Find a Carpenter you can trust in Cramlington.

Choose from 65 Carpenters, all rated by people like you.

Over 28 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in CRAMLINGTON
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro
Kitchens and Bathroom showroom. Nolte German kitchen designers and installers kitchens and bathrooms to homes across Cumbr...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in CRAMLINGTON
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in CRAMLINGTON
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...
Verified Pro

Toplineroofing & gutters

0 review(s)
Offers services in CRAMLINGTON
We cover all aspects of gutter repairs Gutter cleaning Roof cleaning New gutter installation Drip felt Dry verdge

Recent Carpenter Enquiries

03 Mar

Garden | Decking

Cramlington - NE23

Enquiry from: Daneil C

Start Date: Immediate

i'm exploring the option of decking out the back yard. it's about a 7m wide, 8m long area. it is on a downward slant from the back gate (the 8m length) with a drop of 6 rows of bricks. it's a fairly b...

Post a similar request >

30 May

Carpentry

Cramlington - NE23

Enquiry from: Bob F

Start Date: Immediate

i would like four new internal doors fitted to replace those that i've binned and one door that requires a fitted to a new passageway casing that needs supplying/fitting. i have all the necessary door...

Post a similar request >

10 Jun

Garden | Decking

Cramlington - NE23

Enquiry from: Peter H

Start Date: Immediate

lift wooden decking and replace with composite boards are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call ...

Post a similar request >

25 May

Garden | Sheds

Cramlington - NE23

Enquiry from: Julie H

Start Date: Immediate

10 x8 summer house built from flat pack are you the property owner: tenant (with permission) what level of service are you looking for: install do you have a: medium size garden please call to appoi...

Post a similar request >

08 Apr

Garden | Decking

Cramlington - NE23

Enquiry from: Mal R

Start Date: Immediate

looking for a quote to replace existing wooden decking and supply & fit dark brown composite decking. approx 5m x 5m area in cramlington, ***. are you the property owner: owner of the property propert...

Post a similar request >

19 Feb

Kitchen | Fitting

Cramlington - NE23

Enquiry from: Ian D

Start Date: 1 to 3 months

Price to replace kitchen benches, and to fit replacement cupboard doors, Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the req...

Post a similar request >

01 Jul

Carpentry

Gateshead - NE9

Enquiry from: Sophie Y

Start Date: Immediate

Hello, We have a hard wood flooring to our living room, which is currently covered by a carpet. It is bulging significantly and we would like to keep the flooring if possible. Additionally there a...

Post a similar request >

29 Apr

Carpentry

Gateshead - NE9

Enquiry from: Peter I

Start Date: Immediate

Hi Colin. I seem to have lost your number as you were on my old works phone. Hope you’re all keeping well. We are looking to have flooing replaced for hallway and through the kitchen with same finis...

Post a similar request >

13 Mar

Carpentry

Newcastle upon Tyne - NE16

Enquiry from: ZRIN D

Start Date: Immediate

BESPOKE WARDRIOBE DOORS TO FOLLOW SLANTED LOFT BEDROOM CEILING

Post a similar request >

19 Feb

Garden | Sheds

Washington - NE37

Enquiry from: Ellen M

Start Date: Immediate

small new leak in shed roof. the roof was replaced *** Feb and paid for but roofer has disappeared

Post a similar request >

30 Oct

Carpentry

Gateshead - NE11

Enquiry from: Isma N

Start Date: 1 to 3 months

hi, hope you are doing well. please provide a quote for fire door replacement (removal and installation). we have 15 fire doors that needs fitting. we are looking for best prices. kind regards, isma ...

Post a similar request >

28 Oct

Carpentry

Washington - NE38

Enquiry from: Bill P

Start Date: Immediate

We have 4 doors need fitting - 3 to be fitted to new frames and one to an existing frame. The 3 fitted to new frames will need architrave and all 4 will need hinges and handles thanks

Post a similar request >

01 Sep

Carpentry

Gateshead - NE11

Enquiry from: Gillian D

Start Date: Immediate

Glass panel in door, loft floored, x3 shelves/cupboards, outdoor pagoda, door furnitue

Post a similar request >

15 Aug

Carpentry

Gateshead - NE9

Enquiry from: Helen C

Start Date: Immediate

A banister on the staircase. There was one previously but it has been removed by previous homeowners.

Post a similar request >

12 Apr

Carpentry

Gateshead - NE9

Enquiry from: Nicola E

Start Date: Immediate

Looking for competitve quote for solid oak and glass staircase, 13 steps in total

Post a similar request >

02 Feb

Carpentry

Newcastle upon Tyne - NE16

Enquiry from: Stephen A

Start Date: Less than one month

new staircase to a loft conversion are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden staircases do you require a door(s):...

Post a similar request >

23 Sep

Garden | Sheds

Newcastle upon Tyne - NE16

Enquiry from: Maria P

Start Date: Immediate

Wooden window repair Lead

-overall garden tydying up, overgrown -shrubs and hedge trimming -remove one big plant -clear up pots , plant containers, a few opened planting soil bags etc. we don't need -possibly remove a shed -po...

Post a similar request >

21 Jun

Garden | Decking

Sunderland - SR4

Enquiry from: Joan R

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

small decking extension, only have a small back yard are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck please call to appo...

Post a similar request >

20 Apr

Garden | Decking

Chester le Street - DH3

Enquiry from: Sandra H

Start Date: Immediate

new layout of my garden , to include, summer house, fire pit, possibly hot tub, but to fit in with a cottage style house. are you the property owner: owner of the property property type: semi detached...

Post a similar request >

23 Aug

Garden | Decking

Gateshead - NE9

Enquiry from: Amileah R

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: 1 metre of flower bed around the perimeter of fence to hold it in place. A...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Cramlington is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Cramlington £975-£2,495
Carpenters and joiners in Cramlington £375-£575
Plasterboard dry lining in Cramlington £638-£978
Wood flooring in Cramlington £750-£1,150
Wooden decking in Cramlington £1,125-£1,725
Garden shed in Cramlington £450-£690
Wooden window repair in Cramlington £320-£480

Related Carpenter searches in Cramlington

Carpenter FAQs

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Cramlington.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Cramlington?

View our open Carpenter jobs near you

Join today
View Shortlist