Carpentry
Alcester - B50
Enquiry from: M
Start Date: Immediate
I need to replace sone internal doors as they are old and door furniture is falling out.
-->
Over 155 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Alcester - B50
Enquiry from: M
Start Date: Immediate
I need to replace sone internal doors as they are old and door furniture is falling out.
Warwick - CV35
Enquiry from: Katie C
Start Date: Immediate
Old kitchen removed, modifications to plumbing/electrics/gas, fitting of new kitchen, tiling of small area above worktop.
Warwick - CV35
Enquiry from: Rob S
Start Date: Immediate
Hi there, I live in Wellesbourne and was wondering if you have availability to quote for a small carpentry job. My house has a number of door frames where previous owners have had new doors fitted, ...
Pershore - WR10
Enquiry from: Keith L
Start Date: Immediate
Re felt a 6x4 garden shed
Warwick - CV35
Enquiry from: Claire W
Start Date: Immediate
we need a base for a 6x4 shed on a slight slope in a playground (asphalt). do you do this? thanks
Stratford-upon-Avon - CV37
Enquiry from: Emma M
Start Date: Immediate
Area at the bottom of the garden is stoned and covered in weeds, would like area slabbed, and one end made into a raised circular seating area with wooden pergola over it, potentially a small boarder ...
Pershore - WR10
Enquiry from: Richard F
Start Date: Immediate
We have a garden deck which was installed in 2016. It is composite decking laid onto a wooden frame. One corner of the wooden frame underneath has rotted, and I'd like to know if a repair would be fea...
Worcester - WR5
Enquiry from: Shaun M
Start Date: Immediate
Hi. I need a door fitting to an upstairs attick bedroom. I have an old door and you can cut this to size. It’s an irregular shape door frame as it’s an attick room entrance. Can you help? We�...
Worcester - WR1
Enquiry from: Chris W
Start Date: Immediate
Hi There, I’m looking for a piece of oak minimum length 187cm x 18cm minimum width x 30mm thickness approx. I’m trying to obtain a piece that is light in colour. Do you have anything in stock that...
Warwick - CV35
Enquiry from: Dan S
Start Date: Immediate
Moving internal studd wall 30cm to make one room small and the other room bigger, removing in built wardrobe in one room and creating in built wardrobe in another room.
Evesham - WR11
Enquiry from: Alistair C
Start Date: Immediate
real wood flooring right through from front door to lounge include kitchen and downstair toilet rough estimate is about 30sq meters are you the property owner: owner of the property how many rooms ar...
Stratford-upon-Avon - CV37
Enquiry from: Ron D
Start Date: Immediate
The porch door needs repairing/replacing.
Stratford-upon-Avon - CV37
Enquiry from: Jane W
Start Date: Immediate
hi - i have a series of tasks that need completing refelting small shed roof repairing base of bin store or replacing completely with new removing and replacing c 4 fence panels down the side of th...
Worcester - WR3
Enquiry from: Jenny S
Start Date: Immediate
removal of soil from top of the garden. also need some levelling done due to a shed being fitted in. there is a side alley at the top of the garden which leads down to the road. are you the property o...
Worcester - WR1
Enquiry from: James M
Start Date: Immediate
to replace existing wooden decking with a quality composite decking on roof patio overlooking gheluvelt park. old decking to be removed. are you the property owner: owner of the property property type...
Stratford-upon-Avon - CV37
Enquiry from: Sharryn M
Start Date: Immediate
i am moving to a new build and was wanting a quote on turf and a garden shed to be erected. many thanks are you the property owner: owner of the property do you have a: medium size garden what level ...
Worcester - WR1
Enquiry from: James M
Start Date: Immediate
to replace existing wooden decking with a quality composite decking on roof patio overlooking gheluvelt park. old decking to be removed. are you the property owner: owner of the property property type...
Stratford-upon-Avon - CV37
Enquiry from: Julie M
Start Date: Immediate
current decking is rotten and needs to be replaced. are you the property owner: owner of the property property type: other what level of service do you require: supply and deck please call to appoint
Warwick - CV35
Enquiry from: Paul S
Start Date: Immediate
replace existing decking. approx size 30 sqm. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint
Stratford-upon-Avon - CV37
Enquiry from: Angus O
Start Date: Immediate
roughly 6m x 5m raised deck is showing serious signs of decay. need to find solution to partial replacement (deck, frame and liner) or total rebuild - in a budget! are you the property owner: relative...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Alcester | £975-£2,495 |
Carpenters and joiners in Alcester | £375-£575 |
Plasterboard dry lining in Alcester | £638-£978 |
Wood flooring in Alcester | £750-£1,150 |
Wooden decking in Alcester | £663-£1,863 |
Garden shed in Alcester | £325-£795 |
Wooden window repair in Alcester | £320-£480 |
Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
• Incorporate flexible wood on concrete adhesives.
• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
• Put 10mm spacers against the wall to see to the consistency in expansion gaps.
• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
• Make use of a porta-nailer.
• Position 10mm spacers against the wall - parallel with the installation direction.
• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Click here to learn more about wood flooring.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Alcester.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today