Find a Carpenter you can trust in Galashiels.

Choose from 35 Carpenters, all rated by people like you.

Over 8 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Toplineroofing & gutters

0 review(s)
Offers services in GALASHIELS
We cover all aspects of gutter repairs Gutter cleaning Roof cleaning New gutter installation Drip felt Dry verdge
Verified Pro

Nick's Garden Care

0 review(s)
Offers services in GALASHIELS
Nicks garden care was established in 2017 and pride ourselves in professional garden maintenance service. Having worked wi...
Verified Pro
We at fifestonepaving are a committed workers that always try to give 100% satisfaction for all your landscaping needs we ...

Recent Carpenter Enquiries

11 Aug

Garden | Sheds

Galashiels - TD1

Enquiry from: Andrew W

Start Date: Immediate

removal of old shed and installation of new 6x8 shed are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: supply, install, rem...

Post a similar request >

08 Mar

Kitchen | Fitting

Galashiels - TD1

Enquiry from: Don T

Start Date: Immediate

New kitchen fitted and old kitchen removed

Post a similar request >

30 Nov

Kitchen | Fitting

Galashiels - TD1

Enquiry from: Shreya A

Start Date: Immediate

Wooden window repair Lead

a kitchen counter top has to be removed from one of the bar counters and mounted on a kitchen island. i need a quote for this. please feel free to reach out to me for the reference drawings. are you t...

Post a similar request >

13 Sep

Garden | Sheds

Galashiels - TD1

Enquiry from: TOM C

Start Date: Immediate

16FT LONG X 8FT WIDE SUPPLY AND ERECT

Post a similar request >

29 Apr

Interior work | Stud Walls

Galashiels - TD1

Enquiry from: Margaret M

Start Date: Immediate

move door and dry wall small room are you the property owner: owner of the property property type: other how many different rooms are you looking to have wall work on: 1-2 rooms what level of service ...

Post a similar request >

08 Apr

Garden | Decking

Galashiels - TD1

Enquiry from: Colleen W

Start Date: Immediate

brushes need removed lots of shrubbery been cut down and needs removed. also looking for potentially getting fences fixed and decking done property type: semi detached do you have a: medium size garde...

Post a similar request >

08 Oct

Garden | Sheds

Galashiels - TD1

Enquiry from: Carol B

Start Date: Immediate

6 x 8 garden shed with window - ready assembled for immediate delivery are you the property owner: tenant (with permission) do you have a: medium size garden what level of service are you looking for...

Post a similar request >

28 Jun

Garden | Sheds

Galashiels - TD1

Enquiry from: Shelagh K

Start Date: Immediate

lean-to bike shed to fit below window, to house 3 bikes. window ledge is 1.4 meters above ground are you the property owner: owner of the property do you have a: medium size garden what level of serv...

Post a similar request >

17 Feb

Garden | Sheds

Galashiels - TD1

Enquiry from: Neill S

Start Date: Immediate

Garden shed 3m x3m pitched roof, Gable end, pressure treated timber, 1 door and 1 window in Gable end, T & G floor.

Post a similar request >

22 Mar

Windows | Wooden | Repair

Selkirk - TD7

Enquiry from: John G

Start Date: Immediate

water is leaking*within the window seals or frame. during gale conditions The location is on first floor and is attached to a french door. Water is leaving stains on the ceiling below.

Post a similar request >

02 Oct

Garden | Sheds

Peebles - EH45

Enquiry from: Diane L

Start Date: Immediate

Replacement 6 x 4 wooden garden hut. Foundation in place. Can you please give me price?

Post a similar request >

13 Mar

Carpentry

Melrose - TD6

Enquiry from: Boon T

Start Date: Immediate

need two new door to separate kitchen and counter from the flat upstairs . fix new lock to 4 rooms time scale: 1-3 months please call to appoint are you the property owner: relative of owner property...

Post a similar request >

22 Oct

Garden | Sheds

Peebles - EH45

Enquiry from: Bill T

Start Date: Immediate

8 x4 base 6 high at front say 5.5 at rear. Central 2 door opening max 4 ft and secure. No windows. Intended to house 2 bikes and various garden type equipment. Please advise price and delivery. Bill ...

Post a similar request >

19 Oct

Garden | Sheds

Jedburgh - TD8

Enquiry from: Struan R

Start Date: Immediate

20X10FT STORAGE FOR CHAINSAWS and relevant tools.garden maintanance tools,2x grass cutter.etc Are you the property owner: Tenant (with permission) Do you have a: Large garden What level of service are...

Post a similar request >

26 Aug

Garden | Sheds

Melrose - TD6

Enquiry from: David S

Start Date: Immediate

8/6 garden shed

Post a similar request >

18 Apr

Garden | Decking

Jedburgh - TD8

Enquiry from: Roydon B

Start Date: Immediate

Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

05 Oct

Garden | Sheds

Peebles - EH45

Enquiry from: Sam G

Start Date: Less than one month

Are you the property owner: Tenant (with permission) Property Type: Terrace Other Forms: 10085, 13 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

16 Sep

Garden | Sheds

Peebles - EH45

Enquiry from: JR C

Start Date: 1 to 3 months

I require a 2x2 tool shed - I have looked and would like it dip treated or pressure treated, dependant on which is better (please advise me), and with an apex roof please. Also I would a storage shed...

Post a similar request >

18 Aug

Garden | Decking

Jedburgh - TD8

Enquiry from: Barbara |

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Garden tidy up and maintenance. Wooden disabled ramp.

Post a similar request >

13 Aug

Garden | Sheds

Selkirk - TD7

Enquiry from: Mitch C

Start Date: Less than one month

7x7 windowless double door pent delivered but not erected

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Galashiels is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Galashiels £975-£2,495
Carpenters and joiners in Galashiels £375-£575
Plasterboard dry lining in Galashiels £638-£978
Wood flooring in Galashiels £750-£1,150
Wooden decking in Galashiels £1,125-£1,725
Garden shed in Galashiels £450-£690
Wooden window repair in Galashiels £320-£480

Related Carpenter searches in Galashiels

Carpenter FAQs

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Galashiels.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Galashiels?

View our open Carpenter jobs near you

Join today
View Shortlist