Find a Carpenter you can trust in Prescot.

Choose from 148 Carpenters, all rated by people like you.

Over 70 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Clear Drain Services

0 review(s)
Offers services in PRESCOT
All drainage works carried out. All property maintenance works carried out. Same day response.
Verified Pro

M6 Flooring

0 review(s)
Offers services in PRESCOT
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

MAHL Interiors

0 review(s)
Offers services in PRESCOT
MAHL Interiors is a professional decorating and renovations company covering Cheshire and Lancashire. Offering our profess...
Verified Pro

Jd paving

0 review(s)
Offers services in PRESCOT
My names John from JD PAVING we are a proud family run business and got over 50+ experience in the landscaping industry we...

Recent Carpenter Enquiries

22 Jun

Kitchen | Fitting

Prescot - L34

Enquiry from: Rosaleen B

Start Date: Immediate

B&q galley kitchen, just units no appliances

Post a similar request >

29 Mar

Garden | Decking

Prescot - L35

Enquiry from: Chris C

Start Date: Immediate

i would like a composite decking fitted on the grass at the rear of the garden before having what is left of the grass changed to artificial. the decking would need to be raised so level with the wood...

Post a similar request >

12 Mar

Garden | Decking

Prescot - L35

Enquiry from: GLYN M

Start Date: Immediate

remove existing decking and replace with new. the area to be replaced is 10 feet by 8 feet are you the property owner: owner of the property property type: terrace what level of service do you requir...

Post a similar request >

02 Mar

Garden | Sheds

Prescot - L35

Enquiry from: Pam P

Start Date: Immediate

are you the property owner: owner property type: semi detached other forms: garden maintenance agreed to receive quotes for selected products: yes please call to appoint garden type: back garden work...

Post a similar request >

02 Mar

Garden | Sheds

Prescot - L35

Enquiry from: Pam P

Start Date: Immediate

are you the property owner: owner property type: semi detached other forms: garden maintenance agreed to receive quotes for selected products: yes please call to appoint do you have a: medium size ga...

Post a similar request >

02 Mar

Garden | Decking

Prescot - L35

Enquiry from: Lauren P

Start Date: Immediate

hello, we are looking for a quote to install 4m x 5m decking in a garden. i would be grateful if you could respond via email if possible as i use my phone for work so often miss calls whilst on the o...

Post a similar request >

29 Aug

Carpentry

Prescot - L34

Enquiry from: Richard N

Start Date: Immediate

two small internal part glass doors need to be replaced for the normal 6 panel white 21 inch x 79 time scale: immediate please call to appoint

Post a similar request >

30 Jul

Flooring | Wooden

Prescot - L35

Enquiry from: George A

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

08 Feb

Garden | Decking

Prescot - L35

Enquiry from: Mrs A

Start Date: 1 to 3 months

redesign back garden Decking removed, new patio area Tree & plants removed , grass in new design Are you the property owner: Owner of the property Property Type: Semi detached Garden Type: Back gar...

Post a similar request >

03 Jan

Flooring | Wooden

Prescot - L35

Enquiry from: Ben T

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

04 Aug

Garden | Decking

Prescot - L34

Enquiry from: Jennifer B

Start Date: Immediate

Are you the property owner: Relative of Owner Property Type: Semi detached What level of service do you require: Supply and deck Time scale: Immediate Please call to appoint

Post a similar request >

20 Nov

Carpentry

Prescot - L35

Enquiry from: Ken S

Start Date: Immediate

I have mobile home and want to change layout and have built-in TV entertainment area with maybe bookcase included . Would building new kitchen come into your area.

Post a similar request >

19 Sep

Carpentry

Prescot - L34

Enquiry from: W

Start Date: Immediate

double gate required for side of house in 2 weeks or earlier You did a single gate for me a few weeks ago was very pleased I would need you to measure Time scale: Immediate Please call to app...

Post a similar request >

23 Mar

Garden | Decking

Prescot - L35

Enquiry from: Elizabeth P

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Decking at bottom of garden & redesign lawn layout Steps up to garden & ...

Post a similar request >

24 Oct

Kitchen | Fitting

Prescot - L35

Enquiry from: Andrew G

Start Date: 1 to 3 months

Removal and disposal of Old Kitchen (retaining appliances) Removal of existing flooring Plaster Skim ceiling and replace lighting Move Large 'cooker' electrical socket and replace with new one. In...

Post a similar request >

12 Apr

Garden | Decking

Prescot - L34

Enquiry from: Lee R

Start Date: Immediate

I want a wood decking Are you the property owner: Tenant (with permission) Property Type: Detached What level of service do you require: Supply and deck Time scale: Immediate Call to appoint

Post a similar request >

03 Feb

Kitchen | Fitting

Prescot - L35

Enquiry from: Michelle C

Start Date: Immediate

To fit a 1.8mtr x 600mm worktop to a kitchen wall to create a breakfast bar effect Are you the property owner: Owner of the property What level of service do you require: Install only What is your bud...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Prescot is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Prescot £975-£2,495
Carpenters and joiners in Prescot £375-£575
Plasterboard dry lining in Prescot £638-£978
Wood flooring in Prescot £750-£1,150
Wooden decking in Prescot £1,125-£1,725
Garden shed in Prescot £450-£690
Wooden window repair in Prescot £320-£480

Related Carpenter searches in Prescot

Carpenter FAQs

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Prescot.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Prescot?

View our open Carpenter jobs near you

Join today
View Shortlist