Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
- Incorporate flexible wood on concrete adhesives.
- With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
- Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
- Put 10mm spacers against the wall to see to the consistency in expansion gaps.
- Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
- Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
- Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
- Make use of a porta-nailer.
- Position 10mm spacers against the wall - parallel with the installation direction.
- Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
- Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
- Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
- Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.