Garden | Sheds
Halstead - CO9
Enquiry from: Jenny H
Start Date: Immediate
please could I have you best price for Norseman Combi Premier Range 14x8.
-->
Over 79 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Halstead - CO9
Enquiry from: Jenny H
Start Date: Immediate
please could I have you best price for Norseman Combi Premier Range 14x8.
Halstead - CO9
Enquiry from: Alan J
Start Date: 1 to 3 months
replace wooden decking. about 30m2. Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply and deck Time scale: 1-3 months Please call...
Halstead - CO9
Enquiry from: E
Start Date: Immediate
Replace support for existing decking and replace and relay existing g boards
Halstead - CO9
Enquiry from: Wayne F
Start Date: Immediate
Work description: Decking and a fence needs doing Are you the property owner: Tenant (with permission) Property Type: Semi detached What level of service do you require: Supply and deck Time scal...
Haverhill - CB9
Enquiry from: Janis R
Start Date: Immediate
Old fitted wardrobes removed and new ones built
Haverhill - CB9
Enquiry from: Charyl S
Start Date: Immediate
Weeding, grass cut, plants/weeds over growing along fence line removed. Ivy over and around the shed removed.
Sudbury - CO10
Enquiry from: Julia J
Start Date: Less than one month
if possible to rehang a timber internal door on the other side are you the property owner: owner of the property property type: detached what type of job are you looking to have done: other do you req...
Sudbury - CO10
Enquiry from: Julia J
Start Date: Less than one month
i have an internal 15 pane oak door which if possible i would like to have so it opens on the other side to make easier access. are you the property owner: owner of the property property type: detache...
Braintree - CM77
Enquiry from: Beth B
Start Date: Immediate
Quote to replace a porch door, whether sourced myself or through you? The door will need adjusting for the lock and opening handles.
Sudbury - CO10
Enquiry from: Phephile D
Start Date: Immediate
hi, i am interested in a quote for a media wall, if at all possible please? are you the property owner: owner of the property property type: terrace what type of job are you looking to have done: oth...
Sudbury - CO10
Enquiry from: Mary-Jane C
Start Date: Immediate
customer has a gardening & landscaping project they are looking to have done, specially they want quotes for garden shed. they are unsure of options so would like to discuss with a carpenter.confirmed...
Sudbury - CO10
Enquiry from: Steve B
Start Date: Immediate
We are in long Melford - We want- new shed, levelling of old,pathway and and replace with chipping , build new bbq area, new hedge, review and amend to a low maintainable garden. Then follow up with r...
Dunmow - CM6
Enquiry from: Derek M
Start Date: Immediate
i have ordered a new kitchen and need the old one removed and the new one installed. are you the property owner: owner of the property what level of service do you require: install only do you have al...
Colchester - CO3
Enquiry from: ZAHRA M
Start Date: Immediate
3 new doors to be hanged .01/09/2022 afternoon are you the property owner: owner of the property property type: other what type of job are you looking to have done: wooden window/doors how many window...
Colchester - CO3
Enquiry from: Johanna G
Start Date: Immediate
4 internal doors need trimming after carpet was fitted are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors how many windows do you need...
Colchester - CO2
Enquiry from: Gavin E
Start Date: Less than one month
hello i have 8 internal doors i need hanging please, brand new hollow doors, ive brought all the hinges and handles etc, cheapest i have been qouted so far is £50 per door so thats £400, which is mo...
Colchester - CO4
Enquiry from: ROBERT M
Start Date: Immediate
fit a 4.8 metre x 3.6 metre wooden decking in back garden … just fitting required as all items required for the work to be done are already supplied are you the property owner: owner of the property...
Colchester - CO4
Enquiry from: Maria A
Start Date: Immediate
2 internal doors need to be trimmed in order to fit are you the property owner: tenant (with permission) property type: other what type of job are you looking to have done: wooden window/doors how man...
Colchester - CO3
Enquiry from: William J
Start Date: Immediate
6.5 sq m decking in front of a garage conversion is soft natural wood - 210 x 300 cm are you the property owner: relative of owner property type: semi detached what level of service do you require: s...
Colchester - CO5
Enquiry from: David M
Start Date: Immediate
grass cutting, area approx *** plus possible shed maintance are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: supply other forms...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2024 |
---|---|
Kitchen Fitting in Halstead | £1,238-£3,748 |
Carpenters and joiners in Halstead | £375-£575 |
Plasterboard dry lining in Halstead | £638-£978 |
Wood flooring in Halstead | £750-£1,150 |
Wooden decking in Halstead | £1,125-£1,725 |
Garden shed in Halstead | £450-£690 |
Wooden window repair in Halstead | £210-£740 |
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Halstead.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today