Garden | Decking
Radlett - WD7
Enquiry from: ADAM C
Start Date: Immediate
Are you the property owner: Owner of the property Property Type: Terrace What level of service do you require: Supply and deck Time scale: Immediate Please call to appoint
-->
Over 378 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Radlett - WD7
Enquiry from: ADAM C
Start Date: Immediate
Are you the property owner: Owner of the property Property Type: Terrace What level of service do you require: Supply and deck Time scale: Immediate Please call to appoint
Radlett - WD7
Enquiry from: Paul D
Start Date: Immediate
solid floor to be laid in through lounge and hallway. How much per square Metre. Please call to appoint Please call to appoint Please call to appoint Please call to appoint Please call to appoint Plea...
Radlett - WD7
Enquiry from: Deepak V
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Require the following: - Removal of shrubs in a confined area and replace wi...
Berkhamsted - HP4
Enquiry from: Jen W
Start Date: Immediate
hi we are looking to replace the doors in our house as they are now very dated. there are 20 doors in total that are hinged doors, all fire doors. as well as 2 sets of pocket doors, one set of which ...
Berkhamsted - HP4
Enquiry from: Michael M
Start Date: Immediate
fitting of one pair of rebated double doors (todds) are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/doors how man...
Hemel Hempstead - HP2
Enquiry from: Charmaine E
Start Date: Immediate
hello we are a local primary school in need of one door fitting that we already have purchased but we also need an additional door purchased a fitted to a classroom and some double doors for our dinin...
Hemel Hempstead - HP1
Enquiry from: Max L
Start Date: Immediate
i live in a block of flats and the front door handle to our flat is coming off. i have taken the handle off to see if it needs an additional screw but whoever originally fitted the door, drilled the h...
Rickmansworth - WD3
Enquiry from: Tim O
Start Date: Less than one month
i need to fit a door to a study…ideally a solid / soundproof door are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden...
Rickmansworth - WD3
Enquiry from: Michael V
Start Date: Immediate
hi, i'm looking for a composite decking installation, i also need help to pick up and order the proper decking material. i need to cover 20-30 sq.m of patio space. please let me know if you work with ...
Iver - SL0
Enquiry from: Yvonne N
Start Date: Immediate
required for 1 day to fit work tops, unit handles, create a sliding shelf, and if time permits, open and fit the 4 remaining intermetal unit shelves. are you the property owner: owner of the property...
Chesham - HP5
Enquiry from: Charles B
Start Date: Immediate
Flat shed roof, 3.5m x 2.5m needs refelting. Please quote price and lead time. Thank you.
Berkhamsted - HP4
Enquiry from: Katja S
Start Date: Immediate
Hi, My Victorian wooden casement windows need renovating and painting. Can you help? Thank you. Katja
West Drayton - UB7
Enquiry from: Emma B
Start Date: Immediate
Hi, I am looking for someone to come out and quote for new flooring the reception area. We currently have tiles.
Amersham - HP7
Enquiry from: David G
Start Date: Immediate
replacement of old decking and handrails. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint
Hemel Hempstead - HP2
Enquiry from: Sweta P
Start Date: Immediate
to replace old door frames and fit new one with new doors and skirtings in 4 bedrooms are you the property owner: owner of the property property type: terrace what type of job are you looking to have ...
Amersham - HP7
Enquiry from: David G
Start Date: Immediate
replacement of old decking and handrails. are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint
Chesham - HP5
Enquiry from: Claire W
Start Date: Immediate
our garden is on a slope and we would part of it levelling to allow us to put a shed there. it would be a medium size shed. are you the property owner: owner property type: terrace do you have a: medi...
Uxbridge - UB8
Enquiry from: Rachael B
Start Date: Immediate
experienced kitchen fitter are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your kitchen already: yes ...
Amersham - HP6
Enquiry from: Stephen H
Start Date: Immediate
erect a dunster house evil jeff summerhouse and shed log cabin including lay floor and fit roof including fix the shingle roofing material, bas prepared in advance by others. size of complete unit is ...
Hemel Hempstead - HP2
Enquiry from: Lyn P
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Remove conservatory lay patio and Astra turf replace shed and tidy up fron...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Radlett | £1,238-£3,748 |
Carpenters and joiners in Radlett | £375-£575 |
Plasterboard dry lining in Radlett | £638-£978 |
Wood flooring in Radlett | £750-£1,150 |
Wooden decking in Radlett | £663-£3,363 |
Garden shed in Radlett | £300-£545 |
Wooden window repair in Radlett | £320-£480 |
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
Considerations
If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.
General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.
Time
The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.
The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.
General Carpentry Costs in the UK:
• National Minimum Cost is £20
• National Maximum Cost is £25
• The national average is around £22
Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):
• Furniture Refinishing is around £17
• A Cabinet Repair is around £23
• Finish Carpentry will set you back a minimum of £30
• General Carpentry is around £20
• Fine Woodworking is about £20
Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
To install onto plywood, you can follow this guide:
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Radlett.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today