Find a Carpenter you can trust in East Lothian.

Choose from 105 Carpenters, all rated by people like you.

Over 57 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Garden Bros

0 review(s)
Offers services in EAST LOTHIAN
Garden Clean - ups & First cuts We are a Family run, Fully insured business. We are reliable, trustworthy and are reaso...
Verified Pro

K&D joinery

0 review(s)
Offers services in EAST LOTHIAN
We’re just a small building firm with just 10 men We cover all areas from Glasgow. Edinburgh. Perth. Dundee Fife. Stirl...
Verified Pro

Composite Decking Glasgow

0 review(s)
Offers services in EAST LOTHIAN
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro

Hutchison garden services

0 review(s)
Offers services in EAST LOTHIAN
Landscaping business Fencing decking turf driveways paving
Verified Pro

Boxelder Landscapes

0 review(s)
Offers services in EAST LOTHIAN
We have the hard landscaping skills to create your dream garden. Working from a idea or along side designers and architect...
Verified Pro

Mownngrown Garden Maintenance

0 review(s)
Offers services in EAST LOTHIAN
All garden work private contract professional qualified gardeners at competitive prices no job too small

Recent Carpenter Enquiries

28 Apr

Garden | Decking

Haddington - EH41

Enquiry from: Danielle M

Start Date: Immediate

help lawn mad would like to transform garden over time so it's nice to sit and enjoy are you the property owner: tenant (with permission) property type: semi detached do you have a: small garden garde...

Post a similar request >

02 Aug

Carpentry

Longniddry - EH32

Enquiry from: Aleksandra M

Start Date: Immediate

install stair runner - installation only

Post a similar request >

20 Jun

Windows | Wooden | Repair

Haddington - EH41

Enquiry from: Val R

Start Date: 1 to 3 months

2nd floor flat in dunbar. hardwood d.g bedroom window broken frame at bottom left hand joint. believed repairable as frame only-glass unit intact. please help- are you the property owner: owner of t...

Post a similar request >

28 May

Garden | Sheds

Longniddry - EH32

Enquiry from: Steven M

Start Date: Immediate

supply shed base only and install & build an existing shed. what level of service are you looking for: install do you have a: medium size garden are you the property owner: tenant (with permission) p...

Post a similar request >

06 Jul

Windows | Wooden | Repair

Dunbar - EH42

Enquiry from: Kimberley C

Start Date: Immediate

Customer is looking for quotes for Wooden Window Repair from pros around Dunbar. Please call to arrange appointment to discuss

Post a similar request >

26 Dec

Garden | Decking

Dunbar - EH42

Enquiry from: Melanie W

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Landscaping of garden, decking, seating area, pizza oven wood burner, garden ma...

Post a similar request >

17 Nov

Garden | Decking

Longniddry - EH32

Enquiry from: William G

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Maybe design for hot tub barbecue area and landscape Are you the property owner...

Post a similar request >

17 Nov

Garden | Decking

Longniddry - EH32

Enquiry from: William G

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Maybe design for hot tub barbecue area and landscape Are you the property owner...

Post a similar request >

15 Nov

Carpentry

Haddington - EH41

Enquiry from: Richard D

Start Date: Immediate

Dismantle and removal of a one car garage. Time scale: Immediate Please call to appoint

Post a similar request >

06 Jul

Garden | Decking

Longniddry - EH32

Enquiry from: Kaitlin W

Start Date: Immediate

Submit your free quote for rated tradespeople

Post a similar request >

17 May

Kitchen | Fitting

Longniddry - EH32

Enquiry from: Kenneth D

Start Date: Immediate

Fit 60cm cooker hood (company to supply ducting) to outside wall (stone walls- 15 " thick). Are you the property owner: Tenant (with permission) What level of service do you require: Install Only Do y...

Post a similar request >

30 Nov

Carpentry

Tranent - EH33

Enquiry from: Rosemary C

Start Date: Immediate

To fit 7 pre-finished doors, already on order. Not expected to be delivered before March 2018

Post a similar request >

02 May

Garden | Decking

Longniddry - EH32

Enquiry from: PETER M

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: DECKING ,LEVELING OF GROUND, PUTTING DOWN TURF AND ENCING Are you the property o...

Post a similar request >

02 May

Garden | Decking

Longniddry - EH32

Enquiry from: PETER M

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: DECKING ,LEVELING OF GROUND, PUTTING DOWN TURF AND ENCING

Post a similar request >

01 May

Garden | Decking

Tranent - EH33

Enquiry from: Lisa E

Start Date: Immediate

Decking and installation

Post a similar request >

25 Apr

Carpentry

Dunbar - EH42

Enquiry from: Maggie C

Start Date: Immediate

Skirting boards to be applied to small living room

Post a similar request >

08 Mar

Flooring | Wooden

Longniddry - EH32

Enquiry from: Jacqui M

Start Date: Immediate

Product Material: Hardwood

Post a similar request >

06 Jun

Garden | Decking

Tranent - EH33

Enquiry from: Ian M

Start Date: 1 to 3 months

Looking for a quote for decking in a back garden 3.6m x 5.4m Please provide quotes Many thanks Are you the property owner: Owner of the property Property Type: Detached Time scale: 1-3 month...

Post a similar request >

03 Jun

Garden | Decking

Tranent - EH33

Enquiry from: Graham K

Start Date: Less than one month

Would like backhanded decked. Approx 25sq m. Advice and quote required. Property Type: Detached What level of service do you require: Supply and deck Time scale: Less than one month Are you the prop...

Post a similar request >

17 May

Garden | Decking

Dunbar - EH42

Enquiry from: Sarah F

Start Date: Immediate

lookind to deck out my back garden and want to get an idea how much it will cost - Estimated Service Date: 06/06/2016 - Estimated Decking Area (sq ft): 322 - Reason for Request: To just have an idea ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in East Lothian is:

£807

Carpenter job Carpenter cost in 2024
Kitchen Fitting in East Lothian £975-£2,495
Carpenters and joiners in East Lothian £375-£575
Plasterboard dry lining in East Lothian £638-£978
Wood flooring in East Lothian £750-£1,150
Wooden decking in East Lothian £613-£1,363
Garden shed in East Lothian £275-£845
Wooden window repair in East Lothian £320-£480

Related Carpenter searches in East Lothian

Carpenter FAQs

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in East Lothian.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in East Lothian?

View our open Carpenter jobs near you

Join today
View Shortlist