- Plan your shed base
You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
- A concrete base laid on hardcore
- Concrete slabs on sharp sand
- Treated wood beams on hardcore or shingle
- An interlocking plastic system
- Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
- Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
- Put up the shed walls
- Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
- Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
- Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
- Fit the roof
- If the shed comes with a support bar, put this in position before you put the roof panels in.
- Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
- Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
- Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
- Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
- Add the shed windows
- Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
- From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
- Fix the window beading on the top and sides with 25mm nails.
- Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Find a Carpenter you can trust in Coniston.
Choose from 57 Carpenters, all rated by people like you.
Over 65 reviews & an average rating of 4.3/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you


JPW property care


M6 Flooring


Jd paving


Lakes Joinery Co.


Banks Flooring Solutions
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Coniston is:
£879
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Coniston | £975-£2,495 |
Carpenters and joiners in Coniston | £375-£575 |
Plasterboard dry lining in Coniston | £638-£978 |
Wood flooring in Coniston | £750-£1,150 |
Wooden decking in Coniston | £1,125-£1,725 |
Garden shed in Coniston | £450-£690 |
Wooden window repair in Coniston | £320-£480 |
Carpenter FAQs
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.
If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.
Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.
Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.
Parquet flooring is long lasting and very attractive, but quite expensive to have fitted. You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.
The cost of just the engineered wood flooringis from £18 to £73 per m2.
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
- If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
- Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
- Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
- Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
- Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Coniston.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Coniston?
View our open Carpenter jobs near you
Join today