Find a Landscaper you can trust in Battersea.

Choose from 429 Landscapers, all rated by people like you.

Over 505 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

View Shortlist
Verified ProOver 50 Reviews

JM Fencing and Landscaping

89 review(s)
Offers services in BATTERSEA
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in BATTERSEA
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro

Aesthetic Gardens & Drives

0 review(s)
Offers services in BATTERSEA
Here at Aesthetic Gardens & Drives we specialize in transforming outdoor spaces into stunning landscapes. With a commitmen...
Verified Pro

Keybur Paving

0 review(s)
Offers services in BATTERSEA
Keybur paving are a trusted, professional company with a great reputation to uphold. We are based in epsom and cover all o...
Verified Pro

Controlled Airflow Services

0 review(s)
Offers services in BATTERSEA
We are a small, family run business with 10 years experience in the industry and specialise in all aspects of air conditio...

Recent Landscaper Enquiries

22 Sep

Garden | Landscaping

London - SW11

Enquiry from: Alex B

Start Date: Immediate

need pointing to certain areas on garden brick walls on two sides. also concrete needed to a collapsed low wall support on back wall. fencing to top of walls. old softwood deck removed and replace wit...

Post a similar request >

17 Sep

Garden | Landscaping

London - SW11

Enquiry from: Alex B

Start Date: Immediate

need pointing to certain areas on garden brick walls on two sides. also concrete needed to a collapsed low wall support on back wall. fencing to top of walls. old softwood deck removed and replace wit...

Post a similar request >

17 Sep

Garden | Decking

London - SW11

Enquiry from: Alex B

Start Date: Immediate

Lawn Care Lead Lawn Care Lead Lawn Care Lead Lawn Care Lead

customer in london areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via sms and email at 17/09/2024 09:42.please call to arrange a...

Post a similar request >

17 Sep

Fencing | Wooden

London - SW11

Enquiry from: Alex B

Start Date: Immediate

mr requested quotes for fencing from a landscaper around london. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is what t...

Post a similar request >

05 Jun

Garden | Maintenance & Upkeep

London - SW16

Enquiry from: Liliana R

Start Date: Immediate

low maintenance every 3 weeks, 2 hours maximum, mow lawn, sweep front and back, spray weeds, 1 bush to prune. no rubbish to remove, have council garden collection. do you have a: extra large garden p...

Post a similar request >

26 Feb

Driveway Repair

London - SW4

Enquiry from: Jane B

Start Date: Immediate

Quote on how to improve the drainage on our drive and stop water and mud pooling

Post a similar request >

08 Jul

Garden | Maintenance & Upkeep

London - SW16

Enquiry from: Sarah S

Start Date: Immediate

Over grown conifers, reduce back to 10 foot

Post a similar request >

07 Jul

Driveway Repair

London - SW4

Enquiry from: William R

Start Date: Immediate

Coblestone driveway re-pointing and moving and re-laying of some coblestones

Post a similar request >

17 May

Garden | Maintenance & Upkeep

London - SW4

Enquiry from: Jon S

Start Date: Immediate

i need garden maintenance (lawn mowing, weeding, edging) done for my 40 square meter lawn are you the property owner: owner property type: terrace do you have a: medium size garden garden type: back g...

Post a similar request >

10 May

Garden | Landscaping

London - SW16

Enquiry from: Michelle H

Start Date: Immediate

Bamboo removal in area of about 18ins by 10 feet

Post a similar request >

19 Jan

Garden | Maintenance & Upkeep

London - SW12

Enquiry from: Suzanne G

Start Date: Immediate

General tidying up. I need an organic gardener with experience in horticulture..

Post a similar request >

22 Nov

Driveway Repair

London - SW8

Enquiry from: Simon M

Start Date: 1 to 3 months

repair of sandstone flag front driveway (~5x~8m?) and surrounds: scope of work tbd, but could include: pickup and relay as 'crazy paving', including vegetation inhibitor layer, repair of small wall an...

Post a similar request >

19 Nov

Driveway Repair

London - SW8

Enquiry from: Simon M

Start Date: 1 to 3 months

repair of sandstone flag front driveway (~5x~8m?) and surrounds: scope of work tbd, but could include: pickup and relay as 'crazy paving', including vegetation inhibitor layer, repair of small wall an...

Post a similar request >

10 Nov

Driveway Repair

London - SW8

Enquiry from: Simon M

Start Date: 1 to 3 months

repair of sandstone flag front driveway (~5x~8m?) and surrounds: scope of work tbd, but could include: pickup and relay as 'crazy paving', including vegetation inhibitor layer, repair of small wall an...

Post a similar request >

18 Aug

Garden | Maintenance & Upkeep

London - SW16

Enquiry from: Evelyn H

Start Date: Immediate

a weekly gardener for general maintenance, trimming, weeding, clearing leaves, etc and clearing away garden waste. perhaps 2 hours a week but to be discussed with applicant

Post a similar request >

15 Aug

Garden | Maintenance & Upkeep

London - SW1E

Enquiry from: Victor M

Start Date: Immediate

Planting and maintenance.

Post a similar request >

08 Aug

Driveway Repair

London - SW16

Enquiry from: Chet P

Start Date: Immediate

front gates, brickwork, and walls built. for 10, 11, leigham vale streatham. london are you the property owner: owner of the property what level of service do you require: repair to cracks property ty...

Post a similar request >

30 Jul

Garden | Maintenance & Upkeep

London - SW16

Enquiry from: Paul G

Start Date: Immediate

hedge has been cut back to stumps, needs full removal out of ground approx. 5m long are you the property owner: owner property type: semi detached do you have a: small garden garden type: front garden...

Post a similar request >

30 Jul

Fencing | Wooden

London - SW16

Enquiry from: Paul G

Start Date: Immediate

customer has a fencing project they are looking to have done, specially they want quotes for fencing. they are unsure of options so would like to discuss with a landscaper.confirmed interest via sms a...

Post a similar request >

27 Jul

Garden | Maintenance & Upkeep

London - SW1E

Enquiry from: Victor M

Start Date: Immediate

Planting and maintenance.

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2025 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Battersea is:

£1,701

Landscaper job Landscaper cost in 2025
Wooden fencing in Battersea £1,125-£1,725
Landscaping in Battersea £1,375-£7,725
Garden maintenance and upkeep in Battersea £188-£288
Wooden decking in Battersea £663-£3,363
Artificial Grass in Battersea £3,000-£4,600
Garden shed in Battersea £300-£545
Garden lighting in Battersea £320-£480
Driveway repair in Battersea £1,520-£2,280
Lawn Care in Battersea £130-£200

Related Landscaper searches in Battersea

Landscaper FAQs

can you repair resin driveways?

Being a strong and durable product requiring little maintenance and expected to last over 2 decades, it’s little wonder resin is now a popular material amongst homeowners in the UK to build their driveways. However, there’s always the issue of the driveway fading, cracking or even becoming worn and tired. So is it possible to repair resin driveways? The answer is yes, a resin driveway can be repaired, however the best approach to use largely depends on the issue being faced. As a confident DIYer it’ll be very easy to do, but if you lack the confidence then calling in a professional for help would be a better option. So let’s take a look at how you can repair your resin driveways.

For cracks, the best reparation approach would be to chisel it out. Once done, then you can proceed to breaking the stones to form a rough edge. It’s important to make sure that the matrix of the stone remains unaffected. Make a new mixture of resin bound stone and pack it in tightly to the gap. While doing this, we’ll recommend making use of a plastic trowel to avoid burnishing. This fresh mixture will then create a smooth and perfect surface by interlocking with the edges. You can follow similar procedure for patches but these are larger holes or damages than cracks and as the name suggests are mostly likely to remain noticeable but will prevent further crumbling of your resin driveway.

For homeowners, who aren’t so keen about the patch repairs, you can opt for an overlay especially in the event whereby the majority of the surface has failed. Although many usually shy away from this approach because of the perceived high expenses, but the fact is that the approach is actually cost effective as you won’t have the need to spend more money in the long run.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
What do I need to do to maintain my fence?

Properly erected fences shouldn’t require a great deal of maintenance. Any rotting boards can usually be replaced without replacing the whole panel. Timber fencing should be stained every 2-3 years. General maintenance is something you can carry out yourself, however, larger works may need a qualified professional to come in.

Will my patio need a lot of maintenance?

Patios do not require lots of maintenance. They will only need occasional cleaning to make sure that the material keeps its original appearance. It's always best to clean your patio with a pressure washer and occasionally tap each slab or brick just to check the sand underneath hasn't washed away.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
how to repair a paved driveway?

Generally, a paved driveway is always subjected to regular usage and yours isn’t likely to be an exception, otherwise you won’t be here. Regular usage automatically necessitates regular maintenance of the driveway in order to extend its lifespan, make your property safer and add more value to it. This maintenance will involve a frequent inspection of the paved driveway so as to identify and repair divots, cracks as well as rutting. Paved driveways usually have a lifespan ranging between 15 to 20 years, but this can only be guaranteed when backed by regular maintenance activities. Failure to provide your paved driveway with a regular maintenance will lead to a rapid deterioration within just a couple of years after installation.

The issues commonly faced by paved driveways is usually different based on several factors such as the weather, your location, your property’s sub base as well as some other elements. The ability to identify the problems and solve or repair them on time is key to success while it’s also save you some time and money. In this article we’re going to look at how to go about do-it-yourself tasks that involves minor cracks. More intense damages are advised to be handled only by professionals.

✓ Prepare the area. Clear the debris, weed the plants or vegetation (if any).

✓ Use a strong spray from a garden hose to wash clean the cracks

✓ In the event whereby the crack is deep, simply fill it until it reach about a quarter inch of the surface with sand.

✓ Tamp down the sand to make it more compact.

✓ Apply a patching compound to the surface of the cracked paved driveway.

✓ Leave it for some time to cure.

✓ Once cured, you can then apply your sealant.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Battersea.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Battersea?

View our open Landscaper jobs near you

Join today
View Shortlist