Find a Carpenter you can trust in Auchterarder.

Choose from 70 Carpenters, all rated by people like you.

Over 22 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Pitch Perfect Laens

0 review(s)
Offers services in AUCHTERARDER
Pitch Perfect Lawns are a specialised lawn care business covering Crieff, Perth, Auchterarder, Blairgowrie and surrounding...
Verified Pro

Garden Bros

0 review(s)
Offers services in AUCHTERARDER
Garden Clean - ups & First cuts We are a Family run, Fully insured business. We are reliable, trustworthy and are reaso...
Verified Pro

K&D joinery

0 review(s)
Offers services in AUCHTERARDER
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro

Boxelder Landscapes

0 review(s)
Offers services in AUCHTERARDER
We have the hard landscaping skills to create your dream garden. Working from a idea or along side designers and architect...
Verified Pro

Composite Decking Glasgow

0 review(s)
Offers services in AUCHTERARDER
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro

Hutchison garden services

0 review(s)
Offers services in AUCHTERARDER
Landscaping business Fencing decking turf driveways paving

Recent Carpenter Enquiries

19 Feb

Garden | Sheds

Auchterarder - PH3

Enquiry from: Elizabeth H

Start Date: 1 to 3 months

6 x 10 shed, shelved on one side and on end. Already 6 x 6 concreted. Need erected, please. Are you the property owner: Owner of the property Do you have a: Medium size garden What level of service ar...

Post a similar request >

24 Aug

Garden | Sheds

Auchterarder - PH3

Enquiry from: Jade C

Start Date: Immediate

I am looking for a shed with a window to use for dog grooming. Approx 10x10 or 12x10.

Post a similar request >

04 Apr

Garden | Decking

Auchterarder - PH3

Enquiry from: Steven H

Start Date: Immediate

2.4m x 6.7m area - looking to have it decked. No extra fencing required. Current area is slabbed and gravelled. Standard hight decking. Are you the property owner: Owner of the property Property ...

Post a similar request >

22 Mar

Garden | Decking

Alloa, Clackmannan - FK10

Enquiry from: Jenny W

Start Date: Immediate

mrs requested quotes for wooden decking from a carpenter around alloa, clackmannan. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the informat...

Post a similar request >

28 Jul

Garden | Sheds

Perth - PH1

Enquiry from: Alyson J

Start Date: Immediate

customer made an enquiry for garden shed and confirmed on the quotatis site they would like quotes from a carpenter.customer lives in the perth area and would like a call to discuss options.see below ...

Post a similar request >

17 May

Garden | Sheds

Kinross - KY13

Enquiry from: Alex K

Start Date: Immediate

I’ve been away and my grass has grown too long for me to cut. I need a one off lawn cut. 8m x 10m not many obstacles just one shed

Post a similar request >

26 Sep

Kitchen | Fitting

Dunblane - FK15

Enquiry from: Claire P

Start Date: Immediate

new kitchen fitting. also moving the oven to the opposite wall. are you the property owner: owner of the property what level of service do you require: install only what is your budget for this projec...

Post a similar request >

18 Aug

Carpentry

Perth - PH1

Enquiry from: Steve F

Start Date: Immediate

swing out french door alignment what type of job are you looking to have done: other do you require a door(s): none time scale: immediate what level of service do you require: fit only property type: ...

Post a similar request >

15 Jun

Garden | Decking

Perth - PH2

Enquiry from: Craig M

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Front space flat with slight gradient beside. Remove weeds, deck flat area. Narrow / longer idea. Tidy decline , nice clean edge all way round . No clutter

Post a similar request >

24 Mar

Garden | Decking

Perth - PH1

Enquiry from: Alastair B

Start Date: Immediate

summer house deck installation approximately 12 square meters repair to existing deck system approximately 20 square meters are you the property owner: owner of the property property type: detached wh...

Post a similar request >

21 Mar

Garden | Decking

Stirling - FK9

Enquiry from: Jochen C

Start Date: Immediate

to replace existing timber decking with new structure; pretty much like for like are you the property owner: owner of the property property type: semi detached what level of service do you require: s...

Post a similar request >

21 Feb

Garden | Decking

Alloa, Clackmannan - FK10

Enquiry from: Susan D

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Large sloping garden is currently unsafe. Needs complete overhaul. Want low...

Post a similar request >

01 Dec

Garden | Decking

Alloa, Clackmannan - FK10

Enquiry from: Thomas S

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: semi detached work description: rear garden needs cleaning up, overgrown with trees and shrubs, garden site ...

Post a similar request >

06 Oct

Garden | Decking

Menstrie - FK11

Enquiry from: Stewart H

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a landscaper to discuss prices.please call to arrange an appointment to quote. are you the...

Post a similar request >

13 Aug

Garden | Sheds

Crieff - PH7

Enquiry from: Alistair W

Start Date: Immediate

Property type: Other, Roof type: Pitched, Work description: Shed roof also need some wood on side of shed and to paint shed .

Post a similar request >

17 Jul

Garden | Sheds

Dunblane - FK15

Enquiry from: Anne S

Start Date: Immediate

customer in dunblane area has requested that we arrange quotes for their garden shed project.mrs are considering various options and would like to discuss with a carpenter directly.please call to disc...

Post a similar request >

26 Mar

Garden | Sheds

Kinross - KY13

Enquiry from: Catrina D

Start Date: Immediate

need extenstion put on exsting shed side and length

Post a similar request >

03 Feb

Garden | Decking

Perth - PH1

Enquiry from: Brian S

Start Date: Immediate

good day, i am looking for a quote to install composite decking, this would be 3m depth x 4.5m wide and only one level with no step or railing. this will be in the corner of my garden. regards brian ...

Post a similar request >

15 Jan

Garden | Sheds

Alloa, Clackmannan - FK10

Enquiry from: Robert C

Start Date: Immediate

Customer visited the myroofingquotes.co.uk site and submitted an enquiry. Property type: Other, Roof type: Pitched, Work description: 12’ x 12’ shed roof leaking in several places. Covered with ...

Post a similar request >

20 Oct

Kitchen | Fitting

Alloa, Clackmannan - FK10

Enquiry from: Jim M

Start Date: Immediate

kitchen units and related rubbish no appliances

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Auchterarder is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Auchterarder £975-£2,495
Carpenters and joiners in Auchterarder £375-£575
Plasterboard dry lining in Auchterarder £638-£978
Wood flooring in Auchterarder £750-£1,150
Wooden decking in Auchterarder £1,125-£1,725
Garden shed in Auchterarder £450-£690
Wooden window repair in Auchterarder £320-£480

Related Carpenter searches in Auchterarder

Carpenter FAQs

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Auchterarder.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Auchterarder?

View our open Carpenter jobs near you

Join today
View Shortlist