Find a Carpenter you can trust in Tipton.

Choose from 152 Carpenters, all rated by people like you.

Over 113 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Beautiful Gardens

0 review(s)
Offers services in TIPTON
We are a professional landscape gardening business serving Lichfield, Sutton Coldfield, Rugeley and surrounding villages. ...
Verified Pro

Jds kitchens & berooms

0 review(s)
Offers services in TIPTON
Supplier and installer of kitchens & bedrooms.
Verified Pro

Drg landscaping

0 review(s)
Offers services in TIPTON
We’re based in the West Midlands and have a passion for the job that we do. Seeing a happy customer with their dream garde...
Verified Pro
At ColourFence we manufacture & fit beautiful metal garden fences. Able to withstand winds of up to 130mph, our steel-made...
Verified Pro
Expert Local Carpet Cleaning in Droitwich Simply Spotless Solutions are a professional carpet cleaning company based in D...
Verified Pro
Here at Value Floors, we offer flooring products such as laminate flooring, engineered flooring, wood flooring, flooring i...

Recent Carpenter Enquiries

16 Jun

Garden | Decking

Tipton - DY4

Enquiry from: Lyne G

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a landscaper.confi...

Post a similar request >

08 Jun

Garden | Decking

Tipton - DY4

Enquiry from: Lyne G

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a landscaper.confi...

Post a similar request >

23 May

Garden | Decking

Tipton - DY4

Enquiry from: Lyne G

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the propert...

Post a similar request >

27 Feb

Kitchen | Fitting

Tipton - DY4

Enquiry from: Betty J

Start Date: Immediate

new kitchen top and new sink what is your budget for this project: 0-4k how would you define the size of your kitchen: small/medium any building work needed: no do you need any appliances: no have you...

Post a similar request >

26 Sep

Carpentry

Tipton - DY4

Enquiry from: Simon W

Start Date: Less than one month

new front door to be hung and original locks put in place. time scale: less than one month please call to appoint

Post a similar request >

21 Nov

Garden | Decking

Tipton - DY4

Enquiry from: Sheena A

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Need some decking and grass put in garden

Post a similar request >

17 Nov

Garden | Decking

Tipton - DY4

Enquiry from: Sheena A

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Need some decking and grass put in garden

Post a similar request >

28 May

Garden | Decking

Tipton - DY4

Enquiry from: Stephen B

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: 10x10ft square decking area, wood or composite. 4/5 stepping stones leadin...

Post a similar request >

11 Jul

Carpentry

Tipton - DY4

Enquiry from: Paul G

Start Date: Immediate

Hi I need 2 internal doors put on down stairs I have all the items needed to go with them .

Post a similar request >

17 Mar

Carpentry

Tipton - DY4

Enquiry from: Miss N

Start Date: Immediate

quote for fitted wardrobe Time scale: 1-3 months

Post a similar request >

01 Feb

Garden | Decking

Tipton - DY4

Enquiry from: Ranjith A

Start Date: Immediate

looking for wooden decking in back garden which is 300 sq. feet. its a new built property and garden has only soil. - Estimated Service Date: 04/02/2016 - Estimated Decking Area (sq ft): 300 - Reason ...

Post a similar request >

08 Jul

Kitchen | Fitting

Tipton - DY4

Enquiry from: Inderjit K

Start Date: 3+ months

Home owner Whole suite Kitchen Suite Kitchen Design, Supply & Install Kitchen Fitting Time scale 3-6months Contact to Appoint *

Post a similar request >

15 Feb

Kitchen | Fitting

Tipton - DY4

Enquiry from: Steve B

Start Date: 3+ months

Are you the property owner: Owner of the property What level of service do you require: Install Only Are you considering a design and install option as well: No What is your budget for this project...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Tipton is:

£846

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Tipton £975-£2,495
Carpenters and joiners in Tipton £375-£575
Plasterboard dry lining in Tipton £638-£978
Wood flooring in Tipton £750-£1,150
Wooden decking in Tipton £663-£1,863
Garden shed in Tipton £325-£795
Wooden window repair in Tipton £320-£480

Related Carpenter searches in Tipton

Carpenter FAQs

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Tipton.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Tipton?

View our open Carpenter jobs near you

Join today
View Shortlist