Garden | Sheds
Washington - NE37
Enquiry from: Ellen M
Start Date: Immediate
small new leak in shed roof. the roof was replaced *** Feb and paid for but roofer has disappeared
-->
Over 23 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Washington - NE37
Enquiry from: Ellen M
Start Date: Immediate
small new leak in shed roof. the roof was replaced *** Feb and paid for but roofer has disappeared
Washington - NE38
Enquiry from: Bill P
Start Date: Immediate
We have 4 doors need fitting - 3 to be fitted to new frames and one to an existing frame. The 3 fitted to new frames will need architrave and all 4 will need hinges and handles thanks
Washington - NE37
Enquiry from: Victoria T
Start Date: Immediate
extending a pre existing decking in the back garden. unsure of the measurements as of yet. are you the property owner: owner of the property property type: semi detached what level of service do you r...
Washington - NE37
Enquiry from: Jason H
Start Date: Immediate
ground leveled and a 6x8ft shed based built are you the property owner: owner of the property what level of service are you looking for: supply, install do you have a: large garden please call to app...
Washington - NE37
Enquiry from: Michelle G
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Some decking and the rest possibly flag stones.garden is approx 18ft by 15ft.
Washington - NE37
Enquiry from: Kelly G
Start Date: Immediate
Are you the property owner: Owner Property Type: Terrace Other Forms: None Please call to appoint
Washington - NE37
Enquiry from: Joy B
Start Date: Less than one month
Flooring (not carpets, but the actual floorboards) needs to be replaced and front door needs to be replaced Time scale: Less than one month Please call to appoint
Washington - NE38
Enquiry from: John W
Start Date: Immediate
Remove grass and established bushes from 4.5 x 6.5 mtr garden. Supply and lay liner and aggregate Time scale: Immediate
Washington - NE37
Enquiry from: Michelle W
Start Date: Immediate
2 large mirror and black sliding doors. 1 a full wall. Discuss further on the day .
Washington - NE38
Enquiry from: Claire M
Start Date: Immediate
Customers own description of work to be carried out: Work description: 4ftx10ft of decking in my garden Supplied and fitted Please contact to appoint
Washington - NE38
Enquiry from: William L
Start Date: Immediate
Property owner: Owner, Work description: living room [carpeted] want hardwood floor approx. 5.5m/3.5m
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Washington | £975-£2,495 |
Carpenters and joiners in Washington | £375-£575 |
Plasterboard dry lining in Washington | £638-£978 |
Wood flooring in Washington | £750-£1,150 |
Wooden decking in Washington | £1,125-£1,725 |
Garden shed in Washington | £450-£690 |
Wooden window repair in Washington | £320-£480 |
When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Washington.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today