The cost of just the engineered wood flooringis from £18 to £73 per m2.
Find a Carpenter you can trust in Cromarty.
Choose from 12 Carpenters, all rated by people like you.
Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you
Highland Green
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Cromarty is:
£879
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Cromarty | £975-£2,495 |
Carpenters and joiners in Cromarty | £375-£575 |
Plasterboard dry lining in Cromarty | £638-£978 |
Wood flooring in Cromarty | £750-£1,150 |
Wooden decking in Cromarty | £1,125-£1,725 |
Garden shed in Cromarty | £450-£690 |
Wooden window repair in Cromarty | £320-£480 |
Carpenter FAQs
After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.
• Friends, Relatives & Neighbours
If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.
• Store Contact Lists
You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.
• Internet
With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.
Click here to learn more about wood flooring.
- Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
- Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
- Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
- Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
- Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
- Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.
Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.
A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.
As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.
It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.
It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.
- Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
- Build a timber frame to size.
- Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
- Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
- Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
- Nail your timber shed base to the timber planks to create a sturdy base for your shed.
- Paving slabs – old or cheap ones are fine
- Timber for the frame and legs
- Type 1 MOT hardcore
- Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
- Add a 50mm layer of hardcore and make sure it’s compact.
- Build the decking sub-frame as we describe in ‘How to build a deck frame’.
- Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
- Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
- Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Cromarty.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Cromarty?
View our open Carpenter jobs near you
Join today