Carpentry
Salisbury - SP4
Enquiry from: Sid T
Start Date: Immediate
replace 8 white 6 panel doors with 8 holdenby oak doors (howdens) i have the doors, new hinges 24, 2 bathroom sash locks 3", 6 mortice latches 3"
-->
Over 258 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Salisbury - SP4
Enquiry from: Sid T
Start Date: Immediate
replace 8 white 6 panel doors with 8 holdenby oak doors (howdens) i have the doors, new hinges 24, 2 bathroom sash locks 3", 6 mortice latches 3"
Salisbury - SP4
Enquiry from: Abhishek J
Start Date: Immediate
Bespoke fitted wardrobes and storage solutions
Salisbury - SP3
Enquiry from: Alison H
Start Date: 1 to 3 months
two double wardrobes side by side (his and hers) with hanging rails and shelves to each side. are you the property owner: owner of the property property type: detached what type of job are you lookin...
Salisbury - SP1
Enquiry from: Mike P
Start Date: Immediate
Hello I am looking for an initial quote for the removal of 8 existing internal doors and the supply and hanging of 8 new ones. We are in Salisbury and the property is a bungalow so all doors on the...
Salisbury - SP4
Enquiry from: Andrew F
Start Date: Less than one month
interior door to be hung with lock and latch to be installed. is it possible for someone to visit and measure up and quite prior to me ordering the door please? thank you andy are you the property ow...
Salisbury - SP5
Enquiry from: Francesca P
Start Date: Immediate
Hello We are in urgent need of someone to build 3 internal door frames within a workshop - separating the workshop from an office space. We then need 2 double glass doors and 2 x single glass doors ...
Salisbury - SP5
Enquiry from: Van Z
Start Date: Immediate
fit a ceiling extractor fan. large, may need a recessed ceiling light moved, has a three pin plug, but may be better hard wired. boxing will be needed are you the property owner: owner of the propert...
Salisbury - SP5
Enquiry from: Jennifer U
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: replace wooden decking with paving. install a raised bed.
Salisbury - SP2
Enquiry from: Louise M
Start Date: Immediate
customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...
Salisbury - SP5
Enquiry from: Peter H
Start Date: Immediate
*homeowner Decking supplied and fitted please call to appoint
Salisbury - SP5
Enquiry from: Chris L
Start Date: Immediate
the construction of a free-standing deck on a lawn, 4m x 4m with boarded sides of 0.6m. to include wood treatment and appropriate 'under deck' weed cover/prevention. thanks are you the property owne...
Salisbury - SP2
Enquiry from: Corne N
Start Date: Immediate
composite decking installed around 60sqm quote split for installation and decking separate are you the property owner: owner of the property property type: detached what level of service do you requir...
Salisbury - SP2
Enquiry from: Joe G
Start Date: Less than one month
install one internal door time scale: less than one month please call to appoint
Salisbury - SP1
Enquiry from: Penelope P
Start Date: Immediate
i have a rectangular garden, patio then lawn and shed on hard standing at the end i need inspiration of design and how to use the space rather than randomly plant things. are you the property owner: ...
Salisbury - SP1
Enquiry from: Steve R
Start Date: 1 to 3 months
want a bike shed 6x2 foot. time scale: 1-3 months please call to appoint
Salisbury - SP4
Enquiry from: Cynthia C
Start Date: Immediate
Shed roof needs replacing
Salisbury - SP2
Enquiry from: Diana B
Start Date: Immediate
Wooded door . Glazed panel . Had to be broken because of faulty lock ... Lock not working Number of Windows: 1 Window Are you the property owner: Owner of the property What level of service do yo...
Salisbury - SP2
Enquiry from: Lisa D
Start Date: Less than one month
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: General ongoing maintenance as well as one off project to remove shed and de...
Salisbury - SP2
Enquiry from: Jo M
Start Date: Immediate
take up loose deck boards 2 3000x125x47mm, secure wooden step to face of decking,remove loose render from top a wall and apply 2 coats of new render.
Salisbury - SP2
Enquiry from: Sheri P
Start Date: Immediate
We have several doors in our property which do not shut properly or the handles do not fit and we need some help to fix them.
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Salisbury | £975-£2,495 |
Carpenters and joiners in Salisbury | £375-£575 |
Plasterboard dry lining in Salisbury | £638-£978 |
Wood flooring in Salisbury | £750-£1,150 |
Wooden decking in Salisbury | £1,125-£1,725 |
Garden shed in Salisbury | £2,475-£4,345 |
Wooden window repair in Salisbury | £320-£480 |
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Salisbury.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today