Garden | Decking
Monmouth - NP25
Enquiry from: Rob S
Start Date: Immediate
old wooden deck replacing
-->
Over 162 reviews & an average rating of 4.1/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Monmouth - NP25
Enquiry from: Rob S
Start Date: Immediate
old wooden deck replacing
Monmouth - NP25
Enquiry from: Karen B
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Removal of very small area of concrete. Level off the area. Lay small patio, use s...
Monmouth - NP25
Enquiry from: Sian D
Start Date: Immediate
2 new staircases to be measured, made and installed. Listed building so conservation require continuous hand rail, square spindles. Only looking have handrail in oak, all other elements softwood/MDF...
Monmouth - NP25
Enquiry from: Sian D
Start Date: Immediate
Ordering STAIRBOX manufactured stairs for 2 houses undergoing restoration. Need a competent joiner(s) to fit the 2 stairs together and make/ fit on site.
Monmouth - NP25
Enquiry from: Michael O
Start Date: Immediate
Bespoke wardrobes for two bedrooms
Coleford - GL16
Enquiry from: Sarah W
Start Date: Immediate
Hi Hales have made some shutters for my bay window and I need you to hang them please....they are in 4 sections each side of the window. No rush. kind regards Sarah Wallace Sunnybank House Sp...
Caldicot - NP26
Enquiry from: Richard G
Start Date: Immediate
I have some work in Tenby that I'm looking to contract out double shop front give me a call if you fancy pricing for me.
Coleford - GL16
Enquiry from: Julian L
Start Date: Immediate
Existing oak door turned around to hinge on other side and direction
Crickhowell - NP7
Enquiry from: Margaret H
Start Date: Immediate
I need a new front door together with replacement frame. Looking for a good quality stable door with small window at the top.
Blakeney, Lydney - GL15
Enquiry from: Georgia G
Start Date: Immediate
About 2 years ago I had 2/3 of my composite patio built and I love it, never got round to getting the rest done - have some of the material left over which I’d like to salvage what’s left as some ...
Crickhowell - NP7
Enquiry from: Richard W
Start Date: Immediate
Quote to supply and fit fence panels
Chepstow - NP16
Enquiry from: Jeff D
Start Date: Immediate
customer in chepstow area has requested that we arrange quotes for their garden shed project.they are considering various options and would like to discuss with a carpenter directly.please call to dis...
Hereford - HR2
Enquiry from: Luke D
Start Date: Less than one month
oak doors fitted and trimmed in length for fit. with chrome handles fitted are you the property owner: owner of the property property type: semi detached do you require a door(s): none what type of jo...
Cinderford, Newnham, Westbury-on-Severn - GL14
Enquiry from: Roger B
Start Date: Immediate
Replace doors sink top taps worktops
Chepstow - NP16
Enquiry from: William C
Start Date: Immediate
i need a 6ft x 8ft area of my lawn levelled to form the foundations of a shed. would you be able to do this? what material would it be finished with? one of the sheds i've seen includes a plastic base...
Chepstow - NP16
Enquiry from: William C
Start Date: Immediate
i need a 6ft x 8ft area of my lawn levelled to form the foundations of a shed. would you be able to do this? what material would it be finished with? one of the sheds i've seen includes a plastic base...
Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17
Enquiry from: Stephen B
Start Date: Immediate
installation of a relatively small kitchen designed and supplied by howdens. this includes fitting a belfast sink, wooden work tops and moving a couple of power points as well as fitting the cupboard...
Blakeney, Lydney - GL15
Enquiry from: Ellie W
Start Date: Immediate
We have an area of grass which is level at the bottom but slopes upwards mid-top. We would like a retaining wall put in with a couple of steps. We also would like a shed base for a 6x4 installed. Look...
Cinderford, Newnham, Westbury-on-Severn - GL14
Enquiry from: Denise O
Start Date: Less than one month
5 internal hollow doors 2 doorways are complete 1 doorway needs doir stop 2 needs linings and stop i have all materials are you the property owner: owner of the property what type of job are you looki...
Chepstow - NP16
Enquiry from: Mark J
Start Date: Immediate
Decking frame built in back rear garden
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Monmouth | £975-£2,495 |
Carpenters and joiners in Monmouth | £375-£575 |
Plasterboard dry lining in Monmouth | £638-£978 |
Wood flooring in Monmouth | £750-£1,150 |
Wooden decking in Monmouth | £1,125-£1,725 |
Garden shed in Monmouth | £475-£1,595 |
Wooden window repair in Monmouth | £320-£480 |
Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
How To Fit Plasterboard
If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.
To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.
Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.
• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit
• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.
• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.
• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.
Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.
• Drain runs: must be downhill and straight
• Spare conduits: drawstrings
• Soil pipes
• Copper pipes
• Normal pipes
• Doorbell
• Door frames
• Pocket doorframes
• Stairwell
• MVHR (mechanical heat recovery ventilation runs)
• Push-fit or other plastic piping
• Electrical back boxes
• Electricity cable runs
• Telephone, data and audio-visual cables
• Socket location
• Security
• Fire alarm
• Sound insulation
• Plasterboarding
It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.
The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.
Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.
Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.
Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Monmouth.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today