Find a Carpenter you can trust in Appleby-in-westmorland.

Choose from 35 Carpenters, all rated by people like you.

Over 55 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

MpLogic

0 review(s)
Offers services in APPLEBY-IN-WESTMORLAND
Verified Pro

JPW property care

0 review(s)
Offers services in APPLEBY-IN-WESTMORLAND
We are a Family run business . With over 35 years experience. Between us with our small team. we pride ourselves on our ho...
Verified Pro

M6 Flooring

0 review(s)
Offers services in APPLEBY-IN-WESTMORLAND
M6 Flooring Ltd is a family business that fits and restores wooden flooring and vinyl flooring, we also fit wood and vinyl...
Verified Pro

Lakes Joinery Co.

0 review(s)
Offers services in APPLEBY-IN-WESTMORLAND
Expert joiners offering a wide range of services to customers in Ulverston, Barrow and the surrounding areas.
Verified Pro

Lakeland Kitchens and Bathrooms

0 review(s)
Offers services in APPLEBY-IN-WESTMORLAND
Kitchens and Bathroom showroom. Nolte German kitchen designers and installers kitchens and bathrooms to homes across Cumbr...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Appleby-in-westmorland is:

£879

Carpenter job Carpenter cost in 2024
Kitchen Fitting in Appleby-in-westmorland £975-£2,495
Carpenters and joiners in Appleby-in-westmorland £375-£575
Plasterboard dry lining in Appleby-in-westmorland £638-£978
Wood flooring in Appleby-in-westmorland £750-£1,150
Wooden decking in Appleby-in-westmorland £1,125-£1,725
Garden shed in Appleby-in-westmorland £450-£690
Wooden window repair in Appleby-in-westmorland £320-£480

Related Carpenter searches in Appleby-in-westmorland

Carpenter FAQs

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to find an installer for wooden flooring?

After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.

• Friends, Relatives & Neighbours

If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.

• Store Contact Lists

You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.

• Internet

With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.

Click here to learn more about wood flooring.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Appleby-in-westmorland.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Appleby-in-westmorland?

View our open Carpenter jobs near you

Join today
View Shortlist