Find a Carpenter you can trust in Morayshire.

Choose from 65 Carpenters, all rated by people like you.

Over 21 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Pitch Perfect Laens

0 review(s)
Offers services in MORAYSHIRE
Pitch Perfect Lawns are a specialised lawn care business covering Crieff, Perth, Auchterarder, Blairgowrie and surrounding...
Verified Pro

Garden Bros

0 review(s)
Offers services in MORAYSHIRE
Garden Clean - ups & First cuts We are a Family run, Fully insured business. We are reliable, trustworthy and are reaso...
Verified Pro

K&D joinery

0 review(s)
Offers services in MORAYSHIRE
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro

Boxelder Landscapes

0 review(s)
Offers services in MORAYSHIRE
We have the hard landscaping skills to create your dream garden. Working from a idea or along side designers and architect...
Verified Pro

Composite Decking Glasgow

0 review(s)
Offers services in MORAYSHIRE
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro

Hutchison garden services

0 review(s)
Offers services in MORAYSHIRE
Landscaping business Fencing decking turf driveways paving

Recent Carpenter Enquiries

20 Mar

Carpentry

Forres - IV36

Enquiry from: James H

Start Date: Immediate

Replacement decking (medium area, 15-30 square metres), and bedroom laminate flooring.

Post a similar request >

17 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Alex C

Start Date: Immediate

Hi, Our wooden garden shed roof seems to be leaking, we believe the roof felt has worn out? If this could be replaced or with a better material asap would be much appreciated. Can post pictures ove...

Post a similar request >

21 Mar

Windows | Wooden | Repair

Fochabers - IV32

Enquiry from: David G

Start Date: Immediate

17 No. sash and case windows require refurbishment. Missing and loose putty to be replaced. Wooden window sills replaced. General refurbishment of any damaged woodwork. All sanded and primed and finis...

Post a similar request >

22 Jan

Windows | Wooden | Repair

Elgin - IV30

Enquiry from: Michelle A

Start Date: 3+ months

sash window refurbishment. timber appears good condition. windows are painted shut and some strings broken. are you the property owner: owner of the property property type: detached what service ar...

Post a similar request >

26 Jul

Garden | Decking

Forres - IV36

Enquiry from: Carol A

Start Date: Immediate

full garden landscape fencing driveway patio etc. are you the property owner: relative of owner property type: detached do you have a: large garden garden type: back garden, front garden, side garden ...

Post a similar request >

02 Aug

Interior work | Stud Walls

Forres - IV36

Enquiry from: Beryl C

Start Date: Immediate

A small stud wall to devide utility room from the kitchen

Post a similar request >

14 Mar

Garden | Decking

Forres - IV36

Enquiry from: Michael B

Start Date: Immediate

good afternoon, my department within 39 engineer regiment of the british army are producing an option study for refurbishing an old cricket pavilion building on camp for future use as for hosting uni...

Post a similar request >

04 Aug

Carpentry

Elgin - IV30

Enquiry from: Lee S

Start Date: Immediate

would like a shed to be built in the garden, dimensions would roughly be 4 metres x 3 metres. i am looking to get an estimated and how long it would take to build. many thanks lee time scale: immediat...

Post a similar request >

03 Aug

Carpentry

Elgin - IV30

Enquiry from: Emeka A

Start Date: Immediate

dismantle part of a 3- seater sofa in order to get pass through a lounge door time scale: immediate please call to appoint

Post a similar request >

16 Jun

Garden | Sheds

Forres - IV36

Enquiry from: Jack C

Start Date: Immediate

looking for a wooden garden shed about 6x3 with a suitable base. this to be fitted on a flat area in garden, i require quotes and when this can possibly be done.

Post a similar request >

07 Jul

Windows | Wooden | Repair

Fochabers - IV32

Enquiry from: Suzanne J

Start Date: Immediate

Window panel has a massive crack in it. Frame is old style window frame that slides up and down. Number of Windows: 1 Material: Wood Are you the property owner: Tenant (with permission) What level of...

Post a similar request >

05 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Helen M

Start Date: 1 to 3 months

Garden shed no larger than 5 ft x 5ft. for new home at 6 grant st Burghead

Post a similar request >

31 Jan

Kitchen | Fitting

Elgin - IV30

Enquiry from: Kevin S

Start Date: 1 to 3 months

Old kitchen taken out and new kitchen installed Are you the property owner: Owner of the property Do you have all of the required materials for your kitchen already: Yes Agreed to recieve Kitchen Supp...

Post a similar request >

06 Oct

Carpentry

Forres - IV36

Enquiry from: Walter W

Start Date: Immediate

Glass partition in open plan office to create a separate office. Time scale: Immediate Please call to appoint

Post a similar request >

20 Sep

Garden | Sheds

Elgin - IV30

Enquiry from: Lewis D

Start Date: Less than one month

8ft by 6ft with door on the long wall of the shed Time scale: Less than one month

Post a similar request >

09 Aug

Garden | Decking

Elgin - IV30

Enquiry from: Jim D

Start Date: Immediate

We would like someone to design and install some decking in our back garden. Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply and ...

Post a similar request >

22 May

Carpentry

Elgin - IV30

Enquiry from: Simon M

Start Date: Immediate

Fitted wardrobe quote for 2 bedrooms and shelving and clothes rail for hallway required.

Post a similar request >

26 Apr

Garden | Decking

Elgin - IV30

Enquiry from: Ken P

Start Date: Immediate

Owner of static home and wanting some decking around the property. *

Post a similar request >

14 Mar

Garden | Decking

Elgin - IV30

Enquiry from: Allan P

Start Date: Immediate

Hi I am looking to get a price for some decking, 4 meter X 3 Meter, current surface is grass. What would be the cost of this please. Are you the property owner: Owner of the property Property Type: De...

Post a similar request >

29 Feb

Garden | Decking

Elgin - IV30

Enquiry from: Scott W

Start Date: Immediate

Wood decking area extending approximately 4 meters from pattio doors by approximately 3 meters wide. Looking for decorative railing and steps into garden. Are you the property owner: Owner of the pro...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Morayshire is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Morayshire £975-£2,495
Carpenters and joiners in Morayshire £375-£575
Plasterboard dry lining in Morayshire £638-£978
Wood flooring in Morayshire £750-£1,150
Wooden decking in Morayshire £1,125-£1,725
Garden shed in Morayshire £450-£690
Wooden window repair in Morayshire £320-£480

Related Carpenter searches in Morayshire

Carpenter FAQs

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Morayshire.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Morayshire?

View our open Carpenter jobs near you

Join today
View Shortlist