Find a Carpenter you can trust in Torrington.

Choose from 75 Carpenters, all rated by people like you.

Over 144 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

First Choice

65 review(s)
Offers services in TORRINGTON
A business with customer satisfaction guaranteed, we aim to please with our workmanship, good reliable company. No job to ...
Verified Pro

Expert Home Improvements

0 review(s)
Offers services in TORRINGTON
We specialise in driveways and roofing. We are based in Exeter and Plymouth all the work is done to a very high standard a...
Verified Pro
Here at first choice drives and patios we offer a wide ranges of finishes and the possibility’s are limitless we aim to im...
Verified Pro

Dymond finish

0 review(s)
Offers services in TORRINGTON
Hi I'm sam here at dymond finish we offer a professional and clean finish to all works carried out, we pride ourselves in ...

Recent Carpenter Enquiries

29 Jan

Flooring | Wooden

Torrington - EX38

Enquiry from: T

Start Date: Immediate

I will supply solid oak floors I need 20msq laid on concrete.

Post a similar request >

04 Apr

Garden | Decking

Holsworthy - EX22

Enquiry from: Jane R

Start Date: Immediate

raised decking along the front of my bungalow app*** *** high with a rail and steps are you the property owner: owner of the property property type: semi detached what level of service do you require:...

Post a similar request >

06 Nov

Garden | Sheds

North Tawton, Okehampton - EX20

Enquiry from: William H

Start Date: Immediate

Garden shed fitted, wood large door

Post a similar request >

19 Jul

Carpentry

Barnstaple - EX32

Enquiry from: Liam D

Start Date: Immediate

Hi I was wondering if you would like to take an hard working apprentice

Post a similar request >

13 Apr

Carpentry

Bideford - EX39

Enquiry from: Stuart M

Start Date: Immediate

Hello, we have a lodge at Hartland Forest Golf Club. The front steps need replacing. Is this something you’d consider?

Post a similar request >

06 Mar

Carpentry

Barnstaple - EX32

Enquiry from: Peter Y

Start Date: Immediate

Following a fire risk assessment our 1950s built property that we holiday let needs all it's internal doors replaced with doors that comply with fire retardent regs. Plus a sliding door needs to be re...

Post a similar request >

06 Jan

Carpentry

Bideford - EX39

Enquiry from: James H

Start Date: Immediate

Hi Jack I am in the process of preparing to renovate my property. The list of carpentry jobs is long and includes new staircase, stud wall alterations, new door frames, woodwork, followed by a lo...

Post a similar request >

04 Nov

Carpentry

North Tawton, Okehampton - EX20

Enquiry from: Clare K

Start Date: Immediate

Wooden window repair Lead

Upgrade or replace wooden front door with another

Post a similar request >

01 Nov

Carpentry

Barnstaple - EX32

Enquiry from: Zara R

Start Date: Immediate

Hi there I wonder if you would be able to help. We have an indoor stair / door guard that we could do with being made a little bigger - if you're able to help with this kind of thing? The it...

Post a similar request >

20 Oct

Garden | Sheds

North Tawton, Okehampton - EX20

Enquiry from: Michele B

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

remove garden shed to a different part of the garden are you the property owner: owner of the property what level of service are you looking for: install, removal of old do you have a: small garden o...

Post a similar request >

12 Oct

Carpentry

North Tawton, Okehampton - EX20

Enquiry from: Clare K

Start Date: Immediate

Wooden window repair Lead

My wooden front door has a broken letterbox and fragile/drafty glass panel. I would like to install a new letterbox and wooden double glazed panel. Also my front double glazed wooden window won't cl...

Post a similar request >

04 Oct

Garden | Sheds

Holsworthy - EX22

Enquiry from: Shay M

Start Date: Immediate

Need garden landscaped turf put down and shed built

Post a similar request >

29 Sep

Garden | Sheds

Bideford - EX39

Enquiry from: Jaqueline M

Start Date: Immediate

hi i am looking for someone to come and quote for my front and back garden. we have just moved into the property and there are a number of bushes and trees that need either removing or pruning. plus t...

Post a similar request >

19 Aug

Carpentry

Barnstaple - EX31

Enquiry from: Nimmy M

Start Date: Immediate

Remove an existing kitchen cupboard for the purpose of fitting a a dishwasher.

Post a similar request >

12 Apr

Garden | Sheds

Holsworthy - EX22

Enquiry from: David V

Start Date: Immediate

landscaping and shed base for a *** garden shed. are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: install please call to appoin...

Post a similar request >

04 Mar

Garden | Decking

Braunton - EX33

Enquiry from: Rhona W

Start Date: Immediate

customer in braunton area has requested that we arrange quotes for their wooden decking project.mrs are considering various options and would like to discuss with a carpenter directly.please call to d...

Post a similar request >

16 Jan

Garden | Decking

Bideford - EX39

Enquiry from: Lucy T

Start Date: Immediate

sea facing verandah needs repairing/updating. looking for a quote. it will need a skilled problem-solver for this job. are you the property owner: owner of the property property type: detached what l...

Post a similar request >

28 Sep

Garden | Decking

Bideford - EX39

Enquiry from: Lois W

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a carpenter.confir...

Post a similar request >

26 Sep

Garden | Decking

Bideford - EX39

Enquiry from: ROBERT H

Start Date: Immediate

our holiday lodge is currently being built. we expect to be in a position to erect decking in early november. the deck dimensions are approx 15.9m x 3.75m . we have chosen cladco premium pvc decking b...

Post a similar request >

19 May

Carpentry

Bideford - EX39

Enquiry from: Sandy C

Start Date: Less than one month

to fit an internal wooden door are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors time scale: less than one month what level of servic...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Torrington is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Torrington £975-£2,495
Carpenters and joiners in Torrington £375-£575
Plasterboard dry lining in Torrington £638-£978
Wood flooring in Torrington £750-£1,150
Wooden decking in Torrington £1,125-£1,725
Garden shed in Torrington £475-£1,595
Wooden window repair in Torrington £320-£480

Related Carpenter searches in Torrington

Carpenter FAQs

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
Can I install wooden flooring myself?

Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look!  Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe.  Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs.  Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Torrington.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Torrington?

View our open Carpenter jobs near you

Join today
View Shortlist