Find a Carpenter you can trust in St Leonards-on-sea.

Choose from 307 Carpenters, all rated by people like you.

Over 221 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in ST LEONARDS-ON-SEA
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in ST LEONARDS-ON-SEA
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified ProOver 10 Reviews

Home Counties driveways and patios

13 review(s)
Offers services in ST LEONARDS-ON-SEA
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

White Cliff Gardens

2 review(s)
Offers services in ST LEONARDS-ON-SEA
We cater for all your gardening/landscaping needs. 
We offer a wide range of services to suit all budgets, including: •...
Verified Pro

Controlled Airflow Services

0 review(s)
Offers services in ST LEONARDS-ON-SEA
We are a small, family run business with 10 years experience in the industry and specialise in all aspects of air conditio...
Verified Pro

Jm2TilingCo

0 review(s)
Offers services in ST LEONARDS-ON-SEA
Here at Jm2TilingCo standards are kept to the absolute highest level. I will always leave a job clean and well done, plus ...

Recent Carpenter Enquiries

11 Sep

Carpentry

St. Leonards-on-Sea - TN38

Enquiry from: Jolene P

Start Date: Less than one month

adjust and rehang internal door. are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/doors what level of service do y...

Post a similar request >

23 Feb

Garden | Decking

St. Leonards-on-Sea - TN38

Enquiry from: Liz B

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a carpenter.confir...

Post a similar request >

13 Jan

Garden | Decking

St. Leonards-on-Sea - TN37

Enquiry from: Lee E

Start Date: Immediate

customer made an enquiry for garden maintenance and confirmed on the quotatis site they would like quotes from a landscaper.mrs lives in the st. leonards-on-sea area and would like a call to discuss o...

Post a similar request >

13 Jan

Garden | Decking

St. Leonards-on-Sea - TN37

Enquiry from: Lee E

Start Date: Immediate

i have about 20 meter x 2 meter wide wood decking veranda. house is about 15 years old and this is original decking, a lot of holes and the hand rails are rotten. i need a quote to repair and refurnis...

Post a similar request >

09 Mar

Garden | Decking

St. Leonards-on-Sea - TN37

Enquiry from: David H

Start Date: Immediate

to remove existing decking boards and replace with carbonised (grey) millboard. the structure is approximately 16 years old and the posts and railings are in good condition receiving annual attention....

Post a similar request >

27 Dec

Interior work | Stud Walls

St. Leonards-on-Sea - TN38

Enquiry from: Sara S

Start Date: Immediate

One large room split into 3 smaller rooms or 2 rooms

Post a similar request >

27 Aug

Carpentry

St. Leonards-on-Sea - TN37

Enquiry from: Paula P

Start Date: Immediate

assemble an ikea soderhamn sofa. time scale: immediate please call to appoint

Post a similar request >

15 Jul

Carpentry

St. Leonards-on-Sea - TN38

Enquiry from: MS A

Start Date: Immediate

disassembly of existing lean to. assembly of reverse pent roof bespoke lean to 12 ft x 6ft, attached to side of house 3 windows..door both gable ends. polycarbonate roof. existing rafters.existing con...

Post a similar request >

04 May

Garden | Decking

St. Leonards-on-Sea - TN38

Enquiry from: Saad A

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Cleaning and removal of trash Are you the property owner: Owner of the property P...

Post a similar request >

15 Apr

Flooring | Wooden

St. Leonards-on-Sea - TN37

Enquiry from: Stephen F

Start Date: Immediate

price for fitting carpet and underlay 45 square metres front room/hall and bedroom also price for fitting wooden flooring for the same measurements

Post a similar request >

30 Oct

Carpentry

St. Leonards-on-Sea - TN38

Enquiry from: Christopher H

Start Date: Less than one month

multiple part job. 1. low built in tv unit with shelving above. 2. book shelves built into three sides of recess. 3.shelves built into alcove in kitchen over fridge. contemporary taste. Time scale: Le...

Post a similar request >

08 Aug

Garden | Decking

St. Leonards-on-Sea - TN38

Enquiry from: Richard M

Start Date: Immediate

Plastic decking plus two sets of steps plus 3 sets of ballustrade.

Post a similar request >

15 Apr

Garden | Decking

St. Leonards-on-Sea - TN37

Enquiry from: Sarah S

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: The whole garden needs some TLC. Existing decking is in a poor state and it may...

Post a similar request >

20 Mar

Garden | Decking

St. Leonards-on-Sea - TN37

Enquiry from: Emily T

Start Date: Immediate

Property type: Detached Work description: A moderate sized garden with lawn (weeds and miss) with boarder of shrubs many of which are over grown, an old patio with a small area of rotten decking comi...

Post a similar request >

30 Mar

Garden | Decking

St. Leonards-on-Sea - TN38

Enquiry from: Tracy B

Start Date: Less than one month

Wood decking area. Are you the property owner: Owner of the property Property Type: Semi detached What level of service do you require: Supply and deck Time scale: Less than one month

Post a similar request >

26 Feb

Kitchen | Fitting

St. Leonards-on-Sea - TN38

Enquiry from: Pauline G

Start Date: Immediate

Duel Fuel Range cooker to be fitted. Cooker Hood to be fitted. Sink and taps to be fitted. splash back to cooker to be fitted and New Work tops to be fitted Are you the property owner: Owner of the...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in St Leonards-on-sea is:

£1,018

Carpenter job Carpenter cost in 2025
Kitchen Fitting in St Leonards-on-sea £1,238-£3,748
Carpenters and joiners in St Leonards-on-sea £375-£575
Plasterboard dry lining in St Leonards-on-sea £638-£978
Wood flooring in St Leonards-on-sea £750-£1,150
Wooden decking in St Leonards-on-sea £1,125-£1,725
Garden shed in St Leonards-on-sea £450-£690
Wooden window repair in St Leonards-on-sea £320-£480

Related Carpenter searches in St Leonards-on-sea

Carpenter FAQs

Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in St Leonards-on-sea.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in St Leonards-on-sea?

View our open Carpenter jobs near you

Join today
View Shortlist