Find a Carpenter you can trust in Garndolbenmaen.

Choose from 73 Carpenters, all rated by people like you.

Over 62 reviews & an average rating of 4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

M6 Flooring

0 review(s)
Offers services in GARNDOLBENMAEN
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Mersey Landscapes

0 review(s)
Offers services in GARNDOLBENMAEN
Mersey Landscapes is a professional landscaping company based in Liverpool that prides itself on every detail, Driveways, ...
Verified Pro

Setinstone driveways

0 review(s)
Offers services in GARNDOLBENMAEN
A Friendly Family run business, Specializing in Driveways & patios. With over 12 years experience working in landscaping a...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Garndolbenmaen is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Garndolbenmaen £975-£2,495
Carpenters and joiners in Garndolbenmaen £375-£575
Plasterboard dry lining in Garndolbenmaen £638-£978
Wood flooring in Garndolbenmaen £750-£1,150
Wooden decking in Garndolbenmaen £1,125-£1,725
Garden shed in Garndolbenmaen £450-£690
Wooden window repair in Garndolbenmaen £320-£480

Related Carpenter searches in Garndolbenmaen

Carpenter FAQs

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Garndolbenmaen.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Garndolbenmaen?

View our open Carpenter jobs near you

Join today
View Shortlist