Find a Carpenter you can trust in Bishops Castle.

Choose from 103 Carpenters, all rated by people like you.

Over 35 reviews & an average rating of 4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Mersey Landscapes

0 review(s)
Offers services in BISHOPS CASTLE
Mersey Landscapes is a professional landscaping company based in Liverpool that prides itself on every detail, Driveways, ...
Verified Pro

Simply Spotless Solutions

0 review(s)
Offers services in BISHOPS CASTLE
Expert Local Carpet Cleaning in Droitwich Simply Spotless Solutions are a professional carpet cleaning company based in D...
Verified Pro

Blue Iris Landscapes

0 review(s)
Offers services in BISHOPS CASTLE
Award-winning professional grounds maintenance, landscaping and garden design company catering for both commercial and pri...
Verified Pro

Spring Forward Landscapes

0 review(s)
Offers services in BISHOPS CASTLE
Hi there, My name is Adam and I’ve recently set up Spring Forward Landscapes in an attempt to offer services in line with...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Bishops Castle is:

£846

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Bishops Castle £975-£2,495
Carpenters and joiners in Bishops Castle £375-£575
Plasterboard dry lining in Bishops Castle £638-£978
Wood flooring in Bishops Castle £750-£1,150
Wooden decking in Bishops Castle £663-£1,863
Garden shed in Bishops Castle £325-£795
Wooden window repair in Bishops Castle £320-£480

Related Carpenter searches in Bishops Castle

Carpenter FAQs

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.
How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Bishops Castle.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Bishops Castle?

View our open Carpenter jobs near you

Join today
View Shortlist