Carpentry
Shepton Mallet - BA4
Enquiry from: Janet B
Start Date: Immediate
I need replacement internal doors upstairs, 4 in total, new handles too. I also need some lvt laid in bathroom, (under floor 6mm waterproof ply I think)
-->
Over 76 reviews & an average rating of 4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Shepton Mallet - BA4
Enquiry from: Janet B
Start Date: Immediate
I need replacement internal doors upstairs, 4 in total, new handles too. I also need some lvt laid in bathroom, (under floor 6mm waterproof ply I think)
Shepton Mallet - BA4
Enquiry from: Martin B
Start Date: 1 to 3 months
stair case and banisters, either oak spindles or glass panels. possibly under stairs cupboard are you the property owner: owner of the property property type: semi detached what type of job are you lo...
Shepton Mallet - BA4
Enquiry from: Joji M
Start Date: Immediate
Hi, I would like to repair or replace a conservatory timber doors which is not able to shut properly in winter times. Please let me know if you could do this. Thanks. J Mathew ***
Shepton Mallet - BA4
Enquiry from: Elizabeth J
Start Date: Immediate
Painting & decorating 2 bedrooms, stairwell, living room. Painting some Outside windows.
Shepton Mallet - BA4
Enquiry from: Marie P
Start Date: Immediate
Replace one skirting board in hallway, 10’ 10’’, (3m29cm), (approx). New flooring will arrive soon, so we’d be grateful if you could do this for us.
Warminster - BA12
Enquiry from: Colin K
Start Date: Immediate
customer in warminster areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 23/07/2024 10:47.please call to arrange ...
Warminster - BA12
Enquiry from: Anna S
Start Date: 1 to 3 months
desk and shelving/cupboards in an alcove area. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: furniture fitting, other do...
Glastonbury - BA6
Enquiry from: Charles B
Start Date: Immediate
We are looking to replace an old staircase that is mid 1950s and has small steps. Just looking for a simple staircase in similar style
Wells - BA5
Enquiry from: Duncan M
Start Date: Immediate
I need some wooden shelves put up in 2 alcoves in my kitchen and dining room for kitchen items and office/pc etc items. Thanks
Frome - BA11
Enquiry from: Ashley B
Start Date: 1 to 3 months
2 staircases that enables us to from the ground floor into the loft. many thanks. are you the property owner: owner of the property property type: detached what type of job are you looking to have don...
Wincanton - BA9
Enquiry from: Robyn D
Start Date: Immediate
Hi there, we are just about to purchase a new property at the above address. It needs a lot of work before we even think about carpentry but im retreiving some quotes for when the time comes. ...
Somerton - TA11
Enquiry from: Ann A
Start Date: Immediate
Shelves fitted in alcove in bathroom
Glastonbury - BA6
Enquiry from: William C
Start Date: 1 to 3 months
replacement outdoor staircase wanted for a first floor door at the rear of a garage. ideally it would be steel/weatherproof. i look forward to hearing from you. happy to provide a video of the stairca...
Gillingham - SP8
Enquiry from: Lisa B
Start Date: Immediate
Moved into new build 29/9 & require side door to garage wall cut out & door fitted. Taylor Wimpey recommended you along with A&G Bricklaying.
Gillingham - SP8
Enquiry from: Emma H
Start Date: Immediate
Hi we are looking for fitted wardrobes in our bedroom which has a pitched ceiling. Happy for it to be just the wooden fitting and we can paint it once we have chosen our colours
Templecombe - BA8
Enquiry from: Laura B
Start Date: Immediate
Hi there, I would like to enquire about having some fitted wardrobes built.
Warminster - BA12
Enquiry from: Karen J
Start Date: Immediate
Clock room unit needs adapting - for rental in Dilton marsh
Wincanton - BA9
Enquiry from: Phil G
Start Date: Immediate
I’ve installed some cupboards, I was looking for assistance in cutting the side trims. I have 4 lengths that need cutting with a table saw, which I unfortunately don’t have. Are you able to assist...
Wincanton - BA9
Enquiry from: Sue H
Start Date: Immediate
We were flooded in May and the insurance company want a quote to repair or replace our front and back doors. Initially we thought repair but to be honest I think the front door needs replacing as it w...
Wincanton - BA9
Enquiry from: Nikki G
Start Date: Immediate
A new off the shelf wooden door fitted to an outside office - or major repair - urgently for security reasons
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Shepton Mallet | £975-£2,495 |
Carpenters and joiners in Shepton Mallet | £375-£575 |
Plasterboard dry lining in Shepton Mallet | £638-£978 |
Wood flooring in Shepton Mallet | £750-£1,150 |
Wooden decking in Shepton Mallet | £1,125-£1,725 |
Garden shed in Shepton Mallet | £1,817-£3,730 |
Wooden window repair in Shepton Mallet | £320-£480 |
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look! Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe. Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs. Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Shepton Mallet.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today