Find a Carpenter you can trust in Ross-on-wye.

Choose from 89 Carpenters, all rated by people like you.

Over 121 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

Tree & Garden Designs

63 review(s)
Offers services in ROSS-ON-WYE
I am a family runed business professional and efficient for 30 years !
Verified Pro

J & D Home Improvements

0 review(s)
Offers services in ROSS-ON-WYE
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro

Platinum Fencing Specialists

0 review(s)
Offers services in ROSS-ON-WYE
Platinum Fencing Carry out any fencing work that is needed, from weather damaged panels to full take down and replace fenc...
Verified Pro

Simply Spotless Solutions

0 review(s)
Offers services in ROSS-ON-WYE
Expert Local Carpet Cleaning in Droitwich Simply Spotless Solutions are a professional carpet cleaning company based in D...
Verified Pro

Spring Forward Landscapes

0 review(s)
Offers services in ROSS-ON-WYE
Hi there, My name is Adam and I’ve recently set up Spring Forward Landscapes in an attempt to offer services in line with...

Recent Carpenter Enquiries

06 Dec

Garden | Decking

Ross-on-Wye - HR9

Enquiry from: Barry H

Start Date: Immediate

ecodec (or similar) composite decking laid partly on existing slabs outside sliding doors and extended on upward sloping lawn (needs levelling) and under a fan shape pergola. total area estimated 28/3...

Post a similar request >

26 Nov

Garden | Decking

Ross-on-Wye - HR9

Enquiry from: Barry H

Start Date: Immediate

ecodec (or similar) composite decking laid partly on existing slabs outside sliding doors and extended on upward sloping lawn (needs levelling) and under a fan shape pergola. total area estimated 28/3...

Post a similar request >

03 May

Garden | Sheds

Ross-on-Wye - HR9

Enquiry from: Belinda C

Start Date: Immediate

We are looking for a price for a plain windowless lockable, shed, wooden or metal, size 10'x8' with a base.

Post a similar request >

28 Feb

Carpentry

Ross-on-Wye - HR9

Enquiry from: Jess S

Start Date: Immediate

9 replacement internal doors Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

17 Jul

Carpentry

Coleford - GL16

Enquiry from: Sarah W

Start Date: Immediate

Hi Hales have made some shutters for my bay window and I need you to hang them please....they are in 4 sections each side of the window. No rush. kind regards Sarah Wallace Sunnybank House Sp...

Post a similar request >

27 May

Carpentry

Coleford - GL16

Enquiry from: Julian L

Start Date: Immediate

Wooden window repair Lead

Existing oak door turned around to hinge on other side and direction

Post a similar request >

11 Sep

Garden | Sheds

Blakeney, Lydney - GL15

Enquiry from: Georgia G

Start Date: Immediate

About 2 years ago I had 2/3 of my composite patio built and I love it, never got round to getting the rest done - have some of the material left over which I’d like to salvage what’s left as some ...

Post a similar request >

23 Mar

Garden | Decking

Monmouth - NP25

Enquiry from: Rob S

Start Date: Immediate

old wooden deck replacing

Post a similar request >

08 Mar

Kitchen | Fitting

Hereford - HR1

Enquiry from: Anthony E

Start Date: Immediate

I need someone to repair or replace a cooker hood

Post a similar request >

08 Mar

Kitchen | Fitting

Hereford - HR1

Enquiry from: Anthony E

Start Date: Immediate

We need a repair or replacement of a cooker hood

Post a similar request >

31 Oct

Carpentry

Gloucester - GL2

Enquiry from: Beverley J

Start Date: Immediate

quote to fit a front do please. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many windows do y...

Post a similar request >

23 Sep

Carpentry

Hereford - HR2

Enquiry from: Luke D

Start Date: Less than one month

oak doors fitted and trimmed in length for fit. with chrome handles fitted are you the property owner: owner of the property property type: semi detached do you require a door(s): none what type of jo...

Post a similar request >

21 Sep

Kitchen | Fitting

Cinderford, Newnham, Westbury-on-Severn - GL14

Enquiry from: Roger B

Start Date: Immediate

Replace doors sink top taps worktops

Post a similar request >

19 Aug

Interior work | Stud Walls

Gloucester - GL2

Enquiry from: Julie P

Start Date: Immediate

unit 3g, llanthony business park, llanthony road, gloucester, *** hi, i am making a space into a staff office and need partitioning on 2 walls - just 4' for one and 7' for the other with a door. the c...

Post a similar request >

23 Jul

Carpentry

Gloucester - GL2

Enquiry from: Pauline d

Start Date: Immediate

requesting a visit to assess staircase and provide a quotation. are you the property owner: tenant (with permission) property type: semi detached what type of job are you looking to have done: wooden ...

Post a similar request >

15 Jun

Garden | Decking

Gloucester - GL2

Enquiry from: Zuzana P

Start Date: Immediate

customer in gloucester areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via email at 15/06/2022 15:40.please call to arrange appoi...

Post a similar request >

08 Jun

Kitchen | Fitting

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Stephen B

Start Date: Immediate

installation of a relatively small kitchen designed and supplied by howdens. this includes fitting a belfast sink, wooden work tops and moving a couple of power points as well as fitting the cupboard...

Post a similar request >

10 Apr

Garden | Sheds

Blakeney, Lydney - GL15

Enquiry from: Ellie W

Start Date: Immediate

We have an area of grass which is level at the bottom but slopes upwards mid-top. We would like a retaining wall put in with a couple of steps. We also would like a shed base for a 6x4 installed. Look...

Post a similar request >

31 Mar

Garden | Decking

Hereford - HR1

Enquiry from: Kiarash D

Start Date: Immediate

6m circular or octagonal decking with insulation as a yurt platform. are you the property owner: tenant (with permission) property type: commercial what level of service do you require: supply and de...

Post a similar request >

29 Mar

Carpentry

Cinderford, Newnham, Westbury-on-Severn - GL14

Enquiry from: Denise O

Start Date: Less than one month

5 internal hollow doors 2 doorways are complete 1 doorway needs doir stop 2 needs linings and stop i have all materials are you the property owner: owner of the property what type of job are you looki...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Ross-on-wye is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Ross-on-wye £975-£2,495
Carpenters and joiners in Ross-on-wye £375-£575
Plasterboard dry lining in Ross-on-wye £638-£978
Wood flooring in Ross-on-wye £750-£1,150
Wooden decking in Ross-on-wye £1,125-£1,725
Garden shed in Ross-on-wye £450-£690
Wooden window repair in Ross-on-wye £320-£480

Related Carpenter searches in Ross-on-wye

Carpenter FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

Who makes the best garden sheds?
Who makes the best garden sheds? While you think there might be a straightforward answer, who makes the best shed for you depends on what you need it for, how much space you have and more. We’ll help you find out who makes the best garden shed for you. What to look for in a garden shed Before you fork out for a new shed, consider:
  • What you need the shed for
  • How much space you have
  • How big you need the shed to be
  • Which style of roof you want
  • What material you would like
  • How big your budget is
Once you know the answer to these questions, you can take a look at some of the best brands of garden shed. Shed-Plus Champion Shed-Plus Champion heavy duty sheds are robust wooden garden sheds that have fully ledged and braced doors and integral ‘lock and key’ locking system. They come with a 15-year anti-rot warranty, so should last you a long time; they’re made from 12mm tongue and groove panels which helps to keep them strong and secure for years to come. Our top pick: 8′ x 6′ Heavy Duty Apex Single Door Shed
  • Hand-crafted from Nordic White Spruce
  • Felt roof reinforced with high-grade polyester
  • Tongue and groove cladding makes it more weatherproof so ideal for items that must be kept dry
Forest Garden Forest Garden makes a range of wooden sheds to suit any outdoor space. They offer overlap sheds, which are the cheapest option, shiplap sheds which are tongue and groove, and premium tongue and groove sheds. You’ll be able to find something to suit your budget and your needs. Our top pick: Overlap Pressure Treated 6×4 Pent Shed
  • High eaves for more head height and to store taller items
  • Pent roof and fixed windows allow lots of light
  • Ideal for putting up against a wall or fence
  • Door can be hinged either side
BillyOh BillyOh sheds are affordable wooden sheds that come in lots of shapes and sizes, so you’re bound to find one to suit your garden. They offer wooden floors as an optional extra as well as lots of other things so you can create a bespoke shed that will work best for you. Our top pick: Master Tall Store
  • Ideal for small gardens or those with fewer tools to store
  • Apex roof for water runoff
  • Tongue and groove walls
  • Tall floor-to-gable door
Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Ross-on-wye.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Ross-on-wye?

View our open Carpenter jobs near you

Join today
View Shortlist