Find a Carpenter you can trust in Brynteg.

Choose from 72 Carpenters, all rated by people like you.

Over 61 reviews & an average rating of 4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

M6 Flooring

0 review(s)
Offers services in BRYNTEG
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Setinstone driveways

0 review(s)
Offers services in BRYNTEG
A Friendly Family run business, Specializing in Driveways & patios. With over 12 years experience working in landscaping a...
Verified Pro

Mersey Landscapes

0 review(s)
Offers services in BRYNTEG
Mersey Landscapes is a professional landscaping company based in Liverpool that prides itself on every detail, Driveways, ...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Brynteg is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Brynteg £975-£2,495
Carpenters and joiners in Brynteg £375-£575
Plasterboard dry lining in Brynteg £638-£978
Wood flooring in Brynteg £750-£1,150
Wooden decking in Brynteg £1,125-£1,725
Garden shed in Brynteg £450-£690
Wooden window repair in Brynteg £320-£480

Related Carpenter searches in Brynteg

Carpenter FAQs

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Can I install wooden flooring myself?

Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look!  Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe.  Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs.  Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Brynteg.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Brynteg?

View our open Carpenter jobs near you

Join today
View Shortlist