- Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
- Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
- Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
- Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
Find a Carpenter you can trust in Stoke-sub-hamdon.
Choose from 105 Carpenters, all rated by people like you.
Over 75 reviews & an average rating of 4.3/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you


Champion Home Improvements


Expert Home Improvements


J & D Home Improvements


Platinum Fencing Specialists


Multi trade home solutions
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Stoke-sub-hamdon is:
£943
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Stoke-sub-hamdon | £975-£2,495 |
Carpenters and joiners in Stoke-sub-hamdon | £375-£575 |
Plasterboard dry lining in Stoke-sub-hamdon | £638-£978 |
Wood flooring in Stoke-sub-hamdon | £750-£1,150 |
Wooden decking in Stoke-sub-hamdon | £1,125-£1,725 |
Garden shed in Stoke-sub-hamdon | £475-£1,595 |
Wooden window repair in Stoke-sub-hamdon | £320-£480 |
Carpenter FAQs
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
- Decking joists
- Coach screws
- Coach bolts
- Combi drill
- Socket set
- A saw suitable for your project and the thickness of the timber
- Pencil
- Decking preservative
- Sandpaper or sander
- Measure your deck frame and cut to size if necessary.
- Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
- Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
- Fit the coach screws with either a drill driver or socket and ratchet.
- Repeat the process for the inner joists once you’ve assembled the outer frame.
Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.
• Door & Frame Installation Job and the average Cost in £'s
• uPVC door installation including glazing & architrave costs around £90 per door
• uPVC french & patio door sets including glazing & architrave costs around £120 per pair
• Softwood french & patio door sets including architrave costs around £180 per door
• Hardwood french & patio door sets including architrave would cost around £250 per pair
• Softwood internal door hanging only would be around £40 per door
• Hardwood internal door hanging only would set you back around £48 per door
• Softwood external door hanging only is around £60 per door
• Hardwood external door hanging would cost around £70 per door
• Locks, letterboxes & door furniture timber doors are around £15 per Item
• Glazing £15 per pane
• Brick cut-outs single doors is around £60 per cut-out
• French or patio door brick cut-outs will be around £90 per cut-out
• New lintels will cost around £150 per lintel
Door Repair Costs and Charges
Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.
Average Cost of Door Repair Job
Replacement glazing units for uPVC doors will be around £15 per unit
Replacement glazing units for timber doors is around £20 per unit
Replacement door glass pined & putty will cost£30 per pane
Replacement handles are around £10 each and general repair work will cost you £25 per hour
Building & FENSA certificate charges
FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.
Average Cost of Window Repair Job: One to two doors will cost around £85
Average Cost of Door Fixtures & Fittings Removal Job
Removing internal doors will cost around £10
Removing internal door liners will cost around £15
Removing external timber doors will cost about £10
Removing External timber door frame will be around £20
Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.
Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.
How Much Is Plasterboard?
Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.
A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!
• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.
• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.
• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.
The cost of just the engineered wood flooringis from £18 to £73 per m2.
- If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
- Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
- Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
- Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
- Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Stoke-sub-hamdon.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Stoke-sub-hamdon?
View our open Carpenter jobs near you
Join today