Find a Carpenter you can trust in Thames Ditton.

Choose from 392 Carpenters, all rated by people like you.

Over 342 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in THAMES DITTON
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro

Dimension One Kitchens & Bedrooms

0 review(s)
Offers services in THAMES DITTON
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...
Verified Pro

Controlled Airflow Services

0 review(s)
Offers services in THAMES DITTON
We are a small, family run business with 10 years experience in the industry and specialise in all aspects of air conditio...
Verified Pro

Jm2TilingCo

0 review(s)
Offers services in THAMES DITTON
Here at Jm2TilingCo standards are kept to the absolute highest level. I will always leave a job clean and well done, plus ...
Verified Pro

TruGreen West Sussex

0 review(s)
Offers services in THAMES DITTON
TruGreen West Sussex offers a wide range of lawn care services to help make your lawn the central feature of your garden. ...

Recent Carpenter Enquiries

05 Aug

Kitchen | Fitting

Thames Ditton - KT7

Enquiry from: Kolein N

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 8sq m. Approx , Property type: House, Work description: quality nearly kitchen for a kitchen much bigg...

Post a similar request >

05 Apr

Flooring | Wooden

Thames Ditton - KT7

Enquiry from: Effa R

Start Date: Immediate

Property owner: Owner Work description: Currently carpeted, to remove and lay engineered wood floor - total floor area 53sqm Call To Appoint

Post a similar request >

05 Nov

Carpentry

Guildford - GU1

Enquiry from: Alan P

Start Date: Immediate

a new side door to my lean to and lock are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many window...

Post a similar request >

23 Jun

Carpentry

Windsor - SL4

Enquiry from: Amanda C

Start Date: Immediate

Room dividing doors between 2 reception rooms, so ideally glazed/half glazed

Post a similar request >

23 May

Carpentry

Woking - GU21

Enquiry from: Mason D

Start Date: Immediate

hi there, i’m currently seeking work within the carpentry industry. i have a lot of experience with doing windows, doors, general labouring, landscaping and i have my level 2 carpentry but i’m loo...

Post a similar request >

21 May

Carpentry

Woking - GU23

Enquiry from: Roger N

Start Date: Immediate

you installed our oak front door and frame many moons ago and it's looking shabby now. i tried re osma coating it but it looks rough. can you help?

Post a similar request >

12 May

Carpentry

Windsor - SL4

Enquiry from: Emma F

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Hi, we're looking for some custom baby stair gates to match our current stair case. 2x gates needed

Post a similar request >

01 Feb

Carpentry

Windsor - SL4

Enquiry from: Rick R

Start Date: Immediate

Hi Team, Hope you are well? I am looking to get some quotes for 2 piece of work please: - Fit out of existing larder around a boiler - Simple shelving unit on the wall opposite. Happy to ...

Post a similar request >

09 Jan

Carpentry

Woking - GU23

Enquiry from: Clare M

Start Date: Immediate

We tried to visit you today but gate was closed and your telephone number seems to be wrong. We need a new back door as ours is falling apart.

Post a similar request >

15 Dec

Carpentry

Windsor - SL4

Enquiry from: Richard W

Start Date: Immediate

we are the managing agent for this development and require some new external doors to be supplied, fitted and decorated. 3 pairs framed ledged & braced bin store doors, refit original locks. 1 extern*...

Post a similar request >

02 Oct

Carpentry

Woking - GU24

Enquiry from: Kelly C

Start Date: Immediate

Hello, I was looking for a local carpenter to make a free standing bench seat for us. I have photos of the design and measurements if this is something you do / are available to quote? Thanks in advan...

Post a similar request >

20 Sep

Carpentry

Chertsey - KT16

Enquiry from: Undine S

Start Date: Immediate

We are looking to replace an existing ironwork spiral staircase with something less spiral and more wood. Many thanks

Post a similar request >

29 Aug

Carpentry

Guildford - GU4

Enquiry from: Ali F

Start Date: Immediate

Good morning, As a Surrey based business, I wondered if we could ask for your help in completing an anonymous Diversity, Equity & Inclusion Survey? It takes just 5 minutes, is completely anonymou...

Post a similar request >

22 Aug

Carpentry

Windsor - SL4

Enquiry from: Alison P

Start Date: Immediate

removal of sash windows, repair and painting of frames and windows are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: wooden windo...

Post a similar request >

07 Jun

Garden | Sheds

Chertsey - KT16

Enquiry from: Jeanette A

Start Date: Immediate

garden cleared levelled and cleared in prep for shed base are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: install, remov...

Post a similar request >

30 May

Garden | Sheds

Chertsey - KT16

Enquiry from: Jeanette A

Start Date: Immediate

garden cleared levelled and cleared in prep for shed base are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: install, remov...

Post a similar request >

02 May

Garden | Sheds

Guildford - GU1

Enquiry from: Samuel P

Start Date: Immediate

lawned ground preparation for a shed, lawn maintenance

Post a similar request >

13 Apr

Kitchen | Fitting

Woking - GU22

Enquiry from: Waleed S

Start Date: Immediate

I am looking to get my entire kitchen remodelled and fitted.

Post a similar request >

19 Dec

Carpentry

Chertsey - KT16

Enquiry from: Jodie M

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

replace front door needed and to get rid of old door are you the property owner: relative of owner property type: semi detached what type of job are you looking to have done: other do you require a do...

Post a similar request >

08 Nov

Garden | Sheds

Chertsey - KT16

Enquiry from: David N

Start Date: Immediate

removal of damaged shed and replace with new one

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Thames Ditton is:

£1,073

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Thames Ditton £1,238-£3,748
Carpenters and joiners in Thames Ditton £375-£575
Plasterboard dry lining in Thames Ditton £638-£978
Wood flooring in Thames Ditton £750-£1,150
Wooden decking in Thames Ditton £663-£3,363
Garden shed in Thames Ditton £300-£545
Wooden window repair in Thames Ditton £320-£480

Related Carpenter searches in Thames Ditton

Carpenter FAQs

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Thames Ditton.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Thames Ditton?

View our open Carpenter jobs near you

Join today
View Shortlist