Find a Carpenter you can trust in South Brent.

Choose from 36 Carpenters, all rated by people like you.

Over 79 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

AF bathroom and heating

0 review(s)
Offers services in SOUTH BRENT
We are a proud bathroom and heating company. We treat every job as our own and strive for your satisfaction to deliver a...
Verified Pro

First choice drives and patios

0 review(s)
Offers services in SOUTH BRENT
Here at first choice drives and patios we offer a wide ranges of finishes and the possibility’s are limitless we aim to im...
Verified Pro

Alltrades

0 review(s)
Offers services in SOUTH BRENT
Master Multi Tradesman

Recent Carpenter Enquiries

26 Jul

Kitchen | Fitting

South Brent - TQ10

Enquiry from: P

Start Date: Immediate

To install a ready built kitchen the worktop needs to be cut

Post a similar request >

21 Jul

Garden | Decking

Totnes - TQ9

Enquiry from: Sophia D

Start Date: Immediate

Decking, weed control, landscaping, fencing.

Post a similar request >

06 Jul

Carpentry

Brixham - TQ5

Enquiry from: Karen P

Start Date: Immediate

I am looking for a quote to for fitted cupboards in a loft main bedroom under the eaves of the roof

Post a similar request >

12 May

Garden | Sheds

Kingsbridge - TQ7

Enquiry from: Simon E

Start Date: Immediate

The garden shed needs a new roof and window the door I think can be repaired. However the roof is critical issue I can get the window and door fixed at later date. The shed is brick with a sloped roo...

Post a similar request >

26 Apr

Carpentry

Ivybridge - PL21

Enquiry from: Dawn M

Start Date: Immediate

Wooden window repair Lead

Removing and Rebuilding to a wooden corner box and fitting a pine wooden top in a bedroom. Approx 140x60 cm in size. I can send a photo of space .

Post a similar request >

21 Apr

Carpentry

Salcombe - TQ8

Enquiry from: Doyle S

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Wooden bay window is needed to be replaced.

Post a similar request >

21 Mar

Carpentry

Kingsbridge - TQ7

Enquiry from: Wilder A

Start Date: Immediate

why are you on my account information?

Post a similar request >

06 Mar

Carpentry

Plymouth - PL7

Enquiry from: David P

Start Date: Immediate

Need to doors internal to be put up one a fire door six panel and one 6 panel bedroom door

Post a similar request >

26 Jan

Carpentry

Kingsbridge - TQ7

Enquiry from: Alix N

Start Date: 1 to 3 months

we have a couple of nice projects ongoing in thurlestone. a new build, kinnasea, and a renovation, warren house. we would like to send you the joinery packages for tender. are you interested? our pre...

Post a similar request >

22 Jan

Carpentry

Ivybridge - PL21

Enquiry from: William C

Start Date: Immediate

Hello, interested in removing a stud wall dividing kitchen from living room. There is a wooden staircase attached to the wall which may need alterations or replacing. Not urgent work, interested in do...

Post a similar request >

19 Jan

Carpentry

Ivybridge - PL21

Enquiry from: Brian L

Start Date: Immediate

Hi Paul, I want to replace my kitchen worktops, also replace the ceramic floor tiles with LVT flooring. Advise on option i.e. click or glue down would be appreciated. I'm not looking to do this until...

Post a similar request >

16 Jan

Carpentry

Kingsbridge - TQ7

Enquiry from: Dominic M

Start Date: 1 to 3 months

i have a double glazed sash window where the bottom panel is rotting. the wood needs replacing. is this something you can help with? are you the property owner: owner of the property what type of job ...

Post a similar request >

14 Jan

Carpentry

Ivybridge - PL21

Enquiry from: Jo A

Start Date: Immediate

Hi, I’ve got a solid oak headboard that’s come out of storage with a great big stain on it. It needs sanding/planing out and refinishing - plus: replacing two internal window ledges and some repai...

Post a similar request >

05 Jan

Carpentry

Kingsbridge - TQ7

Enquiry from: Vivienne M

Start Date: Immediate

New front door and surrounds. New double glazed bay windows (4) and frames, sill. Some dry lining .

Post a similar request >

04 Jan

Carpentry

Brixham - TQ5

Enquiry from: Steve D

Start Date: Immediate

Replacement of main entrance wooden door frame and step, rehang existing wooden single glaze door, would consider new door. All like-for-like materials and style due to planning restrictions.

Post a similar request >

03 Jan

Carpentry

Brixham - TQ5

Enquiry from: Adrian F

Start Date: Immediate

A new front door, draught proof with double glazed top light

Post a similar request >

07 Dec

Carpentry

Salcombe - TQ8

Enquiry from: Gill R

Start Date: Immediate

A large oak dining table requires stripping down completely it the requires making good and given a light oak stain . The table is too narrow so it also needs some oak added to each side. Thank you

Post a similar request >

29 Oct

Carpentry

Ivybridge - PL21

Enquiry from: Christopher S

Start Date: Immediate

New staircase (metal spiral stairs to be removed) and replacement wardrobes - plans and photos available if helpful).

Post a similar request >

06 Oct

Carpentry

Brixham - TQ5

Enquiry from: Kelly B

Start Date: Immediate

I am wanting my kitchen work tops replaced I have found the ones I like, which are oak

Post a similar request >

02 Oct

Carpentry

Ivybridge - PL21

Enquiry from: Nicky P

Start Date: Immediate

Hello - I think the two white wooden posts holding the front porch up need replacing, the right one in particular has gone all squidgy at the base. Please could you take a look and see if it's somethi...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in South Brent is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in South Brent £975-£2,495
Carpenters and joiners in South Brent £375-£575
Plasterboard dry lining in South Brent £638-£978
Wood flooring in South Brent £750-£1,150
Wooden decking in South Brent £1,125-£1,725
Garden shed in South Brent £450-£690
Wooden window repair in South Brent £320-£480

Related Carpenter searches in South Brent

Carpenter FAQs

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in South Brent.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in South Brent?

View our open Carpenter jobs near you

Join today
View Shortlist