Find a Carpenter you can trust in Watford.

Choose from 372 Carpenters, all rated by people like you.

Over 394 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in WATFORD
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro
O-F paving are a trusted, professional company with a great reputation to uphold. We are based in epsom and cover all of S...
Verified Pro
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...
Verified Pro

Deluxe drives & patios

0 review(s)
Offers services in WATFORD
Welcome to Deluxe drives and patios Myself and my team take pride of our work, and we go above and beyond to keep each one...

Recent Carpenter Enquiries

10 Jan

Kitchen | Fitting

Watford - WD25

Enquiry from: V

Start Date: Immediate

fit a kitchen worktop, sink and some kitchen cabinet doors. are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materia...

Post a similar request >

04 Dec

Interior work | Stud Walls

Watford - WD17

Enquiry from: Trevor A

Start Date: Immediate

To build a stud wall with a doorway with an arch Wall approx 10ft wide x 8 ft high

Post a similar request >

07 Apr

Windows | Wooden | Repair

Watford - WD17

Enquiry from: Peter F

Start Date: Immediate

I have an upper bay aluminium window set into a wooden window frame. The mullion on the wooden frame and the wooden sill it sits on has rot. Subject to a survey, I have concluded that a wooden repl...

Post a similar request >

24 Jan

Garden | Decking

Watford - WD25

Enquiry from: Nick S

Start Date: Immediate

i have a hot tub made out of cedar. part of the tub already has a surround and steps leading up to the top to get in! however i would like to build a sun burst deck to match the surround and tie in ...

Post a similar request >

12 Jan

Garden | Decking

Watford - WD25

Enquiry from: Nick S

Start Date: Immediate

i have a hot tub made out of cedar. part of the tub already has a surround and steps leading up to the top to get in! however i would like to build a sun burst deck to match the surround and tie in ...

Post a similar request >

20 Aug

Garden | Decking

Watford - WD19

Enquiry from: Ron H

Start Date: Immediate

have wooden decking that is not in great shape now, looking to get it replaced with composite decking ? are you the property owner: owner of the property property type: semi detached what level of ser...

Post a similar request >

28 Apr

Garden | Decking

Watford - WD24

Enquiry from: Angie H

Start Date: Immediate

quote on neglected garden are you the property owner: owner property type: semi detached garden type: back garden, front garden work required: lawn/turfing do you have a: medium size garden current st...

Post a similar request >

22 Mar

Garden | Decking

Watford - WD18

Enquiry from: Rachel B

Start Date: Immediate

***m deck needs replacing including supports are you the property owner: tenant (with permission) property type: commercial what level of service do you require: supply and deck please call to appoin...

Post a similar request >

21 Mar

Carpentry

Watford - WD17

Enquiry from: Diksha S

Start Date: Immediate

Wooden window repair Lead

i have drawer built, without the base. got a wood panel. wood panel needs to cut and fitted in drawer base. are you the property owner: owner of the property what type of job are you looking to have d...

Post a similar request >

15 Mar

Carpentry

Watford - WD17

Enquiry from: Diksha S

Start Date: Immediate

Wooden window repair Lead

i have drawer built, without the base. got a wood panel. wood panel needs to cut and fitted in drawer base. are you the property owner: owner of the property what type of job are you looking to have d...

Post a similar request >

08 Mar

Carpentry

Watford - WD17

Enquiry from: Diksha S

Start Date: Immediate

Wooden window repair Lead

i have drawer built, without the base. got a wood panel. wood panel needs to cut and fitted in drawer base. are you the property owner: owner of the property what type of job are you looking to have d...

Post a similar request >

11 Mar

Garden | Decking

Watford - WD19

Enquiry from: Hamid M

Start Date: Immediate

decking to be laid on area 12ft x 11ft, area would also need to be levelled off. are you the property owner: owner of the property property type: semi detached what level of service do you require: s...

Post a similar request >

08 Mar

Garden | Decking

Watford - WD17

Enquiry from: Prasad B

Start Date: Immediate

property owner garden decking supply and fit please call to appoint

Post a similar request >

16 Nov

Carpentry

Watford - WD19

Enquiry from: Zohra I

Start Date: Immediate

fitting a bifold door between a lounge and conservatory are you the property owner: owner of the property do you require a door(s): patio/french door do you require a door(s): patio/french door, bifol...

Post a similar request >

10 Oct

Interior work | Stud Walls

Watford - WD18

Enquiry from: Dario M

Start Date: Immediate

we would like a stud wall to be erected between living and dining room. the rooms were previously separated by a wall which was removed. the original door to the living room was closed off, and we wou...

Post a similar request >

28 Sep

Garden | Sheds

Watford - WD19

Enquiry from: Bansi D

Start Date: Immediate

to assemble a ketar garden shed 7x7 are you the property owner: owner of the property what level of service are you looking for: install please call to appoint

Post a similar request >

29 Jul

Kitchen | Fitting

Watford - WD25

Enquiry from: Harry M

Start Date: Immediate

kitchen installation at newly built building

Post a similar request >

06 Jul

Garden | Sheds

Watford - WD25

Enquiry from: Anj M

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Garden levelled off into 3 sections. Fence putting up all around. One leve...

Post a similar request >

07 Apr

Carpentry

Watford - WD24

Enquiry from: Cedrir R

Start Date: Immediate

attic conversion

Post a similar request >

11 May

Garden | Decking

Watford - WD17

Enquiry from: Samiya R

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: My garden is I different levels. I want to level out and add borders, grass d...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Watford is:

£1,073

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Watford £1,238-£3,748
Carpenters and joiners in Watford £375-£575
Plasterboard dry lining in Watford £638-£978
Wood flooring in Watford £750-£1,150
Wooden decking in Watford £663-£3,363
Garden shed in Watford £300-£545
Wooden window repair in Watford £320-£480

Related Carpenter searches in Watford

Carpenter FAQs

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Watford.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Watford?

View our open Carpenter jobs near you

Join today
View Shortlist