Find a Carpenter you can trust in Dolwyddelan.

Choose from 74 Carpenters, all rated by people like you.

Over 62 reviews & an average rating of 4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

M6 Flooring

0 review(s)
Offers services in DOLWYDDELAN
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Mersey Landscapes

0 review(s)
Offers services in DOLWYDDELAN
Mersey Landscapes is a professional landscaping company based in Liverpool that prides itself on every detail, Driveways, ...
Verified Pro

Setinstone driveways

0 review(s)
Offers services in DOLWYDDELAN
A Friendly Family run business, Specializing in Driveways & patios. With over 12 years experience working in landscaping a...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Dolwyddelan is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Dolwyddelan £975-£2,495
Carpenters and joiners in Dolwyddelan £375-£575
Plasterboard dry lining in Dolwyddelan £638-£978
Wood flooring in Dolwyddelan £750-£1,150
Wooden decking in Dolwyddelan £1,125-£1,725
Garden shed in Dolwyddelan £450-£690
Wooden window repair in Dolwyddelan £320-£480

Related Carpenter searches in Dolwyddelan

Carpenter FAQs

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Dolwyddelan.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Dolwyddelan?

View our open Carpenter jobs near you

Join today
View Shortlist