing driveway with new material to be decided. ...
Chatteris - PE16
Enquiry from: Derek H
Start Date: Less than one month
120sqm drive way resurfaced. First thoughts resin. Are you the property owner: Owner of the property Property Type: Detached Do you require: Block Paving Location: Front What work is required: Drivew...
Chatteris - PE16
Enquiry from: Daniel B
Start Date: 1 to 3 months
Are you the property owner: Owner of the property Property Type: Detached Time scale: 1-3 months Other Forms: 5 Agreed to recieve quotes for selected products: Yes Please call to appoint
Chatteris - PE16
Enquiry from: Daniel B
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Steps down to garden area from patio and sun lounge
Chatteris - PE16
Enquiry from: Graham F
Start Date: Less than one month
Dig out, supply and lay block paving in order to extend existing block paving, Area approx 7foot x 2 foot Do you require: Block Paving Roughly how much area are you looking to have paved: 0-20 m2 What...
Chatteris - PE16
Enquiry from: Robin A
Start Date: Immediate
Drive way to double gates Are you the property owner: Owner of the property Property Type: Detached Do you require: Asphalt/Tarmac What work do you need to have done: Driveway Roughly how much area a...
Chatteris - PE16
Enquiry from: Keith W
Start Date: Immediate
Are you the property owner: Owner of the property Property Type: Detached Other Forms: None Please call to appoint
Chatteris - PE16
Enquiry from: Keith W
Start Date: Immediate
Customer visited the mydrivewayprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Work description: It’s a patio area. Looking for driveway type bricks...
Chatteris - PE16
Enquiry from: Su H
Start Date: 1 to 3 months
looking for the removal of grassed front garden 7x9 m approx and a few small tree stumps. Need the soil taken away. Then require the area to be gravelled suitable for car parking. Might need the work...
Chatteris - PE16
Enquiry from: Jeremy B
Start Date: 1 to 3 months
41m2 (approx) blocking it patterned contrete + possible drainage driveway Are you the property owner: Owner of the property Location: Front Property Type: Detached Do you require: Block Paving Roughly...
Chatteris - PE16
Enquiry from: Joshua W
Start Date: 1 to 3 months
I need a driveway built at the front of my property. I'm not 100% on requirements at the moment and I'd like to discuss ideas and options in terms of edging/borders etc but I will definitely need a do...
Chatteris - PE16
Enquiry from: Alan G
Start Date: Immediate
Lay patio and path to rest gate Are you the property owner: Owner of the property Property Type: Semi detached Location: Rear What work is required: Patio What level of service do you require: Supply ...
Chatteris - PE16
Enquiry from: Liz S
Start Date: Immediate
Remove old brick patio in courtyard and replace with paving slabs Are you the property owner: Owner of the property Property Type: Semi detached Do you require: Block Paving Location: Rear What level ...
Are you planning to install a driveway on your home or property? If yes, then you’ll most likely be interested to know exactly how much it’s going to cost. Well, to get started you’ll have to decide whether you’ll be doing this yourself or perhaps you’d be hiring a specialist. The project could be much more effective if you decide to tackle it on your own as you’re only going to be worried about the paying for the materials without any labour costs. However, installing a driveway is not the simplest of tasks even for the competent and more experienced DIYers. Therefore, if you choose to carry out the project on your own, you should also get ready for a longer completion time than it would have been if you hired a professional which is usually around 48 hours. If you have all the tools and materials in place before commencement, then it’s possible to complete the project over the weekend. However, there are many risks involved such as the possibility of misjudging the proper quantity of concrete mixture (for a concrete driveway) and more. So, how much does driveway installer charge?
Well, just like other home improvement projects, the amount charged by driveway installers depend on a number of factors like the type of driveway (concrete, asphalt, tarmac etc), size of the area, the experience of the professional, the property’s location and lots more. However, in general, the average cost of a driveway ranges between £35 to £85 per square metre. For labour costs, you can expect to pay between £200 to £450 per day based on the work’s complexity.
The table shows the sorts of task that Driveway Installers typically do as well as the regular cost series of these projects. Some jobs take longer to finish than others so costs do be very different by project.
View our Driveway Installer cost guide View our Driveway Installer adviceDriveway Installer job | Driveway Installer cost in 2024 |
---|---|
Tarmac paving and driveways in Chatteris | £563-£50,862 |
Block paving in Chatteris | £1,501-£52,300 |
Slab Paving and Driveway in Chatteris | £938-£51,437 |
Driveway cleaning in Chatteris | £176-£33,765 |
Gravel paving and driveways in Chatteris | £1,501-£52,300 |
Pattern imprinted driveways in Chatteris | £1,876-£52,875 |
Resin bound driveway in Chatteris | £1,313-£52,012 |
Driveway repair in Chatteris | £761-£51,140 |
Indian Stone Paving in Chatteris | £1,001-£51,900 |
Pave Driveway in Chatteris | £901-£51,550 |
Resin bound driveways are known to last a long time without the need for repairs, but sometimes accidents happen. You also need to make sure you regularly maintain your driveway by sweeping and power washing it to prevent damage. But if it does get damaged, how do you repair your resin bound driveway?
If you notice a crack in your resin bound driveway, it’s important to repair it as soon as possible. If you leave it to erode, you could end up with a difficult repair that will cost much more money.
To repair a crack, you’ll need to carefully chisel it open slightly so you can apply a primer then fill in the crack with a matching-coloured resin and aggregate mix. While there are variations in colour and size with all stone mixes, usually it’s easy to find a batch that matches almost perfectly. And once the crack has been repaired for a while, it will blend in seamlessly with the rest of your driveway.
To prevent cracking in your resin bound driveway, it’s best to tackle the issue at initial installation. Speak to your installer about whether it’s possible to add fibreglass mesh to the base. You should also ask your installer to add expansion trims as these will significantly reduce the risks of cracks.
So the best way to repair resin bound driveways is to prise open the crack and fill it in. It might seem simple, but getting the right colour match is something that should be left to the professionals, so get a few quotes to ensure you get the best finish.
Are you having weed problems on your carefully picked out block pavings? After spending huge bucks to install the block pavings, the last thing any homeowner would want to discover is weed taking over the prized asset. Fortunately, this is a problem that can be effectively handled in a few simple steps provided in this article.
Basically, sealing of block paving is all about prevention of weed growth in the area by total weed removal, putting of sand between the block paving joints and sealing with a good quality sealant. This is a task that’s best left for a reliable professional to guarantee the best results especially if you lack proper training and experience. This guide will give a good insight into the process.
Here are the equipment you’ll need to get started: pressure washer, weed killer, bin bag, broom, small brush, protective gear, sealing roller, spueegee, jointing sand and sealer and DIY sprayer.
lRemove The Weed
• Put on a protective clothing and gloves
• Get a weed disposal bag to clean while you go.
• Apply the selected weed killer on both areas where weeds are present and the absent ones to prevent any growing.
lPressure Washing
• Angle your pressure washer between the gaps. This is done to remove all weeds and debris that are still lying around as well as removing all possible chemical residues to create a thorough clean between the paving slab.
• Leave the washed area to dry.
l Sand The Joints
• Check the weather forecast to ensure there’s about 24 to 48 hours of dryness as its important for both sand and sealant to do a perfect job.
• Put sand between the gaps and push it down with your small brush until its levelled.
lSeal The Gaps
• The sealing process should be done immediately and sanding.
• Clean up the patio
• Perform a test using a small area
• Apply the sealant
• Apply the second of sealant
• Leave to dry for about 2 to 3 hours.
As a homeowner, your home is your haven where you can control things and add more value, however that doesn’t give you the license to go around digging up your driveway as you deem fit. Replacing your old driveway with a new one comes with its own unique set of rules which are put in place to ensure that your personal preferences doesn’t pose long term issues such as flooding or poor visibility on any adjoining road. You should however note that it’s not every time you would need a planing permission for your driveway.
Below are the circumstances whereby you’ll need to submit an application before commencing your driveway paving project.
• In the event whereby you are to pave a driveway of over 5 square metres and/or a permeable surface is not available for its drainage. If the later is not available, there’ll be an increase in the flood risk. As a result, there’s the need to take into account permeable paving for your project.
• In the event whereby you’re changing the visibility on your road. These situations include removal of trees, gates or walls and the like. So far your changes negatively affects drivers’ visibility, you’ll need a planning permission.
• In the situations whereby you need to include a drop kerb. You may plan to add in a drop kerb if you’re thinking about expanding your driveway. Therefore, since residents can’t change the roads or pavements at their first fanciful impulse you’ll need to consult your local council before submitting your application.
• In the situation whereby its a listed building. Planning decisions are also greatly affected by the need to protect historic building. So if your building is a listed one, you’d have to submit an application before making changes.
Patios use durable and hard wearing materials which will be able to withstand extreme weather. It’s important to consider the drainage of your patio, as heavy rain will need to drain away to an area that can absorb the water. A professional will be able to design and lay a patio to do this.
Paved driveways are popular amongst residence and also homeowner in the UK and not surprisingly so. Be it concrete, gravel, brick, rock or asphalt, there are a great deal of benefits you stand to obtain. If you're aiming to have your driveway paved, then you go to the ideal location! In this article, we're going to think about some of the top benefits of having your driveway paved. Allow's take a look!
Right here are a few of the leading advantages of mounting a paved driveway.
It’s always a good idea to be sure of how you’re going to keep the annoying gravel spillage off your driveway way before its installation, however, if you’ve already done so, it’s better late than never. We all know how great a gravel driveway can look when the gravels manage to stay in place. When gravel is used on a driveway it provides a great transition from the normal hardness of a driveway to the organic softness of the lawn which doesn’t retain water or gush runoff during irrigation or rainfall. Unfortunately, the sad thing here is gravel don’t just like to stay put. Before long, if ignored, you’d realize your hard surfaces will almost be covered with gravel coming in from the side. So what’s the solution to this rather annoying situation?
Here, we’ll show you just how you can keep your gravel in place in your driveway. Let’s take a look!
The solution here is simple - simply make use of Pour On. With Pour On, you won’t have to think about of clearing out your gravel features to put an end to the issue of loose rocks spilling on your hard surfaces. With Pour On, you’ll be able to hold your gravel in place for several years to come. And even more importantly, it’s able to achieve this objective while also protecting the integrity the existing permeability of your driveway. What’s more? It also goes a long way to retain the natural look provided by your gravel driveway which makes it the perfect solution to the annoying gravel spillage issues.
If you’re considering giving your home a quick facelift, laying of paving slabs for your outdoor living spaces might be a great way to start. It can be installed in some many parts of your home’s exterior from the pathways to driveways and from the yards to the patios. With proper training and experience, laying paving slabs is a very easy and quick process. However, the issue here is, how do you calculate the number of paving slabs you need? In this step by step guide, you’ll find all the information needed to help you get started. Once you’re able to get the accurate number of paving slabs, do ensure to include extras that’ll cover up for possible errors or damages.
Just like any other measurement task, it’ll be a lot easier when you know how as well as when you have the right tools to use for the job. To get started, you’ll need a tape measure, pen or pencil, pegs, string, hammer, paper and calculator.
• Draw a sketch of the area. This sketch will take note of the area’s length and width.
• Using strings and pegs, mark out the area to be paved
• Using a tape measure, take a measurement of the length and width of the space along the string lines and note them on the sketch.
• If the area is a drive make sure that the paved area is wide enough to accommodate the cars intended
• Multiply the length of the space by the width to get the area of the space.
• Once calculated, divide the total area of the space by the area of the single slab. This will give you an accurate number of the paving slabs you’ll require to complete your project.
While resin bound and resin bonded driveways have similar names, it might surprise you to know that they’re very different. Both paving systems use resin and aggregates (stones) to form a fixed surface, but there are plenty more differences than there are similarities.
Resin bound driveways are made from a resin and aggregate mix that is trowelled onto a bitmac or concrete base. It leaves a smooth, flat finish and you won’t find any loose gravel. It’s also a pourous surface, which means that rainwater can pass through into the ground, avoiding pools and flooding.
However, resin bonded driveways involve spreading resin across a base, then scattering aggregate into it. Most of the stones will stick to the resin, but some will stay loose. That means you’ll get the effect of loose gravel without so much to sweep and take care of. Because the stones are scattered onto a complete layer of resin, water can’t pass through it. That means you could end up with water pooling, and it also means that a resin bonded driveway isn’t frost resistant, meaning it could get slippery.
So which is better – a resin bound or resin bonded driveway? The answer depends on a few things. If you have a period property where a smooth, shiny surface might not complement the look of your home, you might want to go for resin bonded. If you need lots of grip, for example if you’re a wheelchair user, resin bonded may also be the way to go – even though resin bound surfaces still offer enough grip for sloped driveways and ramps. But if you want a low-maintenance, weed-free, permeable surface, resin bound driveways are the way to go.
Answer a few quick questions to help us match you with the right Driveway Installer
Receive no-obligation quotes from 4 Driveway Installers working in Chatteris.
Compare prices, customer reviews and services, and hire the right Driveway Installer.
View our open Driveway Installer jobs near you
Join today