Find a Carpenter you can trust in Ebbw Vale.

Choose from 139 Carpenters, all rated by people like you.

Over 102 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Champion Home Improvements

1 review(s)
Offers services in EBBW VALE
Champion Home Improvements are a well established roofing company that has built up an enviable reputation. Our goal is to...
Verified Pro

J & D Home Improvements

0 review(s)
Offers services in EBBW VALE
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro

BGD Building and Roofing

2 review(s)
Offers services in EBBW VALE
Hard working clean building and roofing boys ready for the next care and repair
Verified Pro
Platinum Fencing Carry out any fencing work that is needed, from weather damaged panels to full take down and replace fenc...
Verified Pro

Multi trade home solutions

0 review(s)
Offers services in EBBW VALE
Serving the local area we take pride in our work . And our reputation have been build on loyalty to our customers over ...
Verified Pro

The Grass Master

0 review(s)
Offers services in EBBW VALE
Established in 2006 The Grass Master Ltd has completed hundreds of landscaping projects across Kent. We cover Artificial L...

Recent Carpenter Enquiries

25 Jul

Garden | Sheds

Ebbw Vale - NP23

Enquiry from: Owain M

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...

Post a similar request >

22 Oct

Kitchen | Fitting

Ebbw Vale - NP23

Enquiry from: Phil R

Start Date: Immediate

Howdens kitchen fitted

Post a similar request >

26 Feb

Carpentry

Ebbw Vale - NP23

Enquiry from: Lisa N

Start Date: Immediate

Change conservatory roof and windows. Price new extension to back of our house.

Post a similar request >

09 Jun

Carpentry

Ebbw Vale - NP23

Enquiry from: Ash L

Start Date: Immediate

I've just moved into a home and had to buy a new washing machine as the previous owners removed the integrated machine they had, however when the new machine arrive the door that was used by the previ...

Post a similar request >

27 Apr

Carpentry

Ebbw Vale - NP23

Enquiry from: A A

Start Date: Immediate

Home owner Cut to size, supply and install kitchen work top, Time scale immediate Contact to Appoint *

Post a similar request >

27 Apr

Kitchen | Fitting

Ebbw Vale - NP23

Enquiry from: A A

Start Date: Immediate

Home owner Fit a complete Kitchen suite Fit only Time scale immediate Contact to Appoint *

Post a similar request >

02 Apr

Garden | Decking

Cwmbran - NP44

Enquiry from: Alan G

Start Date: Immediate

L shape composite decking in grey

Post a similar request >

02 Nov

Carpentry

Pontypridd - CF37

Enquiry from: Kieron D

Start Date: Immediate

wooden conservatory panels require refurbishment

Post a similar request >

11 Oct

Carpentry

Aberdare - CF44

Enquiry from: Angela D

Start Date: 1 to 3 months

new skirting boards fitted are you the property owner: tenant (with permission) property type: semi detached what type of job are you looking to have done: other do you require a door(s): none time sc...

Post a similar request >

05 Oct

Flooring | Wooden

Caerphilly - CF83

Enquiry from: Gill G

Start Date: Immediate

taking up and disposal of wood flooring in hallway very dangerous as i’m disabled thank you. are you the property owner: owner of the property how many rooms are you looking to update with wood flo...

Post a similar request >

14 May

Garden | Decking

Newport - NP11

Enquiry from: Debbie L

Start Date: Immediate

Small decked area with steps and rail and a fence panel

Post a similar request >

08 Feb

Carpentry

Abertillery - NP13

Enquiry from: David J

Start Date: Immediate

Stairs made and fitting to attic

Post a similar request >

29 Jan

Carpentry

Treharris - CF46

Enquiry from: Brian L

Start Date: Immediate

New internal porch door and frame

Post a similar request >

26 Jan

Carpentry

Caerphilly - CF83

Enquiry from: Jayne T

Start Date: Immediate

A new door fitted & new wardrobes built in 2 bedrooms in July and 2 additional doors fitted to bedrooms when complete. Immediate work is new door a*** February when tiler finishes.

Post a similar request >

25 Jan

Garden | Decking

Hengoed - CF82

Enquiry from: Nichola C

Start Date: Immediate

customer in hengoed area has requested that we arrange quotes for their wooden decking project.mrs are considering various options and would like to discuss with a carpenter directly.please call to di...

Post a similar request >

09 Jan

Carpentry

Pontypridd - CF37

Enquiry from: Mark B

Start Date: Immediate

Dormer enlargement, Pitch on small flat roof to be created. I can meet at the house at any time during day light hours and have architect and calculations to assist.

Post a similar request >

26 Oct

Carpentry

Pontypool - NP4

Enquiry from: Mark J

Start Date: Immediate

Hi there! I'm looking for a quote please on the installation of 4 internal door frames and doors. I haven't bought the doors yet. I like the white cottage style doors. Cheers Mark

Post a similar request >

28 Aug

Carpentry

Mountain Ash - CF45

Enquiry from: Ivor H

Start Date: Immediate

6 interior doors to be hung

Post a similar request >

21 Aug

Carpentry

Mountain Ash - CF45

Enquiry from: Ivor H

Start Date: Immediate

6 interior doors to be hung

Post a similar request >

09 Jun

Garden | Decking

Caerphilly - CF83

Enquiry from: Neil P

Start Date: Immediate

Looking for ideas / cost of installing decking on over sloping garden and or sleepers to create terracing.

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Ebbw Vale is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Ebbw Vale £975-£2,495
Carpenters and joiners in Ebbw Vale £375-£575
Plasterboard dry lining in Ebbw Vale £638-£978
Wood flooring in Ebbw Vale £750-£1,150
Wooden decking in Ebbw Vale £1,125-£1,725
Garden shed in Ebbw Vale £475-£1,595
Wooden window repair in Ebbw Vale £320-£480

Related Carpenter searches in Ebbw Vale

Carpenter FAQs

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Ebbw Vale.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Ebbw Vale?

View our open Carpenter jobs near you

Join today
View Shortlist