Find a Carpenter you can trust in West Molesey.

Choose from 395 Carpenters, all rated by people like you.

Over 431 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

JM Fencing and Landscaping

89 review(s)
Offers services in WEST MOLESEY
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in WEST MOLESEY
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro

Aesthetic Gardens & Drives

0 review(s)
Offers services in WEST MOLESEY
Here at Aesthetic Gardens & Drives we specialize in transforming outdoor spaces into stunning landscapes. With a commitmen...
Verified Pro

Keybur Paving

0 review(s)
Offers services in WEST MOLESEY
Keybur paving are a trusted, professional company with a great reputation to uphold. We are based in epsom and cover all o...
Verified Pro
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...

Recent Carpenter Enquiries

02 Oct

Garden | Sheds

East Molesey, West Molesey - KT8

Enquiry from: Scott M

Start Date: Immediate

construction of a childs playhouse/shed are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: install please call to appoint

Post a similar request >

08 Jul

Garden | Decking

East Molesey, West Molesey - KT8

Enquiry from: Sue R

Start Date: Immediate

Are you the property owner: Owner Property Type: Terrace Other Forms: None Please call to appoint

Post a similar request >

14 Sep

Garden | Decking

East Molesey, West Molesey - KT8

Enquiry from: Gary W

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Other, Work description: Ground floor flat has a private pation garden laid to slab, need upgrade... either...

Post a similar request >

20 Jun

Kitchen | Fitting

East Molesey, West Molesey - KT8

Enquiry from: Anne R

Start Date: Immediate

We have bought a new kitchen which will be delivered at the beginning of July. The company they have got to install it have quoted us over half the cosst of the already expensive kitchen. As pensioner...

Post a similar request >

05 Sep

Carpentry

East Molesey, West Molesey - KT8

Enquiry from: Elaine C

Start Date: Immediate

cloakroom extended into cupboard understairs Facia cupboard triangular door resizing and refixing moving along giving easy access to the cupboard ...plumber here and would like consultation Move do...

Post a similar request >

06 Jun

Carpentry

East Molesey, West Molesey - KT8

Enquiry from: Rachel B

Start Date: Immediate

supply and fit wooden fence at side of house Time scale: Immediate Please call to appoint

Post a similar request >

05 Nov

Carpentry

Guildford - GU1

Enquiry from: Alan P

Start Date: Immediate

a new side door to my lean to and lock are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many window...

Post a similar request >

23 Jun

Carpentry

Windsor - SL4

Enquiry from: Amanda C

Start Date: Immediate

Room dividing doors between 2 reception rooms, so ideally glazed/half glazed

Post a similar request >

23 May

Carpentry

Woking - GU21

Enquiry from: Mason D

Start Date: Immediate

hi there, i’m currently seeking work within the carpentry industry. i have a lot of experience with doing windows, doors, general labouring, landscaping and i have my level 2 carpentry but i’m loo...

Post a similar request >

12 May

Carpentry

Windsor - SL4

Enquiry from: Emma F

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Hi, we're looking for some custom baby stair gates to match our current stair case. 2x gates needed

Post a similar request >

01 Feb

Carpentry

Windsor - SL4

Enquiry from: Rick R

Start Date: Immediate

Hi Team, Hope you are well? I am looking to get some quotes for 2 piece of work please: - Fit out of existing larder around a boiler - Simple shelving unit on the wall opposite. Happy to ...

Post a similar request >

15 Dec

Carpentry

Windsor - SL4

Enquiry from: Richard W

Start Date: Immediate

we are the managing agent for this development and require some new external doors to be supplied, fitted and decorated. 3 pairs framed ledged & braced bin store doors, refit original locks. 1 extern*...

Post a similar request >

02 Oct

Carpentry

Woking - GU24

Enquiry from: Kelly C

Start Date: Immediate

Hello, I was looking for a local carpenter to make a free standing bench seat for us. I have photos of the design and measurements if this is something you do / are available to quote? Thanks in advan...

Post a similar request >

22 Aug

Carpentry

Windsor - SL4

Enquiry from: Alison P

Start Date: Immediate

removal of sash windows, repair and painting of frames and windows are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden windo...

Post a similar request >

21 May

Garden | Sheds

Slough - SL1

Enquiry from: Steven T

Start Date: Immediate

We have an attractive historic garden shed with a tiled roof that we'd like to have restored as some of the supporting timbers and other woodwork is rotting.

Post a similar request >

02 May

Garden | Sheds

Guildford - GU1

Enquiry from: Samuel P

Start Date: Immediate

lawned ground preparation for a shed, lawn maintenance

Post a similar request >

13 Apr

Kitchen | Fitting

Woking - GU22

Enquiry from: Waleed S

Start Date: Immediate

I am looking to get my entire kitchen remodelled and fitted.

Post a similar request >

12 Dec

Carpentry

Guildford - GU2

Enquiry from: Stephen G

Start Date: Immediate

fit 4 interior doors, with new hinges. but using handles etc from old doors. i will remove old doors and furniture. the house is an old 1920s semi, with wonky walls etc are you the property owner: own...

Post a similar request >

15 Oct

Carpentry

Guildford - GU2

Enquiry from: Kelly M

Start Date: Immediate

fit hinges, mechanism & handle to new wooden door, and fit to door frame. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: ...

Post a similar request >

12 Oct

Interior work | Stud Walls

Bagshot - GU19

Enquiry from: Evelyn C

Start Date: Immediate

We would like to renovate our utility room and we need stud walls/plasterboard with insulation to avoid heat/moisture. Also, we need to overboard the ceiling.

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in West Molesey is:

£1,073

Carpenter job Carpenter cost in 2025
Kitchen Fitting in West Molesey £1,238-£3,748
Carpenters and joiners in West Molesey £375-£575
Plasterboard dry lining in West Molesey £638-£978
Wood flooring in West Molesey £750-£1,150
Wooden decking in West Molesey £663-£3,363
Garden shed in West Molesey £300-£545
Wooden window repair in West Molesey £320-£480

Related Carpenter searches in West Molesey

Carpenter FAQs

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in West Molesey.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in West Molesey?

View our open Carpenter jobs near you

Join today
View Shortlist