Find a Carpenter you can trust in Thornhill.

Choose from 37 Carpenters, all rated by people like you.

Over 19 reviews & an average rating of 4.8/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Commercial Flooring Contractors NI is a trading style of Trade Flooring NI Ltd. Trade Floors NI supply and fit commercial...
Verified Pro
Kitchens and Bathroom showroom. Nolte German kitchen designers and installers kitchens and bathrooms to homes across Cumbr...
Verified Pro

Composite Decking Glasgow

0 review(s)
Offers services in THORNHILL
Composite Decking Glasgow was founded in 2008 and remains a family-operated venture. Our inception was driven by a singula...
Verified Pro

Toplineroofing & gutters

0 review(s)
Offers services in THORNHILL
We cover all aspects of gutter repairs Gutter cleaning Roof cleaning New gutter installation Drip felt Dry verdge

Recent Carpenter Enquiries

29 Aug

Kitchen | Fitting

Thornhill - DG3

Enquiry from: John M

Start Date: Immediate

Mobile shelf needs to be re-attached.

Post a similar request >

04 May

Garden | Decking

Thornhill - DG3

Enquiry from: Veronica M

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

decking area 23ft by 12ft approx , with pagola. price to include materials and work including vat so total cost to me please all in for framework plus decking and a pargola with 8 upright 4 by 4 post...

Post a similar request >

15 Mar

Garden | Sheds

Dumfries - DG2

Enquiry from: Katie-Jo J

Start Date: Immediate

A metal shed that i will purchase to be assembled, already have paving slabs laid

Post a similar request >

09 May

Kitchen | Fitting

Dumfries - DG1

Enquiry from: Allyson B

Start Date: Immediate

to fit a new worktop, sink, tap and install a new dishwasher where drawers are currently. are you the property owner: owner of the property what level of service do you require: install only do you ha...

Post a similar request >

29 Apr

Kitchen | Fitting

Dumfries - DG1

Enquiry from: Allyson B

Start Date: Immediate

to fit a new worktop, sink, tap and install a new dishwasher where drawers are currently. are you the property owner: owner of the property what level of service do you require: install only do you ha...

Post a similar request >

12 Oct

Garden | Decking

Dumfries - DG1

Enquiry from: Iain C

Start Date: Immediate

decking to rear of lodge using decking materials already obtained-have been let down by original installation firm after waiting 10 or more weeks. area is clear and materials are already in situ. are ...

Post a similar request >

29 Jul

Interior work | Stud Walls

Sanquhar - DG4

Enquiry from: Charlotte W

Start Date: Immediate

A room split with a stud wall

Post a similar request >

13 Dec

Garden | Decking

Dumfries - DG2

Enquiry from: Theresa K

Start Date: Immediate

customer in the dumfries area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the pr...

Post a similar request >

10 Dec

Garden | Decking

Dumfries - DG1

Enquiry from: John G

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a carpenter.confir...

Post a similar request >

23 Sep

Garden | Sheds

Dumfries - DG2

Enquiry from: Pat B

Start Date: Immediate

we would like a quote please to erect a meter artisan 7x7 shed please are you the property owner: owner of the property do you have a: unsure what level of service are you looking for: install please...

Post a similar request >

03 May

Garden | Sheds

Dumfries - DG2

Enquiry from: Ann-Marie B

Start Date: Immediate

large garden shed (rotten) and contents to be removed. new shed yo be built. are you the property owner: owner of the property what level of service are you looking for: supply, install, removal of o...

Post a similar request >

23 Sep

Kitchen | Fitting

Dumfries - DG1

Enquiry from: Heather R

Start Date: Immediate

are you the property owner: owner of the property other forms: kitchen design & installation, kitchen fitting agreed to receive quotes for selected products: yes please call to appoint what level of ...

Post a similar request >

24 Aug

Carpentry

Dumfries - DG2

Enquiry from: Kenneth C

Start Date: Immediate

removal of back door and replace with new one also to advise what to maybe buy time scale: immediate please call to appoint

Post a similar request >

27 Jul

Carpentry

Dumfries - DG2

Enquiry from: Raymond B

Start Date: Immediate

2 doors trimming & outdoor electrical socket fitted, 2 outdoor lights changed, decking cleaned and painted. time scale: immediate please call to appoint

Post a similar request >

19 Jul

Garden | Sheds

Dumfries - DG1

Enquiry from: Joan M

Start Date: Immediate

good quality garden shed. remove existing shed...erect new shed. prepare site are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: ...

Post a similar request >

13 Jul

Carpentry

Dumfries - DG2

Enquiry from: Carol B

Start Date: Immediate

shed base needed and 6 x4 shed built time scale: immediate please call to appoint

Post a similar request >

26 Feb

Garden | Sheds

Dumfries - DG2

Enquiry from: Dave S

Start Date: Immediate

Looking for a good quality Tanalised 10x8 shed with 2/3 side windows and pref.Double doors.Together with wooden base to suit and all fitted. Are you the property owner: Owner of the property What leve...

Post a similar request >

05 Feb

Garden | Sheds

Sanquhar - DG4

Enquiry from: Keith L

Start Date: Immediate

garden shed Are you the property owner: Tenant (with permission) Do you have a: Medium size garden What level of service are you looking for: Supply, Install Please call to appoint Please call to appo...

Post a similar request >

18 Jan

Garden | Sheds

Dumfries - DG2

Enquiry from: Brenda J

Start Date: Immediate

Garden shed with dismantle old shed and erection of new shed Are you the property owner: Owner of the property What level of service are you looking for: Supply, Install, Removal of old Do you have ...

Post a similar request >

05 Nov

Garden | Sheds

Dumfries - DG2

Enquiry from: Isabel M

Start Date: Immediate

Looking for a price for an 8x6 garden shed Are you the property owner: Tenant (with permission) What level of service are you looking for: Supply

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Thornhill is:

£807

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Thornhill £975-£2,495
Carpenters and joiners in Thornhill £375-£575
Plasterboard dry lining in Thornhill £638-£978
Wood flooring in Thornhill £750-£1,150
Wooden decking in Thornhill £613-£1,363
Garden shed in Thornhill £275-£845
Wooden window repair in Thornhill £320-£480

Related Carpenter searches in Thornhill

Carpenter FAQs

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Thornhill.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Thornhill?

View our open Carpenter jobs near you

Join today
View Shortlist