Find a Carpenter you can trust in Stevenage.

Choose from 299 Carpenters, all rated by people like you.

Over 266 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in STEVENAGE
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified ProOver 20 Reviews

M R Contractors

31 review(s)
Offers services in STEVENAGE
M R Contractors has grown to become one of the most respected paving contractors in the area. Our attention to detail, unr...
Verified Pro

Aesthetic Gardens & Drives

0 review(s)
Offers services in STEVENAGE
Here at Aesthetic Gardens & Drives we specialize in transforming outdoor spaces into stunning landscapes. With a commitmen...
Verified Pro
We are a family run business with an array of experience and knowledge in the kitchen and bedroom industry. We offer the ...

Recent Carpenter Enquiries

22 May

Garden | Decking

Stevenage - SG1

Enquiry from: Michelle S

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached work description: create borders and plant shrubs,flowers. patio 3m squared area. build small decki...

Post a similar request >

19 Sep

Garden | Sheds

Stevenage - SG1

Enquiry from: Michael I

Start Date: Immediate

i need my already bought shed installed. are you the property owner: tenant (with permission) do you have a: medium size garden what level of service are you looking for: install please call to appoin...

Post a similar request >

13 Sep

Kitchen | Fitting

Stevenage - SG2

Enquiry from: Edna C

Start Date: Immediate

are you the property owner: owner of the property property type: terrace other forms: kitchen design & installation agreed to receive quotes for selected products: yes please call to appoint what lev...

Post a similar request >

10 Jul

Carpentry

Stevenage - SG2

Enquiry from: Philip K

Start Date: Immediate

erect 7x5 shed on plastic grid base time scale: immediate please call to appoint

Post a similar request >

07 Jul

Carpentry

Stevenage - SG1

Enquiry from: Ian S

Start Date: Immediate

How much to erect a 7x7 corner summer house? Concrete base already on site. Unit not bought yet. Still looking for a dependable supplier and nothing definite in mind except size. No extras required, ...

Post a similar request >

03 Jul

Carpentry

Stevenage - SG1

Enquiry from: Anjali M

Start Date: Immediate

foundation for shed space time scale: immediate please call to appoint

Post a similar request >

03 Jul

Garden | Decking

Stevenage - SG2

Enquiry from: Maggie F

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: borders made bigger to have a weed membrane put down and then covered in shingle...

Post a similar request >

18 Oct

Garden | Sheds

Stevenage - SG1

Enquiry from: Kwai P

Start Date: Immediate

Garden shed installation including foundation. Please can you provide a breakdown of the costs, thank you. Are you the property owner: Owner of the property Do you have a: Medium size garden What l...

Post a similar request >

05 Jun

Garden | Decking

Stevenage - SG2

Enquiry from: Allesse R

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: I think the garden needs to be levelled out. I would also like a decking p...

Post a similar request >

25 Jun

Kitchen | Fitting

Stevenage - SG1

Enquiry from: Tintu J

Start Date: Immediate

Need to install the kitchen

Post a similar request >

24 May

Kitchen | Fitting

Stevenage - SG1

Enquiry from: Efunjoke O

Start Date: Immediate

Are you the property owner: Owner of the property What level of service do you require: Install Only Do you have all of the required materials for your kitchen already: No Are you considering a design...

Post a similar request >

04 May

Garden | Decking

Stevenage - SG2

Enquiry from: Donna M

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Terrace Other Forms: 18, 92 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

15 Apr

Garden | Decking

Stevenage - SG1

Enquiry from: Kaye E

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Other, Work description: Dig up exsisting lawn and flower beds compacting soil level ready for gravel and t...

Post a similar request >

30 Jan

Garden | Decking

Stevenage - SG1

Enquiry from: Danielle B

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Other, Work description: I need my front and back garden done, minor digging, possibly decking, a pathway

Post a similar request >

09 Jul

Garden | Sheds

Stevenage - SG2

Enquiry from: Dawn W

Start Date: Less than one month

Large dismantled shed to be taken away Are you the property owner: Tenant (with permission) Do you have a: Medium size garden What level of service are you looking for: Removal of old Time scale: Les...

Post a similar request >

10 May

Garden | Decking

Stevenage - SG1

Enquiry from: Georgi G

Start Date: Immediate

Existing decking removal new sandstone laying Real grass removal artificial grass laying Garden approx 7m by 7 m Are you the property owner: Owner of the property Property Type: Semi detached Rough...

Post a similar request >

17 Nov

Kitchen | Fitting

Stevenage - SG2

Enquiry from: Simon O

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 16ft by 12, Property type: House, Work description: kitcken units and bits

Post a similar request >

25 Oct

Carpentry

Stevenage - SG2

Enquiry from: Carole G

Start Date: Less than one month

to make and fit a short length of custom skirting board with decorative vents (something like a lattice design or similar) to allow air circulation Time scale: Less than one month Please call to app...

Post a similar request >

14 Sep

Carpentry

Stevenage - SG2

Enquiry from: Bernardo D

Start Date: Immediate

Need initially to do a wardrobe, possibly in MDF. Depth 60cm x Height 235cm x Length 205cm (all approximative sizes) It will mostly be racks for suits and shirts and 2 shelves We can book a time ...

Post a similar request >

06 Jul

Garden | Decking

Stevenage - SG1

Enquiry from: Emma L

Start Date: Immediate

Work description: I need a patio and wooden decking making good, lawn maintenance and borders digging/shrubs planting Are you the property owner: Owner of the property Property Type: Terrace Wh...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Stevenage is:

£1,018

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Stevenage £1,238-£3,748
Carpenters and joiners in Stevenage £375-£575
Plasterboard dry lining in Stevenage £638-£978
Wood flooring in Stevenage £750-£1,150
Wooden decking in Stevenage £1,125-£1,725
Garden shed in Stevenage £450-£690
Wooden window repair in Stevenage £320-£480

Related Carpenter searches in Stevenage

Carpenter FAQs

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

How much does it cost to hang a door?

Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.

• Door & Frame Installation Job and the average Cost in £'s

• uPVC door installation including glazing & architrave costs around £90 per door

• uPVC french & patio door sets including glazing & architrave costs around £120 per pair

• Softwood french & patio door sets including architrave costs around £180 per door

• Hardwood french & patio door sets including architrave would cost around £250 per pair

• Softwood internal door hanging only would be around £40 per door

• Hardwood internal door hanging only would set you back around £48 per door

• Softwood external door hanging only is around £60 per door

• Hardwood external door hanging would cost around £70 per door

• Locks, letterboxes & door furniture timber doors are around £15 per Item

• Glazing £15 per pane

• Brick cut-outs single doors is around £60 per cut-out

• French or patio door brick cut-outs will be around £90 per cut-out

• New lintels will cost around £150 per lintel

Door Repair Costs and Charges

Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.

Average Cost of Door Repair Job

Replacement glazing units for uPVC doors will be around £15 per unit

Replacement glazing units for timber doors is around £20 per unit

Replacement door glass pined & putty will cost£30 per pane

Replacement handles are around £10 each and general repair work will cost you £25 per hour

Building & FENSA certificate charges

FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.

Average Cost of Window Repair Job: One to two doors will cost around £85

Average Cost of Door Fixtures & Fittings Removal Job

Removing internal doors will cost around £10

Removing internal door liners will cost around £15

Removing external timber doors will cost about £10

Removing External timber door frame will be around £20

Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Stevenage.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Stevenage?

View our open Carpenter jobs near you

Join today
View Shortlist