Find a Carpenter you can trust near you.

Choose from 4640 Carpenters, all rated by people like you.

Over 1647 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Enter your location to refine your search

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 ReviewsMember for 3 year(s)
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 50 Reviews

Tree & Garden Designs

63 review(s)
Based in: Gloucestershire, GL7 6DA
I am a family runed business professional and efficient for 30 years !
Verified Pro
Towergate Builders & Developers has been a trusted name in the construction and development industry for over 30 years, de...
Verified Pro

McFarlane Homes

0 review(s)
Based in: Glasgow, G72 7TS
- Scottish Home Improvements Award Finalist “Best Window Installation Company” 2024 - Certass Accredited - Checkatrade A...
Verified Pro

Top Glass Renovations

0 review(s)
Based in: Smethwick, B66 3NJ
Top Glass Renovations is a family run business who have been in the home improvement sector for the last 20 years. We pro...
Verified Pro

AF bathroom and heating

0 review(s)
Based in: Plymouth, PL6 5PU
We are a proud bathroom and heating company. We treat every job as our own and strive for your satisfaction to deliver a...

Find a local Carpenter you can trust...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter is:

£1,408

Carpenter job Carpenter cost in 2024
Kitchen Fitting £940-£3,750
Carpenters and joiners £365-£3,216
Plasterboard dry lining £315-£863
Wood flooring £750-£1,150
Wooden decking £765-£4,718
Garden shed £497-£1,632
Wooden window repair £190-£577

Carpenter service qualifications and accreditations

Carpenters qualifications and also certification's: Having the appropriate training and learning exactly how to do your profession is essential for any trade including Carpenters. View the profile of each Carpenter you are looking at to see what accreditation they hold and also what trade associations they belong to. Some trade associations that Carpenters might possibly be a member of include: HomePro, Federation of Master Builders, Guild of Master Craftsmen. Equally Carpenters might also have the following accreditations: BM TRADA, Chartered Institute of Building, City and Guilds.

Unlike electrical or gas work, carpentry is a different profession where no particular certification is legally required for a carpenter to possess. Generally speaking, the only thing you’ll need so as to practice the trade as well as carry out on site work is to demonstrate your competence as a carpenter. To do this, there’s a number of ways you can consider but one which clearly stands out is to complete a portfolio of work and also earn the NVQ Level 2 Carpentry qualification. 

In order to obtain your NVQ Level 2 certification, there’s a need for you to actually learn the trade. You can do this through apprenticeship, working alongside an established carpenter and gradually learning the trade from them. However, it should be noted that it’ll take a couple of years to climb up the ladder from an apprentice to a fully-fledged carpenter. Therefore, if you want to start your new carpentry career sooner rather than later, you might want to consider enrolling on an accredited carpentry training course.


Insurance for Carpenters: Any individual who works in your house, including Carpenters, really should have valid public liability insurance, which safeguards you the house owner and also the Carpenter should unfortunately anything go wrong while they are doing the work. Planning permission for Carpenters Most of the tasks that a Carpenter will do for you will not require planning permission unless its a listed property. Definitely discuss with the Carpenter if planning permission would be needed for the job you are doing, they can suggest the steps that require to be taken.

Services offered by Carpenter

Generally, carpenters are skilled craftsmen who are trained to work in construction as well as cabinet making industry. When it comes to making things with wood, they’re able to fabricate all sorts of wood constructions; from minor projects like custom kitchens or ornate details on wood trim to major ones like carrying out the entire framework of buildings. With that in mind, let’s take a more in depth look at what carpenters does. 

In general, carpenters carry out a wide array of unique job duties which depends on whether they work in rough carpentry or finished carpentry. What’s more? There are a number of areas in which carpenters can specialize in special types of wood products or engage in specialized carpentry processes.

For rough carpentry, this typically involves carpenters who work on large scale construction projects where they make use of blueprints to determine the amount as well as type of material required for a job. When they work, they may need to build sleds to haul timber via wooded areas and rough terrain where motorized vehicles cannot access. Finished carpentry, on the other hand, involves carpenters who are skilled in making cabinetry, furniture, models as well as instruments. They’re also able to make ornate, detailed as well as fine wood products for a number of different uses. They must be able to work efficiently on a small scale while also being detailed oriented.

There are a variety of tasks you can employ a Carpenter for, as well as some of one of the most typical jobs that Carpenter are asked to do consist of:

Carpenter FAQs

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in your area.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter?

View our open Carpenter jobs near you

Join today

Recent Carpenter Enquiries

19 Nov

Kitchen | Fitting

Saint Peter Port, Herm - GY1

Enquiry from: Sherva R

Start Date: Immediate

Wooden window repair Lead

Repair burn kitchen countertops

Post a similar request >

18 Nov

Kitchen | Fitting

Deal - CT14

Enquiry from: Seersha O

Start Date: Immediate

Written quote to repair kitchen from leak

Post a similar request >

17 Nov

Windows | Wooden | Repair

Fareham - PO16

Enquiry from: Peter J

Start Date: 1 to 3 months

sash windows inspection for rot and repaired as appropriate are you the property owner: owner of the property property type: other what service are you looking for: frame repair how many windows are i...

Post a similar request >

17 Nov

Carpentry

Telford - TF2

Enquiry from: Janet M

Start Date: Immediate

A repair to to kitchen cupboard door under the sink

Post a similar request >

15 Nov

Interior work | Stud Walls

Dungannon - BT71

Enquiry from: Oscae j

Start Date: Immediate

Gypsum wall partition and open door stud

Post a similar request >

12 Nov

Carpentry

Isle of Barra - HS9

Enquiry from: Madeleine C

Start Date: Immediate

Front door an internal doors need attention. Also windows require repair ( unable to open)

Post a similar request >

07 Nov

Carpentry

Carlisle - CA5

Enquiry from: Stephen A

Start Date: Less than one month

i need a new small garden fence either repaired or replacing. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other do yo...

Post a similar request >

06 Nov

Garden | Sheds

North Tawton, Okehampton - EX20

Enquiry from: William H

Start Date: Immediate

Garden shed fitted, wood large door

Post a similar request >

06 Nov

Carpentry

Minehead - TA24

Enquiry from: Daphne M

Start Date: Immediate

Kitchen unit door made to match rest of kitchen.

Post a similar request >

05 Nov

Carpentry

Guildford - GU1

Enquiry from: Alan P

Start Date: Immediate

a new side door to my lean to and lock are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many window...

Post a similar request >

05 Nov

Carpentry

Ayr - KA8

Enquiry from: Margaret S

Start Date: Immediate

Kitchen cabinets fitted to fit oven and microwave

Post a similar request >

05 Nov

Carpentry

Cardiff - CF23

Enquiry from: Neville W

Start Date: Less than one month

to replace a wooden door on side of garage are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many w...

Post a similar request >

04 Nov

Carpentry

Alexandria, Arrochar - G83

Enquiry from: William M

Start Date: Immediate

6 x oak panel doors to be fitted

Post a similar request >

04 Nov

Interior work | Stud Walls

Sunderland - SR3

Enquiry from: Chrystina G

Start Date: Immediate

Studded walls and velux window installed in loft

Post a similar request >

03 Nov

Flooring | Wooden

Wilmslow - SK9

Enquiry from: Paul L

Start Date: Immediate

job is to fit an engineered wooden floor. it is a dining room plus two small hallways. total surface area 20 sq metres. carpet must be removed and disposed of. the property is a ground floor flat with...

Post a similar request >

02 Nov

Carpentry

Pontypridd - CF37

Enquiry from: Kieron D

Start Date: Immediate

wooden conservatory panels require refurbishment

Post a similar request >

31 Oct

Carpentry

Chester - CH4

Enquiry from: Margaret C

Start Date: Immediate

internal bathroom door fitting with handles

Post a similar request >

29 Oct

Flooring | Wooden

Manchester - M19

Enquiry from: Ella H

Start Date: Immediate

flooring replacement after chimney removal

Post a similar request >

29 Oct

Carpentry

Leeds - LS13

Enquiry from: Christine G

Start Date: Immediate

Repair/ replace panels in wooden porch on front door

Post a similar request >

28 Oct

Carpentry

Huddersfield - HD4

Enquiry from: John M

Start Date: Immediate

supply & fit oak veneer internal doors

Post a similar request >

View Shortlist