Find a Landscaper you can trust in Kirkwall.

Choose from 3 Landscapers, all rated by people like you.

Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

View Shortlist

Nomow

1 review(s)
Offers services in KIRKWALL
Nomow supply & install artificial grass & turf throughout the UK. Artificial grass is the perfect solution for architects,...

Recent Landscaper Enquiries

27 May

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Brian C

Start Date: Immediate

Lawn Care Lead Lawn Care Lead Lawn Care Lead Lawn Care Lead Lawn Care Lead

regular grass cutting, front and back. maybe some drive cleaning. are you the property owner: owner property type: detached do you have a: medium size garden garden type: back garden, front garden, s...

Post a similar request >

22 Jul

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Susan C

Start Date: Immediate

I am disabled and my husband has recently passed away. I need someone to cut the grass in my garden, front, and back. There are no plants to cut around, just grass.

Post a similar request >

07 Jul

Garden | Landscaping

Kirkwall - KW15

Enquiry from: Robert S

Start Date: Immediate

Small greenhouse with toughened glass also a price for installation, thanks Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: 31+ m2 Garden Ty...

Post a similar request >

15 May

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Ella N

Start Date: Immediate

grass cutting

Post a similar request >

19 Aug

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Joanna W

Start Date: Immediate

Need front and back garden grass to be cut.

Post a similar request >

28 Mar

Garden | Landscaping

Kirkwall - KW15

Enquiry from: Viktoria T

Start Date: Immediate

Hi we are looking for a greenhouse about 8 foot preferably with base.

Post a similar request >

18 Jan

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Cassandra J

Start Date: Immediate

I'm actually looking for someone to exhume a pet of mine on the quiet. I've discussed a cremation with a crematorium down in Aberdeen but I don't have the heart or stomach to exhume her myself, as I'm...

Post a similar request >

16 Jun

Garden | Maintenance & Upkeep

Kirkwall - KW15

Enquiry from: Bob D

Start Date: Immediate

Cut front and back grass about 100 sq metres, not well enough to do it myself at present

Post a similar request >

14 Apr

Fencing | Wooden

Orkney - KW17

Enquiry from: Dan T

Start Date: Immediate

we are moving to invergarry (ph35 4ht)and need the garden dog proof, min 4ft fencing with two sets of five bar double gates. would just like a chat and options are you the property owner: owner of th...

Post a similar request >

26 Sep

Fencing | Wooden

Orkney - KW17

Enquiry from: Derby S

Start Date: Immediate

two short lengths of fencing to keep dogs in. two gates will be required. material? open to suggestions. are you the property owner: owner of the property property type: detached how many fence pan...

Post a similar request >

03 Jun

Garden | Maintenance & Upkeep

Orkney - KW17

Enquiry from: David H

Start Date: Immediate

looking for 2 days work on garden. weeding, strimming and general tidy up. are you the property owner: owner property type: detached garden type: back garden, front garden, side garden current state o...

Post a similar request >

17 May

Garden | Maintenance & Upkeep

Orkney - KW17

Enquiry from: May A

Start Date: Immediate

grass cut front and back. usually have some sheep in garden at lambing but not this year, so grass has become overgrown. not a big area less than an acre or less than half acre. are you the propert...

Post a similar request >

25 Oct

Garden | Maintenance & Upkeep

Orkney - KW17

Enquiry from: Mark M

Start Date: Immediate

cut well over grown grass and remove it are you the property owner: owner property type: detached do you have a: medium size garden garden type: back garden work required: lawn/turfing current state o...

Post a similar request >

21 Aug

Garden | Maintenance & Upkeep

Orkney - KW17

Enquiry from: Donald F

Start Date: Immediate

10 months of weeds to get rid of.

Post a similar request >

03 Mar

Garden | Maintenance & Upkeep

Stromness - KW16

Enquiry from: Mirran H

Start Date: Immediate

Do you sell crab apple tree

Post a similar request >

04 Feb

Garden | Maintenance & Upkeep

Orkney - KW17

Enquiry from: Julie A

Start Date: Immediate

Lawn cutting, weed killing, gutter clearing, general tidying up for spring

Post a similar request >

09 Mar

Garden | Landscaping

Stromness - KW16

Enquiry from: Helen T

Start Date: Immediate

8 x10 Greenhouse

Post a similar request >

17 Jan

Garden | Sheds

Stromness - KW16

Enquiry from: Sue G

Start Date: Immediate

Potting shed around 8ft x 10ft

Post a similar request >

22 Nov

Garden | Sheds

Orkney - KW17

Enquiry from: Alan S

Start Date: Immediate

Want a good quality 6x8 shed and matching 6x8 potting shed, preferably single sloping roof without apex

Post a similar request >

08 Nov

Garden | Sheds

Orkney - KW17

Enquiry from: Andrew W

Start Date: Immediate

Looking for a workshop size building, single door, 1-2 windows, any size around 12ft x 20ft or 15ft x 18ft

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2025 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Kirkwall is:

£1,478

Landscaper job Landscaper cost in 2025
Wooden fencing in Kirkwall £1,125-£1,725
Landscaping in Kirkwall £2,250-£3,450
Garden maintenance and upkeep in Kirkwall £188-£288
Wooden decking in Kirkwall £1,125-£1,725
Artificial Grass in Kirkwall £3,000-£4,600
Garden shed in Kirkwall £450-£690
Garden lighting in Kirkwall £320-£480
Driveway repair in Kirkwall £1,520-£2,280
Lawn Care in Kirkwall £130-£200

Related Landscaper searches in Kirkwall

Landscaper FAQs

how much does it cost to repair a driveway?

Is your driveway damaged or starting to show some signs of cracks and gaps? If yes, then you’d probably be thinking of repairing it before it gets even worse. Repairing a driveway is largely an unknown process but also a very tedious task as well. So if you’re looking to hire a professional for help, just how much is the repair going to cost? In this article, we’re going to look at the various factors that can determine the cost of a driveway repair.

In the UK, the average price of repairing a driveway is usually within the range of £1,400 to £1,800, where as the normal price of a driveway repair will range between £700 to £2,400. although some small repairs tasks can be as low as £250, while huge driveway repairs can skyrocket to about £4,200.

However, in general, the overall cost of repair a driveway can not be determined as each driveway is unique with their special repair needs. The factors that can influence the price of a driveway repair includes the material used, the perimeter of the driveway as well as the condition of the foundation. The only factor that’s not unique to any one driveway is the materials used, so let’s take a look at the differences in price using the based on the various types of materials available.

✓ Concrete. The average cost of repairing a concrete driveway is usually between £250 to £3,200. Have it in mind at most times the price of fixing an overly damaged driveway can be more than the cost of buying a new one.

✓ Asphalt. The average cost of repairing an asphalt driveway is usually between £750 to £2,800.

✓ Brick. The average cost of repairing a brick driveway is usually between £700 to £1,700.

✓ Cobblestone. The average cost of repairing a cobblestone driveway is usually between £500 to £1,600.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

how to repair a paved driveway?

Generally, a paved driveway is always subjected to regular usage and yours isn’t likely to be an exception, otherwise you won’t be here. Regular usage automatically necessitates regular maintenance of the driveway in order to extend its lifespan, make your property safer and add more value to it. This maintenance will involve a frequent inspection of the paved driveway so as to identify and repair divots, cracks as well as rutting. Paved driveways usually have a lifespan ranging between 15 to 20 years, but this can only be guaranteed when backed by regular maintenance activities. Failure to provide your paved driveway with a regular maintenance will lead to a rapid deterioration within just a couple of years after installation.

The issues commonly faced by paved driveways is usually different based on several factors such as the weather, your location, your property’s sub base as well as some other elements. The ability to identify the problems and solve or repair them on time is key to success while it’s also save you some time and money. In this article we’re going to look at how to go about do-it-yourself tasks that involves minor cracks. More intense damages are advised to be handled only by professionals.

✓ Prepare the area. Clear the debris, weed the plants or vegetation (if any).

✓ Use a strong spray from a garden hose to wash clean the cracks

✓ In the event whereby the crack is deep, simply fill it until it reach about a quarter inch of the surface with sand.

✓ Tamp down the sand to make it more compact.

✓ Apply a patching compound to the surface of the cracked paved driveway.

✓ Leave it for some time to cure.

✓ Once cured, you can then apply your sealant.

how to repair sunken concrete driveway?

How To Repair Sunken Concrete Driveway

If you have concrete driveway that’s cracked, uneven and mostly especially sunken, you’d know how distasteful it can be just viewing it on your property. A sunken concrete driveway is most likely caused by rainwater erosion removing the soil under it or a big root under it which as rotted over time. Another possible cause of the sunken concrete is an improperly prepared base which implies that the soil beneath wasn’t fully compact when the concrete was poured on it. Later on the soil beneath will eventually settle and shift below the concrete driveway which weakens the integrity of the entire driveway, making it more vulnerable to cracks, unevenness and sunken.

Two ways in which you can fix this problem includes either demolishing the whole driveway, re-compact the soil underneath and fill with new concrete or repair the entire driveway using an easy process called slabjacking. In this article, we’re going to look at the slabjacking repair process as it’s significantly less expensive than the demolishing approach and will also cause minimal disruption to your lifestyle.

Also referred to as mudjacking or concrete lifting, slabjacking is simply a process used to float your existing concrete back to its original position. If you are not a competent DIYer or lack confidence to pull this off, we’d recommend reach out to a professional for help. If otherwise, then you can practice the slabjacking process given below.

✓ Drill holes through the slab.

✓ Pump grout mixture through the holes. This mixture will spread out beneath he driveway and raise it up.

✓ Lastly, fill the holes and level the concrete driveway surface.in such a way to hide the signs of the repair made.

This is a process that works to efficiently get your driveway back in a top condition relatively quickly.

How to overseed a lawn?

Overseeding your lawn is an essential part of keeping your lawn looking its best. It’s also known as reseeding, and helps to repair damaged areas that might have been caused by a harsh summer or winter. It’s best to overseed your lawn during the spring or autumn, when the temperature is mild but there’s still a fair amount of rainy days to help the grass seed grow. To prepare your lawn for overseeding, you should do the following things around 1-2 weeks beforehand:

  • Weed the lawn by hand or using a weedkiller (make sure you leave enough time to do this according to the instructions)
  • Remove stones and large twigs
  • Scarify your lawn to remove moss and loosen soil
  • Fertilise the soil with a quick-release fertiliser

Once you’ve taken these steps, you’re ready to start overseeding your lawn.

  1. Mow your lawn to around 25mm in length.
  2. Water the soil so it’s moist but not too damp.
  3. Sprinkle your new grass seed evenly over the lawn, but apply more in patchy or thin areas. Generally gardeners say to use 35g per square metre, but up to 50g on thin areas.

When you’re finished, give your lawn a final water, and do this every day until the new grass is established – particularly if it’s not rained. Just make sure you don’t overwater it. It’s also a good idea not to walk on your lawn for around 2-3 weeks after you’ve overseeded it.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Kirkwall.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Kirkwall?

View our open Landscaper jobs near you

Join today
View Shortlist