Carpentry
New Milton - BH25
Enquiry from: Christopher M
Start Date: Immediate
Carpenter to help fit worktops in New Kitchen, fit doors, other carpentry.
-->
Over 73 reviews & an average rating of 4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
New Milton - BH25
Enquiry from: Christopher M
Start Date: Immediate
Carpenter to help fit worktops in New Kitchen, fit doors, other carpentry.
New Milton - BH25
Enquiry from: Steve J
Start Date: Less than one month
supply and fit an interior door plain flat are you the property owner: tenant (with permission) property type: terrace time scale: less than one month what level of service do you require: supplied a...
New Milton - BH25
Enquiry from: Peter W
Start Date: Immediate
grateful for a quote on behalf of my parents who are moving house. fair bit - about one skip full - of general garden rubbish including remains of small demolished shed at bottom end of large garden. ...
New Milton - BH25
Enquiry from: John N
Start Date: Immediate
constuction of 7x5 wooden shed are you the property owner: owner of the property what level of service are you looking for: install do you have a: small garden please call to appoint
New Milton - BH25
Enquiry from: Andrew S
Start Date: Less than one month
Decking needs some repair and then painting/staining and fence painting Are you the property owner: Owner of the property Property Type: Terrace What level of service do you require: Supply and deck T...
New Milton - BH25
Enquiry from: S
Start Date: Immediate
Fitting new wiks kitchen
Bournemouth - BH6
Enquiry from: Joe T
Start Date: Immediate
We have 4 bay windows with original wooden frames that have been retrofitted to accomodate double glazed units. the exterior of the windows have UPVC trim on the. I beleive the wood is in good conditi...
Bournemouth - BH6
Enquiry from: Ben C
Start Date: Immediate
Please send an email address so that we can email the drawings to you
Bournemouth - BH1
Enquiry from: Martin W
Start Date: 1 to 3 months
i manage a block of 54 flats (bh1) we need to change 54 letter boxes and add a third hinge to 48 emergency fire doors to be compliant with new 2023 fire rules. i am after quotes for some/all of this ...
Bournemouth - BH3
Enquiry from: Grant G
Start Date: Immediate
internal timber stud wall with door and plater board. are you the property owner: owner of the property property type: detached how many different rooms are you looking to have wall work on: 1-2 rooms...
Poole - BH12
Enquiry from: Martin T
Start Date: 1 to 3 months
remove two existing internal doors and fit replacements, one of which will be glazed are you the property owner: owner of the property property type: semi detached what level of service do you require...
Poole - BH14
Enquiry from: Jenny M
Start Date: 1 to 3 months
need the entrance door to my flat changing to open the other way. have to use the existing fire door are you the property owner: owner of the property property type: other what type of job are you loo...
Poole - BH12
Enquiry from: Victoria K
Start Date: Immediate
miss requested quotes for wooden decking from a carpenter around poole. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is...
Totland Bay - PO39
Enquiry from: Jane L
Start Date: Immediate
raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...
Totland Bay - PO39
Enquiry from: Jane L
Start Date: Immediate
raise ground levels, decking and borders to be made. are you the property owner: owner of the property property type: semi detached do you have a: medium size garden garden type: back garden work requ...
Bournemouth - BH6
Enquiry from: Frances S
Start Date: Immediate
erection of shed, 7 x 5 on existing site. present building rotten. have ordered a new one, arriving on 7 june. are you the property owner: owner of the property what level of service are you looking f...
Bournemouth - BH6
Enquiry from: Marion H
Start Date: Immediate
new kitchen worktops kitchen cupboard doors,under stairs redone are you the property owner: owner of the property what level of service do you require: install only do you have all of the required mat...
Bournemouth - BH4
Enquiry from: Rob J
Start Date: Immediate
we are looking for hardwood or hardwood looking decking, 4x4.5m, posted base to level, plus skirt close to ground. we are in westbourne, bournemouth. what would this roughly cost please. kind regards ...
Bournemouth - BH8
Enquiry from: MR N
Start Date: Immediate
fit a howdens kitchen and worktop in new kitchen.space. are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials ...
Totland Bay - PO39
Enquiry from: Jessica B
Start Date: Immediate
would need 45sqm of millboard decking installed for a balcony project. the measurements from the slope to where the balcony should sit are 0.15cm from the shortest point and 0.3cm from the highest. a...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in New Milton | £975-£2,495 |
Carpenters and joiners in New Milton | £375-£575 |
Plasterboard dry lining in New Milton | £638-£978 |
Wood flooring in New Milton | £750-£1,150 |
Wooden decking in New Milton | £1,125-£1,725 |
Garden shed in New Milton | £450-£690 |
Wooden window repair in New Milton | £320-£480 |
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
How To Plasterboard A Brick Wall
Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!
lAttach Furring Strips
• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.
• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.
• Hit a 3 inch fluted nail through the hole using a sledgehammer
• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.
• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.
• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.
• Hit a 3 inch fluted nail through the pilot hole.
lApply Plasterboard
• Hold a plasterboard sheet against the furring strips.
• Use plasterboard screw to hold the drywall sheets in place.
• Use fibreglass to cover the joints where the two plasterboard sheets meet.
• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.
• Use a sandpaper to smooth the joint compound.
• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.
• Use a light sandpaper to smooth the final coat.
Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in New Milton.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today